RAILROAD CORRIDOR QUIET ZONES A Quality of Life Solution.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Quiet Zone Joint Police & Streets Committee Meeting Village of Glendale January 16, 2007.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail.
National Bridge Inspection Standards (NBIS)
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Locomotive Horn Rule Regulations
Way Side Warning System Toth Industries, LLC Arlington Heights, IL T rackside.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
Florida Department of Transportation, November 2009
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Exposition Metro Line Construction Authority Safety Overview March 1, 2007 Exposition Light Rail Transit Project.
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Safety Audit Components Safety assessment for risk Management.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Module 13: Highway-Rail Grade Crossings (HRGC)
1 FRA’s Grade Crossing Safety Program 2012 Southeastern Rail Highway Safety Conference Charlotte, NC.
2015 Traffic Signals 101 Topic 1 Why?. Office of Traffic, Safety, and Technology Why? Who initiates a signal? Developer City/County Politician Public.
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
Manual on Uniform Traffic Control Devices Aren Cambre
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Federal Railroad Administration's Ruling:
PRODUCT TRANSFER.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Metro Gold Line Eastside Extension Four Quadrant Gate Feasibility Study Summary.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Crossing Closures & Quiet Zones National Association of Counties Rail Conference Naperville, Illinois April 2011.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Quiet Zone along FEC Corridor Paul Calvaresi Broward MPO 1.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
1 Update on Efforts to Reduce Emissions and Risks at High Risk Railyards February 25, 2010 BNSF San Bernardino California Environmental Protection Agency.
“Think Systematically” A Common Sense Approach to Crossing Safety May 20, 2008 Craig N. Rasmussen, P.E. Manager Public Projects.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.
1 Eagle P3 Project Update FasTracks Monitoring Committee May 12, 2015.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
6/12/2016 FRA – Office of Railroad Safety Moving America Forward F E D E R A L R A I L R O A D A D M I N I S T R A T I O N F RA Regulatory Activity Update.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Ismael Garza, P.E., PTOE NDOT Traffic Operations Wednesday, September 16, 2015.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Identification of High Crash Locations – Session #2.
Rail Safety Improvement Act of 2008 Crossing Safety & Trespass Prevention: Impacts and Required Action (Public Law ) Railroad Safety Advisory Committee.
Railroad Quiet Zone (RRQZ) And Crossing Safety Improvement Project.
INDOT Office of Traffic Safety Manager, Mike Holowaty
Elizabeth G. Jones Assoc. Professor of Civil Engineering and
MBTA/MassDOT RAILROAD QUIET ZONES
Joint Police & Streets Committee
Grade Crossing Safety Jason l. sanchez manager public projects
Kansas City Southern Railroad Quiet Zone Plan
Construction Management & Inspection
RECORDS AND INFORMATION
City Council Meeting August 27, 2018
Joint Police-Streets Committee Meeting
Presentation to City of Palo Alto Rail Committee on Quiet Zones
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

RAILROAD CORRIDOR QUIET ZONES A Quality of Life Solution

AGENDA  What is a Quiet Zone?  What Improvements or Provisions Need to Be Made?  What Criteria Need to be Met?  What is the Process To Establish One?  How Does a Community Start?

INTRODUCTION  What is a Quiet Zone (QZ)? A segment of rail line where locomotive horns are not routinely sounded at one or several consecutive rail crossings. (at least ½ mi. in length)

Quiet Zone Establishment  Federal Railroad Administration Final Rule Effective June 24, 2005 Defines Criteria and Process  Local Authorities Implement Supplemental Safety MeasuresSupplemental Safety Measures Alternative Safety MeasuresAlternative Safety Measures  Establish Zone in Accordance with 49CFR222 Either Self-Certifying or with FRA Approval

EXAMPLE PROJECTS  Quiet Zones Under Development: Pomona – Improvements made in anticipation of future applicationPomona – Improvements made in anticipation of future application Placentia – “pre final rule” zone with improvements under construction; currently has night-time restrictionPlacentia – “pre final rule” zone with improvements under construction; currently has night-time restriction San Diego – In design phase with improvements at 13 CBD crossingsSan Diego – In design phase with improvements at 13 CBD crossings Palo Alto – feasibility study completed prior to final rulePalo Alto – feasibility study completed prior to final rule

PLACENTIA – QUIET ZONE  Intermediate Quiet Zone with Alternative Safety Measures: Three gates with raised mediansThree gates with raised medians CPUC and railroads required:CPUC and railroads required:  Video of crossings – continuous - 4 month period prior to installation of third gate -4 month period after Quiet Zone established  No photo enforcement  Placentia applied for approval by FRA  Placentia required to re-certify the Quiet zone at three year intervals

Placentia Typical Gate Installation

SUPPLEMENTAL SAFETY MEASURES (SSM’s) SUPPLEMENTAL SAFETY MEASURES (SSM’s)  Temporary or Full-Time Closure of Public Crossings  Automatic Gates with Median Islands or Channelization Devices  Four-Quadrant Gates  One Way Streets with Gates

FOUR QUADRANT GATES  Currently operating on Pasadena Gold Line Light Rail System

MEDIAN BARRIERS  Minimum Length 100’ or 60’ to Nearest Intersection  No Commercial Driveways within 60’ of Crossing Gates

ALTERNATIVE SAFETY MEASURES (ASM’s) ALTERNATIVE SAFETY MEASURES (ASM’s)  Modified SSM’s or Other Engineered Safety Improvements  Education  Enforcement

QZ OBJECTIVES  Optimize Safety at Rail Crossings  Optimize Quality of Life Through Noise Mitigation

OPTION 1  Install SSM’s at All Crossings  Local Authority Self-Certifies Quiet Zone

ENGINEERED ALTERNATIVE SAFETY MEASURES (ASM)  Typically a Modified SSM: Combinations of Medians and Gates (3- Quadrant Gates with Opposing Median)Combinations of Medians and Gates (3- Quadrant Gates with Opposing Median) Medians Not Fully Meeting SSM CriteriaMedians Not Fully Meeting SSM Criteria  Public Agency Must Develop Engineering Justification and Obtain FRA Approval of Effectiveness Ratings

NON-ENGINEERED ALTERNATIVE SAFETY MEASURES (ASM)  Enforcement (Police and Photo)  Public Education/Awareness  Requires Audit of Effectiveness Using Statistically Significant Methodology  Public Agency Must Apply to FRA for Approval of Quiet Zone  Follow-Up Monitoring May be Required

QUIET ZONE RISK INDEX (QZRI)  Average of the Risk Indexes of All Public Crossings in a Quiet Zone Corridor  Considers the Elimination of the Horn Sounding  Considers Any Safety Measures That May Be Installed  Considers the ADT and the Number of Trains

NATIONAL SIGNIFICANT RISK THRESHOLD (NSRT)  The Average of Risk Indexes Of All Crossings Nationwide Where Horn Is Sounded  Calculated by the FRA Annually

OPTION 2 Quiet Zone Risk Index (QZRI) Nationwide Significant Risk Threshold (NSRT) <  Provide Combination of Treatments Adequate to Reduce Risk:  FRA Approval Required to Establish Zone  Subject to On-Going Compliance Review

RISK INDEX WITH HORNS (RIWH)  “The Measure Of Risk To The Motoring Public When Locomotive Horns Are Routinely Sounded At Every Public Highway-rail Grade Crossing Within A Quiet Zone”

OPTION 3 Quiet Zone Risk Index (QZRI) Risk Index With Horns (RIWH) <  Provide Combination of Treatments Adequate to Reduce Risk:  FRA Approval Required to Establish Zone  NOT Subject to Future Compliance Reviews

WAYSIDE HORN  Considered to Be a One-to-One Substitute for Use of the Locomotive Horn

QZ PROCESS NOTICE OF INTENT DEVELOP EXISTING CROSSING INVENTORY Existing EquipmentExisting Equipment Accident Records at Each CrossingAccident Records at Each Crossing Average Daily TrafficAverage Daily Traffic Train CountsTrain Counts PUBLIC MEETINGS PUBLIC MEETINGS CONDUCT FIELD DIAGNOSTIC MEETINGS AT CROSSINGS ENTER FRA CALCULATOR FOR CROSSINGS IN CORRIDOR DESIGN/ CONSTRUCTION NOTICE OF ESTABLISHMENT

GETTING STARTED  Prepare Feasibility Study  Convene Group of Stakeholders Railroad OperatorsRailroad Operators Highway AuthorityHighway Authority California Public Utilities CommissionCalifornia Public Utilities Commission  Consider Use of SSM’s at all Corridor Crossings Allow public agency to self certify the Quiet Zone and re-certify every 4-5 yearsAllow public agency to self certify the Quiet Zone and re-certify every 4-5 years  Address Pedestrian Safety at Corridor Crossings

QUESTIONS AND ANSWERS A Quality of Life Solution

THANK YOU!

INTRODUCTION  OBJECTIVES Ensure a high level of public safetyEnsure a high level of public safety Respond to the many communities that have continued to press for relief from unwanted train horn noiseRespond to the many communities that have continued to press for relief from unwanted train horn noise

FIRST STEPS  Determine the Length of the Proposed Quiet Zone, Including All Crossings  Use the FRA’s Web-Based Application Tool “Quiet Zone Calculator” Review and update crossing dataReview and update crossing data Create scenarios using various safety measuresCreate scenarios using various safety measures Play with it until you meet one of the criteriaPlay with it until you meet one of the criteria  Apply On-Line, Once Improvements Are Made

EFFECTIVENESS RATING  A Number Between One and Zero It indicates the reduction in accident potential as a result of installing:It indicates the reduction in accident potential as a result of installing:  Supplemental safety measures  Alternative safety measures

WHO APPROVES A QUIET ZONE  “Public Authority” Responsible for Safety and Maintenance of the Roadway Crossing the Railroad

PERIODIC QZRI UPDATES REQUIRED  Public Authority Must Provide Updated Grade Crossing Inventory Form to FRA 4-5 years where SSMs are implemented at each crossing4-5 years where SSMs are implemented at each crossing 2-3 years where SSMs are not implemented at each crossing2-3 years where SSMs are not implemented at each crossing When ever asked by FRAWhen ever asked by FRA