TBG052510032618MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.

Slides:



Advertisements
Similar presentations
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Advertisements

CR 46A Realignment (Section 5)
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Public Open House February 6, Study Overview - Study Area South North.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Longmeadow Parkway Fox River Bridge Corridor
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Problem 1: Determination of Facility Types for Analysis.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
The I-465 West Leg Reconstruction Project
Downtown Valdosta Truck Traffic Mitigation Study
S.R. 30A / U.S. 98 / Panama City Beach Parkway
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011

Meeting Purpose Update advisory group on the current status of the project Review the alternatives under consideration and their impacts Obtain your input on the alternatives Discuss upcoming activities

Initial Alternatives

CSS Advisory Group Ratings Northern Alternatives SS1SS2SS3SS4TT1TT2TT3T Southern Alternatives Far West Long D-XShort D-X Golf Course West Golf Course East Pebble Creek T

Remaining Alternatives

-- North Section --No-Build Alternative --4-Lane Alternative

Remaining Alternatives -- Central Section -- No-Build Alternative --Three 2-Lane Alternatives -- One 4-Lane Alternative

2-Lane and 4-Lane Alternatives South of Summit Avenue the study team is evaluating 2-lane and 4- lane options; all would include an off-road bike path Three different two-lane alternatives under consideration  Incremental improvements (reconstruct the roadway, addressing existing problems except intersections; will incur right-of-way and relocation impacts)  Full reconstruction, on existing County TT alignment (completely reconstruct existing roadway including intersections; will incur right-of-way and relocation impacts)  Full reconstruction, off of existing County TT (follow mapped bypass route, reduces driveways that connect to County TT, reduces impacts to some residences; existing County TT would remain as a frontage road in spots) The key issue is whether an improved 2-lane roadway can adequately handle anticipated future traffic volumes (year 2035)

Remaining Alternatives -- South Section --No-Build Alternative -- Three 2-Lane Alternatives -- One 4-Lane Alternative

Features of Alternatives South of Sunset Drive Merrill Hills Road (Golf Course East Alternative)  Includes improvements to Hwy 59 between Merrill Hills Road and County X  Avoids environmental impacts in Pebble Creek corridor  Avoids Sunset /County X intersection; more direct route to Hwy 59 than Sunset-to-County X alternative  residential relocations; dramatic increase in traffic adjacent to remaining 15 +/- residences  Hills near Sunset Drive require large “cut” and bridge over Sunset Drive  Higher cost than Pebble Creek corridor alternative

Features of Alternatives South of Sunset Drive (cont.’d) Pebble Creek Corridor  This is the alignment included in city, county and regional plans since the 1970’s  Most direct route to Hwy 59  No crossing of Pebble Creek is required  Lower cost than Golf Course East, about the same as Sunset-to-X  Highest impact to primary environmental corridor  0 to 2 residential impacts  Close to some residences on Hawthorne Hollow Drive  Potential impacts to state threatened and endangered species (Butler’s garter snake, Blandings turtle, long-eared sunfish)  Wetland impacts vary from 3 to 15 acres of wetland

Features of Alternatives South of Sunset Drive (cont.’d) Sunset-to-County X Alternative  Follows existing county trunk highways  Takes advantage of recent widening of County X  Indirect connection to Hwy 59  5-8 residential relocations on Sunset Drive  Adds more traffic to Sunset Drive/County X intersection  About the same cost as Pebble Creek corridor alternative; lower cost than Golf Course East  Wetland impact 7 acres, and two bridges over Pebble Creek  Possible state threatened or endangered species impacts (Butler’s garter snake, Blandings turtle, long-eared sunfish)

Traffic Impacts New traffic info from SEWRPC  Study team asked SEWRPC to project future traffic volumes if 4 lanes from I- 94 to Summit Ave and 2 lanes from Summit to Hwy 59  Key finding is that 14,000 to 19,000 vehicles per day would use County TT south of Summit Avenue in year 2035; County and WisDOT use 15-17,000 vehicles per day as threshold for considering four lanes  Using SEWRPC projections, study team assessed how traffic would operate during peak hours on a two-lane roadway and a four-lane roadway Two-lane level of service “D” or “E”; four-lane level of service “B” and “C” At intersections: –signalized intersections at Madison and Sunset would operate OK with a 2-lane or 4-lane alternative –unsignalized intersections would “fail” on a 2-lane undivided alternative (unless a median is added at unsignalized intersection like Kame Terrace, MacArthur) –unsignalized intersections would operate better on a 4-lane alternative

Traffic Impacts

14,000 15,000 Golf Course East

Traffic Impacts 14,000 15,000 Golf Course East 14,000 16,000 Pebble Creek

Traffic Impacts 14,000 15,000 Golf Course East 14,000 19,000 Sunset-to-X 14,000 16,000 Pebble Creek

Intersection Level of Service Definition LOS A is the highest level of service that can be achieved. Intersection approaches are open, turns are easily made, and nearly all drivers find freedom of operation. Average delays are less than 10 seconds. LOS B represents stable operation. At signalized intersections average delays are 10 to 20 seconds. At unsignalized (stop signs) intersections, average delays are 10 to 15 seconds. LOS C still represents stable operation, but periodic backups of a few vehicles may develop. Most drivers begin to feel restricted. At signalized intersections, average delays are 20 to 35 seconds. At unsignalized intersections, average delays are 15 to 25 seconds. LOS D represents increasing traffic restrictions. Delays may be substantial during short peaks but no excessive backups. At signalized intersections, average delays are 35 to 55 seconds. At unsignalized intersections, average delays are 25 to 35 seconds. LOS E represents the highest operating capacity of the intersection. At signalized intersections, average delays are 55 to 80 seconds. At unsignalized intersections, average delays are 35 to 50 seconds. LOS F represents jammed conditions, the intersection is over capacity and safe gaps in the traffic flow are minimal. At signalized intersections, average delays exceed 80 seconds. At unsignalized intersections, average delays exceed 50 seconds.

Madison St. is currently unsignalized

Residential Relocations North of Summit Avenue: no relocations and minimal right-of-way acquisition Summit Avenue to Sunset Drive:  Off-alignment 2-lane/4-lane: 2 relocations  On-alignment 2-lane: 6-8 relocations no 4-lane on-alignment option South of Sunset Drive  Golf Course East 2-lane: 9 relocations 4-lane: relocations  Pebble Creek: 0-2 relocations; no difference between 2- and 4-lane  Sunset Drive 2-lane: 1-3 relocation 4-lane : 6-8 relocations

Cost Estimate 4-Lane on mapped bypass route  Golf Course East: $56 million  Pebble Creek: $48 million (pending soil borings)  Sunset-to-X: $46 million 2-Lane on mapped bypass route (4 lanes north of Summit Ave)  Golf Course East: $36 million  Pebble Creek: $32 million  Sunset-to-X: $29 million Improved 2-Lane on existing County TT (4 lanes north of Summit Ave)  $33-34 million

Environmental Impacts 4-Lane on Bypass Route (acres) North of Railroad Tracks Golf Course East Pebble Creek (mapped route) Pebble Creek (west) Pebble Creek (far west) Sunset-to-X Wetland4< Primary Env. Corridor Floodplain Right-of- Way

Environmental Impacts 2-Lane on Bypass Route (acres) North of Railroad Tracks Golf Course East Pebble Creek (mapped route) Pebble Creek (west) Pebble Creek (far west) Sunset-to-X Wetland3< Primary Env. Corridor Floodplain Right-of- Way

Environmental Impacts Improved 2-Lane on Existing TT (acres) Sunset-to-X Wetland5 (1+4) Primary Env. Corridor 11 (3+8) Floodplain6 (0+6) Right-of- Way 36 to 37

What’s Next Prepare draft Alternatives Section for public and government agency review (DNR, EPA, etc.) Begin preparing other sections of the Draft Environmental Impact Statement (EIS) Hold Public Informational Meeting #3 on February 10 th (Waukesha West cafeteria), 4-8pm Context Sensitive Solutions advisory group meeting #6 in spring Draft EIS approved in Spring or Summer 2011 Public Hearing shortly after Draft EIS approved Final EIS in Fall 2011 Complete study at end of 2011

TBG MKE Q&A