Learning & teaching refurbishments 2012 October 2012.

Slides:



Advertisements
Similar presentations
Crescent Academy International
Advertisements

Key Features / Nice Things about house Central air conditioning / heat Very large bedrooms Private Parking lot plus extra lot for spill over 2 bathrooms.
Biol 351/52: -> Mehroke, Jarnail
Cathedral of the Immaculate Conception Project Information Session.
Building 1600 Business, Computer Application Systems Electronic Systems Technology, Entrepreneurship, Fire Technology, Machine Tool Technology.
TEACHING AND LEARNING REFURBISHMENTS SUMMER 2011 ROBINSON LIBRARY CLUSTER OLD LIBRARY BUILDING OULA CLUSTER BEDSON TEACHING CENTRE LT 1.46 KING GEORGE.
DOES WHERE YOU TEACH MATTER? Pam Woolner, Research Centre for Learning and Teaching.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Berwickshire High School Presentation compiled 15 th October 2009.
Learning & teaching refurbishments 2014 October 2014.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Oliver Tomlinson Assistant Subject Manager: Geographical, Earth & Environmental Sciences
Learning Space Development Toni Kelly; Associate Director Learning Environments 1.
For Students in their Food Services, Health Center, Co-curricular & Study Spaces 11/9/12.
Futureview Solar Solutions Elysburg, Pa. Call
Creation of large flat floor learning space Workshop 1. Bev Robinson ESS Pam Woolner ECLS Ulrike Thomas ECLS Georgina Robson ESS 13 th January 2014.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
Create a trifold Conduction Convection Radiation
To Date Some library staff have relocated to former CETAD building Contractor compound is located on Library Avenue Hoarding.
February 2008 PVC for Estates and Strategic Projects Executive briefing to Council.
Learning Commons HKUST Library.
Learning & Teaching Conference 2014 The Learning Process – how do we create the right environment? Bev Robinson Estate Support Service 18 June 2014.
Daily Goal: We will analyze materials to decide which will be the best conductor and which will be the best insulator. Homework: Science Fair Rough Layout,
The Oaks Public School Proposed Library refurbishment.
Max And Hieu’s House Design. Entry Hallway= 12mx1.25mx2.5m extra 60cmcm in width on right while passing coat hangers and shoe racks on first right which.
Computing Laboratory Building & Facilities Overview Role of Building & Facilities Manager Helping you Cleaning Reporting problems Interface with the Estates.
Director of Buildings' Office Slide no.1 January 2010 Trinity College Universal Design Issues Access 2010 Cobble Reduction Access to Historic (Protected)
+ Campus Computing Sites Public Labs Computing Clusters …. in a BYOD World CMU Duke Michigan Princeton.
The KUZZ Newsroom Remodel We began the project on January 6, 2008, dismantling the 20- year-old newsroom console desk and removing the aging, outdated.
ACU LIBRARY Click to view the slides ….. B Level – Ground floor Circulation Reference Information Commons Library Staff Toilets.
Building 100 Remodel - Feasibility Chabot College
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Wilston State School The New Library. Old library The old library has been reclaimed as an assembly and performance space.
DC Information Commons – Project Update to Library Staff Anne Fullerton Chair, DCIC Planning Team July 17, 2003.
How is school today? How could it be changing in the future? Will it be more stimulating, more technological and more open to the students’ needs? How.
BRVFD & RS Training Facility Proposal 05/07/2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Renovating Geoscience Labs for the Future “We want our students to learn skills they need in the workplace…not a museum.” Key Design Drivers Capacity—
Housing Service Review Plan for the coming period 24 November 2014.
“People feel better in Colt conditions” | feel better in Colt conditions” | Colt International Ltd Smoke control.
Focus Areas Safe and secure buildings and grounds Learning environments that meet the needs of today’s learners Preserve, maintain, and/or improve current.
CASE STUDY: CHAPMAN GRADUATE SCHOOL OF BUSINESS IND 5615 – Building Systems for Interior Designers ASSIGNMENT 4 - PART I & II SEPTEMBER 7, 2010 FRANCINE.
Toilet design Many different regulations 1. can you guess what might be regulated? building code? accessibility code? universal design?
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Edgehill.ac.uk/ls What are they telling us? Our starting point for meeting learner needs and expectations Lindsey Martin Assistant Head of Learning Services.
Volume Matter Density Texture Increase Decrease Remove heat Add Heat Alter.
Media Presentation Center
Describe how heat is transferred by conduction and convection.
Case Study: Collaborative Connected Workplace Environment- Cisco
Greenwich Academy Upper School
The Quality of Interior Design at PMU
Herschel Learning Lab Katie Wray Lecturer in Enterprise (SAgE Faculty)
Sam Farmer, Matthew Martin, Austen Sekerak and TJ Huster
Individual Room Design
3. Refurbishment - Project 1
Individual Room Design
Digital Commons Furniture Proposals for Single, Dual, Group, and Collaborative Arrangements in the ULM Library.
Administrative and security issues
the digital classroom PROJECT
the digital classroom PROJECT
Recent Bond Accomplishments
Heat Transfer Conduction, Convection and Radiation
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Building standards Mr. Da Silva.
NZEB Dwellings and Major Renovations
Presentation transcript:

Learning & teaching refurbishments 2012 October 2012

Medical School Pool cluster MG130 Before After

Medical School MG130 Pool Cluster The corridor was removed to create a larger room and increase the PC’s from 55 to 70. The teaching position was moved to the centre of the room with repeater screens along the wall.

Bedson Chart Cluster 3.30 Before After Increased from 35 to 42 PC stations The insulated ceiling improves the heating and lighting.

Bedson Chart Cluster 3.30 The focal teaching wall was moved to improve student sight lines.

Bedson 2.40 creation of new cluster Close to other teaching spaces in the Bedson enhancing this teaching hub

Bedson 2.40PC Capacity 40 The ‘daisy’ desks were used to ease movement around the room

Ridley 1 Nereid Cluster 4.72 Increased from 24 to 30 PC work stations. Posters to go up on the walls. Before After

Daysh 1.31 Brae Cluster A central teaching position was created and access around the room improved with alterations to the layout. Before After

Daysh 1.31 Brae Cluster New glazed entrance with quick access stations to provide additional space at class change over times

Agriculture building student social space ground floor Former SAgE faculty meeting room Student social space with 9 PC’s, collaborative working table and soft seating.

KGVI building student social space basement B56 & B57 Existing common room March 2012 Opened up with B57 to provide a larger space.

KGVI building student social space The additional space provides an area for students to eat and drink.

Ridley 1 ground floor student common room Students requested a number of minor improvements to the space which included a zip hot water boiler and sink …. …. and the furniture recycling mail base brought in coffee tables, alternative seating and a table football.

Bedson building porters lodge Student touch down space created with quick access stations and soft seating. Notice boards are being installed soon. Old porters lodge removed

CLT first floor corridor Before This project to improve the student corridor and access and egress to the lecture theatre and teaching rooms is still on going and will complete in November. A student touch down space will be created and notice boards will be added for student information. After

CLT first floor corridor This area of seminar rooms always looked abandoned, the refurbishment ties them in with the main corridor and ground floor refurbishment Before After

Ridley 1 MAST Project Lab 5.76 Before After An old research lab in the Ridley building has been refurbished to provide space for student projects.