1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,

Slides:



Advertisements
Similar presentations
The Green Arc Vision “Bringing the Big Outdoors closer to everyone – by creating, linking and managing extensive and valued landscapes for people and.
Advertisements

The Power Grid ELEC 403 The Citadel Mark McKinney.
2010 Draft Municipal Budget
What Is A “Marquee”?. Proposal for the Adaptive Reuse of a Landmark Building Township of Redford February 11, 2008.
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Draft Policy Overview Utilities & Renewable Energy Planning Study Presentation By: Tim Cane, The Jones Consulting Group Ltd. November 12, 2008 Township.
Retirement Villages : Best Practice Planning Friday 29 August 2008.
SPTC – JPA RAIL/TRAIL CORRIDOR Presented by John Segerdell, CEO Sacramento-Placerville Transportation Corridor Joint Powers Authority (SPTC-JPA)
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
(c) 2011 San Diego Gas & Electric Company. All copyright and trademark rights reserved.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
Proposed CBS Municipal Plan and Development Regulations Amendments for Backlot Development Municipal Plan Amendment No. 9, 2015 Development Regulations.
January 29, 2008 BCC Called Public Hearing on BZA # SE , 12/6/07 APPLICANT: Ganesh Bansrupan.
INTERNATIONAL RIGHT OF WAY ASSOCIATION | MARCH 20, 2015 STAKEHOLDER MANAGEMENT SOLUTIONS.
Public Information CentrePartners in Powerful Communities Welcome to our Public Information Centre.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
The Need for Electric Transmission Improvements in Dane County.
Tower Renewal. Toronto Towers Concrete slab, multi-residential apartment buildings Built between 1950’s and 1980’s 8 stories or more 2.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
GREENWAYS Connecting Communities November Greenways Plan 350 km planned Over 80 km built Construction of 4-5 km / year.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Development Services Department Project Management Section Auburn Drive Tentative Map Appeal of the Planning Commission’s Decision Project No
MAY 8, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPLICANT: CHANTEL PRESTON APPELLANT: SHAWN R.H. SMITH, Esq., (AGENT FOR CHANTEL PRESTON)
FREIGHTSUPPORTIVE LAND USE PLANNINGGUIDELINESFREIGHTSUPPORTIVE PLANNINGGUIDELINES FHWA Talking Freight Series May 18/05 Video Seminar on Context Sensitive.
St Andrews Heights Community Association President’s Report June – A Year of Challenges and Opportunities 1.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
NEWPORT POINTE COUNTY FILES: GP# , RZ# , SD# , AND DP# BOARD OF SUPERVISORS HEARING June 4, 2013.
JULY 16, 2013 BCC APPEAL HEARING ON BZA SE , JUNE 06, 2013 APPLICANT: KEVIN DONAGHY AGENT FOR CHANTEL PRESTON.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Guelph Soccer Centennial Community Athletics Centre Excitement is Building.
Board of County Commissioners PUBLIC HEARING September 22, 2009.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
Secondary Dwelling Units Orchard Park/Sherwood Forest Ratepayers Association Community Meeting January 29, 2014.
Official Plan Amendment – O’Brien & Giles – 2769 Lockhart Road Public Meeting Presentation – July 11, 2012 Note: This document is for presentation purposes.
Part of Lot 56, Concession 3 WGR, Plan RP17R2390 Part 1 (geographic Township of Bentinck), Municipality of West Grey.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
1 City of Portland City Council Public Hearing on an Appeal of the Land Use Hearings Officer’s Decision Presentation by BDS Staff: Mark Walhood, City Planner.
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Regulation of land use and building activities
Line Support Babaria Institute of Technology Prepared By Pritesh Wani
Concept Plan for Proposed Park Near Hopewell School
INDOOR BASEBALL / SOFTBALL FACILITY
Concerns Regarding the Windsor-Essex Hospitals Proposal
Guelph – Wellington – Waterloo Regional Road Network
Environmental Assessment PUC Application Process
NEWELL BROWN SUBDIVSION
What Is A “Marquee”?.
M-1.
AMBASSADOR WEST – CHANGES TO APPROVED PROJECT TO RESET ENTITLEMENT TIME LIMITS (City Ventures) City Council 3/28/11.
Planning Advisory Committee Orientation
Washoe County Board of Adjustment
Board of County Commissioners
Presentation transcript:

1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27, 2012

2 Location of existing facilities

3 Aerial view of corridor

Planning & approvals Class Environmental Assessment for Minor Transmission Facilities, approved under provincial Environmental Assessment Act Ontario Energy Board – “Leave to Construct” (Section 92) approval – Recovery of project costs through transmission rates Provincial Policy Statement, 2005 Design & construction according to industry standards and best practices Other municipal, provincial or conservation authority permits, as required

Existing transmission corridor 115 kilovolt (kV) transmission line built in the 1950s Easement rights, not ownership on this section of the right-of-way Right-of-way is 34 m (110’) wide along Deerpath Drive, with structures located 9 m (30’) east of centre Twin pole structures approx m (60’-80’) tall and spaced about 100 m (330’) apart Six twin pole structures between the railway and Hanlon Pkwy crossing; the latter is an angle structure View along Deerpath Drive

Proposed transmission corridor Upgrade transmission line to 230 kilovolt (kV) on existing corridor under existing easement Replace existing structures with steel poles, conventional or narrow base steel lattice towers, approx m (120’-130’) tall Spans between poles can be longer; e.g. three poles could replace five existing structures New structures adjacent to Deerpath Drive will be closer to the curb View of steel poles in residential neighbourhood in Woodstock

230 kV steel lattice tower types 7 Narrow based ( (shown west of Barrie) Conventional (shown in Essex County)

Woodstock transmission line upgrade 115 kV to 230 kV View from Augusta Place, Woodstock

Community issues and concerns Opportunity to provide input into the process Electric and magnetic fields Property values Tidiness of the vacant lot on Deerpath Drive Desire to bury the line underground Visual appearance of the new transmission line Desire to move the transmission line closer to Hanlon Pkwy

10 Questions and Discussion