District Two May 9, 2013 District Two May 9, 2013 Strategic Intermodal System Funding Strategy.

Slides:



Advertisements
Similar presentations
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Advertisements

Great Western Corridor Feasibility Study
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Rusty Roberts, Vice President – Corporate Development Florida East Coast Industries AASHTO: Standing Committee on Rail Transportation General Session:
Ohio Department of Transportation Dispute Review Boards (DRB) Megan Blackford, P.E., Esq. Construction Claims Administrator.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
Transportation’s Relation to Growth Management `.
Access to Intermodal Supply Chain Networks
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
CALTRANS DISTRICT 7’S CAPITAL IMPROVEMENT PROGRAM Providing a safe, sustainable, integrated and efficient transportation system to enhance California’s.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Rusty Roberts, Vice President – Corporate Development Florida East Coast Industries Tampa Bay Regional Transportation Summit Thursday, October 10, 2013.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October.
Northeast Florida Regional Transportation Commission 1.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Lake Pickett South Transportation Term Sheet Orange County BCC September 15, 2015.
POS Regional Transportation Investments Viaduct/Seawall Discussion September 15, 2004.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Julie A. Gutierrez Assistant City Manager January 13, 2014 City Council Funding for Pasadena Participation in a Five City Alliance to Hire Technical Experts.
The National Strategy of Slovak Republic
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Coalfield Route - Double Stack Initiative I. Introduction Concept The Coalfield Route Double Stack initiative is designed to facilitate the transfer of.
STA US-30 Presentation for TRAC – October 13, 2015
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
Project Sponsor: Ohio Department of Transportation District 12.
U.S. Department of Transportation Federal Highway Administration Mary Peters Administrator Federal Highway Administration National Stone, Sand and Gravel.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
2040 LONG RANGE PLAN UPDATE Cost Feasible Plan Development April 27, 2016.
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
Interstate 15 North Phase 4
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Complete Streets: Making Connections
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
REGIONAL MODELS OF COOPERATION Between FDOT & Florida’s MPOs
Florida Department of Transportation
CR184 (Quintette Road) Bridge #480045
Metropolitan Planning Organization
FDOT Planning Update FRCA Partner Meeting
Florida’s New Hub for Transportation and Mobility Innovation
System Integration Plan
Update on Kings Highway Corridor
September 25, 2018 District 5 SUN Trail Update
Volusia TPO Board Meeting January 22, 2013
LRTP Modeling Status Update
LRTP Modeling Status Update
Coast to Coast Trail: FDOT District Seven Update
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

District Two May 9, 2013 District Two May 9, 2013 Strategic Intermodal System Funding Strategy

2 nd Five Long Range Cost Feasible Plan

A Partnership A Partnership

NFTPO No. 1 on SHS list. Locally Preferred Alternative shown

First Coast Outer Beltway $1,380,000

I-95 Corridor $79,258 $42,837

I-95 Corridor $15,200

I-95 Corridor $70,000 in 2 nd Five 10 95

I-95 Corridor $55,000 95

I-95 Corridor

WP Project No I-95/I-295 North Interchange FYPhase Amount 2015RW$ 7,000, CST $130,000,

I-95 Corridor $15,000

I-10 Corridor $41,058 $45,367 $ 5,068 $64,209 $79,258 $234,960

$58,503,000 in 2 nd Five Years

$70,392 $33,000 $168,279 $62,719 $16,148 $82,864

Add lanes and Reconstruct WP Project No I-295 (SR 9A) from I-95 to Dames Point Bridge FYPhaseAmount 2014ROW$ 4,013, ENV $ 3,225, CST $123,670, Add lanes and Reconstruct WP Project No I-295 (SR 9A) from SR 9B to JTB FYPhaseAmount 2015RRU$ 3,250, CST $29,366,000 WP Project No I-295 (SR 9A) Dames Point Bridge to SR 202 JTB FYPhaseAmount Design underway Add lanes and Reconstruct Construction now funded in CF $165,411

Strategic Intermodal System Funding Strategy $1,288,200,000$1,288,200,000 Long Range Cost Feasible Plan Transportation has a tremendous Economic impact

Florida Department of Transportation James G. Bennett, P.E. Urban Transportation Development Manager (904) THANK YOU!