2012 CSVA Conference VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Traffic Management Project Development Phase BC Road Builders and Heavy Construction Association Fall Business Conference.
October 28 th, Hwy 97 – Carson to Fox Mountain Road Four Lanning  Review Project Scope Problem Definition Objectives  Summary of Work Completed.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
Test Automation Success: Choosing the Right People & Process
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
CEM-512 Value Engineering Highway Project: South Interchange.
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Environmental Assessment Public Meeting
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Transportation Border Working Group Montreal October 22 and 23, 2013 CBSA Project Update.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
Enterprise Architecture
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Work Breakdown Structure (WBS) in Project Management.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Building Edmonton’s Next Century Investment Plan Opportunities Council Special Meeting February 16, 2005 Attachment 1.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Contractor Alternate Design Serving the Public’s Best Interest.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
AT FPS Bridge Planning Expectations 1 Bridge Planning Seminar 2008.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
1% Sales Tax Commission Board Meeting June 3, 2015.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Transportation Border Working Group - Vancouver October 21 and 22, 2014 CBSA Infrastructure Project Update.
Road Investment Decision Framework
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The I-465 West Leg Reconstruction Project
Downtown Valdosta Truck Traffic Mitigation Study
Value Engineering Study and Risk Assessment
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Issaquah-Fall City Road
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Presentation transcript:

2012 CSVA Conference VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Outline - Flexibility of VE for Decision Making Alternative Delivery P3 – SE Anthony Henday, Edmonton, PCL Peer Review – Highway 1 Lewvan Drive, Regina, SHI Cost Management – Johnson Street Bridge, Victoria BC Planning Process – Pasqua & 9 th Ave N/Ring Road, Regina Corridor Management – Highway 1 VA Study, Moose Jaw, SHI Project Validation – Highway 1 and 16 VE Study, MIT

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Alternative Delivery P3 SE Anthony Henday, Edmonton – PCL VE Undertaken During Pursuit – Materials supply and quality; – Structure span options and abutment configurations; – Retaining wall design, wick drain & maintenance considerations; – Interchange design departures from AT practises. Project delivery offered significant innovation thru VE – 91 street interchange layout; – High Level Structure; – High Skew Bridge; – Haunched Rail Structures; – Wetland Development.

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Alternative Delivery P3 SE Anthony Henday, Edmonton – PCL 91 Street Interchange Modification to interchange layout and avoidance of utilities

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Alternative Delivery P3 SE Anthony Henday, Edmonton – PCL High Level Structure Kinked steel girder bridge

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Alternative Delivery P3 SE Anthony Henday, Edmonton – P3 High Skew Bridge Traffic accommodation to accommodate cast in place construction Reduced foundation & materials in structure

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Alternative Delivery P3 SE Anthony Henday, Edmonton – P3 Haunched Rail Structures Haunched girders over railway for vertical clearance Reconsideration of mid span MSE wall

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Alternative Delivery P3 SE Anthony Henday, Edmonton – P3 Wetland Development Mill Creek relocation Naturalized wetland

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Peer Review Highway 1 Lewvan Drive, Regina, SHI

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 The previous planning process prompted a review due to the planning mandate of earlier work; SHI wanted an independent review of the previous study recommendations; The project had competing needs for access to Regina and to adjacent the Rural Municipality; MMM offered SHI a VE process in lieu of the Peer Review process Process also engaged the firm responsible for the planning to provide input at the Information Phase. Peer Review Highway 1 Lewvan Drive, Regina, SHI

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 The study resulted in confirmation of the basic Interchange Configuration – Provision for access to/from South – Validation of layout – Deferral of some work The VE found additional savings of $5.9M on $34.5M, a 17% savings Addressed planning and political concerns – Future access to/from south – Allowance for future inland Rail Port Peer Review Highway 1 Lewvan Drive, Regina, SHI

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Peer Review Highway 1 Lewvan Drive, Regina, SHI The resulting design served or made provision for all users, existing and future uses Existing infrastructure was salvaged to minimize cost Additional performance was provided at a lower cost

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Cost Management Johnson Street Bridge, Victoria, BC The Johnson Street bridge was assessed for consideration as a traditional and a P3 project Decision was made to proceed with traditional project delivery Project cost estimate identified as $78.9M

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Cost Management Johnson Street Bridge, Victoria, BC A VE study was undertaken to review project scope and to verify the cost VE process, from the Information through the Evaluation Phase, was conducted Architectural design constrained VE opportunities

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Cost Management Johnson Street Bridge, Victoria, BC 116 Ideas were generated of which 82 were carried forward for further consideration Implementation is the responsibility of the design team Project costs were validated and up to $5m in possible savings was identified (for a project contingency cushion) The VE challenged some of the project Design Criteria

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Planning Process Pasqua St & 9 th Ave N/Ring Road, Regina Pasqua Corridor Study Limits Pasqua Corridor Study Limits

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Planning Process Pasqua St & 9 th Ave N/Ring Road, Regina Evaluate Options for an interchange for improved Traffic Operations, Safety, Construction Phasing Base Case was the interchange design from the previous study Evaluated at-grade options for an improved intersection at Pasqua and Ring Road to defer the construction of the interchange. Study also addressed the traffic delays at the intersections in the Pasqua Corridor from Sherwood to Rochdale Review opportunities to improve the safety and traffic operations.

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Planning Process Pasqua St & 9 th Ave N/Ring Road, Regina 121 Ideas were generated with 31 Proposals – Diverging diamond interchange – XDL Intersection – Rotary interchange Addressed Value Target considerations – Corridor and cross section options – Interchange layouts versus intersections – Up to a $19.2M savings on $23.7M The preferred solution best accommodates the traffic flow patterns Regina is considering pursuit of first XDL intersection in Canada

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Planning Process Pasqua St & 9 th Ave N/Ring Road, Regina

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Corridor Management Highway 1 VA Study, Moose Jaw, SHI Highway 1 9 th Ave. NW Thatcher Dr. Main Street Previously Proposed Grade-Separation N N. Service Road Highway 2 16 th Ave. NW

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Corridor Management Highway 1 VA Study, Moose Jaw, SHI Primary goal: Develop an ultimate functional plan for the Hwy 1 corridor in the City of Moose Jaw, SK Objectives: Validate interchange locations and medium to long-term plans for the Hwy 1 corridor Review existing infrastructure and develop ultimate Hwy 1 corridor short and long-term solutions to meet safety and traffic operation requirements Determine value-base staged implementation of site-specific and corridor improvements

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Corridor Management Highway 1 VA Study, Moose Jaw, SHI 187 Ideas, 35 Proposals, 50 Design Suggestions Addressed two new interchanges – Simple cost effective IC access solutions provided – Significantly reduced cost of proposals Improvements to existing interchanges – Upgrade to main IC into Moose Jaw – Geometric improvements to Manitoba Ave IC 4 Scenarios developed Entire corridor improved and access managed for initial proposed cost of the two interchanges No savings but entire corridor addressed in terms of corridor management: 2 for 1 deal

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Project Validation Highway 1 and 16 VE Study, MIT

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Project Validation Highway 1 and 16 VE Study, MIT MIT did a year long preliminary design and cost review to reassess scope and manage cost The review cut project costs from $125M to $85.2M, which became the VE study Base Case The VE Study addressed the two interchanges 3 Scenarios were developed The VE session found $5.3M savings, a 6% savings, even after the scope management exercise The Province was impressed with process/results VE showed potential to replace the planning effort with a VE process to cut cost/save time in making a decision

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Summary VE is a flexible tool that serves many needs Effective in Alternative Delivery to deliver innovation Offers an alternative means of Peer Review Can provide a second review to assist with Cost Management Offers opportunity for creativity and idea generation in the Planning Process Serves a role to provide analysis and test options in corridor management studies Can validate project costs and serves to confirm cost savings VE/VA has a role in almost any project

VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making | October 2012 Thank you