SUDHENDU J. SINHA DIRECTOR PLANNING, RAILWAY BOARD Date :21.11.2013.

Slides:



Advertisements
Similar presentations
Planning and Development Committee West Corridor Update May 10, 2007.
Advertisements

IMPLEMENTATION OF THE STANDARD GAUGE IN THE MEDITERRANEAN CORRIDOR. Cartagena- French border.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Project Development at BKK Centre for Budapest Transport Gergely Horn Head of division BKK Centre for Budapest Transport
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
 A number of mega steel plants coming up in this region.  This New-Line-A Connector between coal fields in Talcher to Banspani-Sukinda line.  Coal.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Opportunities for Public-Private Partnerships in Railways 20 th May 2006.
IRCON INTERNATIONAL LIMITED
Indian Railways COAL INFRASTRUCTURE RINKESH ROY DIRECTOR TRAFFIC TRANSPORTATION Railway Board 22 nd June2012.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
1 Freight Operations Information System COM/CCM’s Conference
K-RIDE In September 2000, the Government of Karnataka (GoK) and Ministry of Railways (MoR) signed an MoU to set up a Joint Venture Company called “ Rail.
Anaheim Regional Transportation Intermodal Center Project Update.
IT Projects with CAO/FOIS
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
29 MARCH 2010 Captive Blocks : Major Bottlenecks – Land, Environment / Forest Clearances th Coal Summit 2012 BP Singh Director (Projects),
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
Nord Stream: a Major European Infrastructure Project – Status and the Way Forward > Henning Kothe, Project Director Nord Stream AG Moscow, 27 th of June.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Mysore City Corporation Mysore JnNURM. Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW 15 th January 2009 Projects State : Karnataka.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
19 November th Coal Summit November th Coal Summit COAL SECTOR MAJOR ISSUES  Domestic Coal shortage has emerged as the.
PWP / LAW Book Short Comings & System Improvement.
Beyond the Border Canada – United States Transportation Border Working Group Buffalo, New York April 8-9, 2014.
Change with a Purpose Kruger National Park Operations Division 21 st July 2006.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
HANCOCK PROSPECTING Hope Downs Iron Ore Project The Current Status 7 th Annual Global Iron Ore & Steel Forecast Conference Perth, 2004 Russell Tipper –
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
Change with a Purpose Human Resources Division 29 th June 2006.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting November 8, 2005?? Item No. xx Supp. Meeting Date:
Update on Chesapeake Bay Program Developments Briefing to the Water Resources Technical Committee October 9, 2009 (revised) Briefing to the Water Resources.
Coalfield Route - Double Stack Initiative I. Introduction Concept The Coalfield Route Double Stack initiative is designed to facilitate the transfer of.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
VFCFC – Nov 14, 2013 Board meeting. Agenda  2012 Annual Report: Planning/ Cutting Permit Development/Mtn Pine Beetle Strategy Harvesting Road building/Road.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Alternative Alignments Public Meeting
Implementation of Smart Cities mission DAVANAGERE SMART CITY LIMITED
Review of Implementation of Smart Cities Mission
Cambourne to Cambridge Better Bus Journeys
Presentation on Ken – Betwa Link Project-Phase-II
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
M&E Task Force Meeting
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
SgTPP Unit No.5 (1X660MW) & Mini Ash Pond BkTPP Unit No.6 (1X660MW)
City:- Corporation of City of Panaji
ScotRail Alliance Performance Improvement Alliance
Appendix C New Administration General Assembly Session
An Overview IR carries more than 23 million passengers per day (equivalent to population of Australia) Runs 22,300 trains per day (13,098 passenger
HOW WILL INDIAN RAILWAYS WIN BACK COAL FREIGHT FROM ROAD
Review of Implementation of Smart Cities Mission
Delivering East West Rail
VFCFC – Nov 14, 2013 Board meeting
COAL TRANSPORTATION AND LOGISTICS
METRO RAIL IN CHENNAI Prepared by S.PRABHAVARAJAN LECTURER.
Presentation transcript:

SUDHENDU J. SINHA DIRECTOR PLANNING, RAILWAY BOARD Date :

Importance  Critical for evacuation & transportation of 615 MT of Coal production target by  MCL - incremental production significant for AP, TN and Karnataka.  Ch projects important for Rajasthan, Maharashtra and Gujarat.

Imp … Substantially increase coal availability. Improve Power Scenario. Enhance Freight Rev. of Rlys. Enhance incremental rev. of Jharkhand.

COAL CONNECTS  No. Of Project : 31 [Jointly identified by Min. of Rly., Power & Coal] CRITICAL:5 MAJOR:9 MINOR:17

SWEEP RAILWAY WISE: SUBSIDIARY WISE: ECR- 18 CCL- 12 SECR- 06 NCL- 07 ECOR- 03 SECL- 05 ER- 01 MCL- 05 SER- 01 BCCL- 01 SER+ ECR- 01 SCCL - 01 SCR- 01

SNSN Name of ProjectCoal FieldCoal Subsi. Co. State 1Tori-Shivpur - Kathautia North Karanpura CCLJH. 2Shivpur -KathautiaNorth Karanpura CCLJH. 3Jharsuguda-SardegaIB ValleyMCLOdisha 4Bhupdeopur- Korichappar-Baroud Mand- Raigarh SECLCH. 5.Diversion of fire affected area. JHARIABCCLJh. WB CRITICAL COAL CONNECTS

TORI- SHIVPUR- KATHAUTIA

1. Tori-Shivpur New Line (CCL) Milestone : Stage I - Conditional clearance. [ / ] Stage II - Clearance on Work from Tori end. TDC: June [ CCI Target for Mar /2015] 43 Km Cr. 60MT out of total 140 MT. Deposit work of CCL CAO/CON/ECR

Assistance Required Complete possession of required 375 ha of land is made available by Jh by At present, 99 ha of Govt. and Raiyati (Pvt.) land are not available at 131 locations/stretches in the entire span of 44 km. Tree Felling and Clearance by Adequate security for men and machines deployed. Deputation of LA & Forest officials to resolve issues. Beef up Security at vulnerable loctions. Ensuring inter-district coord. (Chatra, Latehar, Hazaribagh)

2 Shivpur-Kathautia (Part of Tori-Kathautia Revised Alignment)  Milestone : Early identification of forest : to enable Rlys to file Stage-I. Land Acquisition. Handing Over Possession. Final Forestry Clearance. Shivpur-Hazaribag was not agreed by MoEF hence changed to Shivpur-Kathautia Km 1250 Cr. CCL CAO/CON/ECR.

3. Jharsuguda-Barpalli-Sardega Km. IB Valley O disha 555 Cr. MCL CAO/CON/SER. Takes off from Jharsuguda-FCI-Shunting neck & terminates at buffer end at Sardega. Includes Dhutra connection. Passes through Jharsuguda & Sundergarh districts, 24 vill., 2 Tehsils- Jharsuguda & Hemgir & 2 Forest Div. - Sambalpur & Sundergarh. To evacuate and transport 60 MT of coal from Gopalpur- Manoharpur Blocks in IB valley of MCL.

Jharsuguda-Barpalli-Sardega … Includes : Con. of Main Sdg. b/n FCI Shtg. Neck & Sardega. : Loading Bulb at Barpali. : Rail Flyover at Jharsuguda. Target : Dec.’ : After hectic persuasion by the Railways, Stage- I forest clearance has been forwarded by the State Govt. to MoEF and the clearance is likely to be obtained shortly.

: MOU with CH. 3 corridors : East. North. East-West Corridor. Bhupdeopur- Korichhapar/Baroud [Mand- Raigarh]- Part East Corridor. Execution : SPV route with CH. CIL. IRCON. Bhupdeopur- korichappar-Korba & Gevra road –Pendra road projects. NL b/n Bhupdeopur-Korichapar will be extended to Korba via Dharmjaigarh - 63 km project costing 344 Cr. Gevra Road to Pendra Road (East-West Corridor), 122 km.“In Principle” approval from Plg Comm. March 13: 2 JVs formed. Land acquisiton is in process. TDC : 2yrs for Ph I & 3 Yrs. For complete. 4. Bhupdeopur-Korichappar-Baroud

East

Diversion of Fire Affected Railway Lines in Jharia area of BCCL  133 Track km.  172 trains I/C 46 Pass.  DHN & ADRA

MAJOR COAL CONNECTIVITY PROJECTS

1. Piparwar Railway Siding [CCL] 30 Km Cr. CCL RITES 25 MT  Roadblocks : Severe Law & Order problem  TDC- Dec.’13 for Ph I & Jun’14 for Ph II

 Facts : 12.5 Km 129Cr CCL MT CAO/C/ECR. take off from 11 th km of Piparwar.  Milestone : Transferred to RVNL..  Target : June Ashoka Siding Project [CCL] Completion of balance work of Dhori siding of CCL

3. Shivpur-Chatti Bariatu & Hazaribagh-Banadag Sdgs.  Facts : Shivpur-Chatti Bariatu (14 km) & Hazaribagh- Banadag (9 km) ECR. NTPC CAO/CON/ECR Survey by RITES  Milestone :  Shivpur-Chatti-Bariatu : DPR submitted to NTPC.  Banadag project : Likely to be opened for Goods Traffic.

4. Koderma-Hazaribagh-Barkakhana-Ranchi -NL  Milestone : TDC for Koderma-Hazaribagh : Oct.’13 Hazaribagh-Barkakhana (57 km) : Sept.’14 Barkakhana-Ranchi (65 km): Dec.’15  Facts : 189 km Cr. JH share - 66% CAO/CON/ECR. Important for evacuation of coal from Hazaribagh-Banadag siding.

5. Koderma – Tilaiya New Line  Milestone : Stage-II forest clearance from BH –Pending. fly over at Manpur - To avoiding reversal. NTPC to give consent. Land acquisition Issues. 70% civil work in non forest area is complete. TDC : – Stage-I -non forest land (40km) : – Stage-II in forest land (25km)  Fact : 64 Km. Line [34 km under forest area of Bh & Jh] 418 Cr. CAO/CON/ECR Critical for : BARH Thermal Power Plant of NTPC [Operational -Feb’ 14]. Involves construction of 5 long tunnels 6 via ducts bridges.

6. Angul- Talcher Bulb Line Doubling of feeder lines Auto signalling

Rail Corridor connecting Angul-Talcher Line 7.  Facts : 85 Km Cr RITES Odisha (IDCO). Corridor involves laying of Railway lines & roads.  Milestone : Feasibility report submitted. State Govt. has requested to implement through PPP route. CMPDIL has suggested change in alignment that needs to be firmed up. PPP Policy in place.10/12/12. 5 Models: Non Govt Pvt. Line JV BOT Cap Augmentation : Fundng by customers : Annuity Alternative: Feeder route Doubling and auto Signalling.

8. Bhadrachalam-Sattupalli NL  Milestone : Rs.6 cr. provided by SCCL to SCR for conducting FLS etc. by SCCL. Sept Working Plan of Construction to be submitted. Nov 13. – Terminal Arrangement for Sattupalli to be finalised by SCCL.  Facts : Km Cr SCCL CAO/CON/SCR.

9. Vasundhara : Addl. Link Odisha Govt.+ MCL+ SECR+ Rampia Co. ‘Common Corridor Concept’

Balance Coal Connectivity Projects S.No.Name of Project Executing Agency Coal Subsi Projects Status 1. Renovation of Chainpur-SaruberaDHNCCLTDC Sept Completion of balance work of Dhori siding of CCL. ECRCCLWork completed 3 Improvement of Dudhi Chua siding. DHNNCLTDC July 2013 Raising of speed from SKTN to DCH 4 Modification of Dudhi Chua Yard for 2nd Silo DHNNCLTDC Sept addl. rakes 5 New Railway Siding for Block B project RITESNCLFeasibility report submitted by RITES to NCL. 6 Complete track renewal at Shaktinagar to Jayant Silo of NCL including improvement to Jayant and Spur siding RITESNCLEstimate submitted by RITES. 7 Balance work of KBJ railway line between Krishnashila and Shaktinagar Railway station RITESNCLNCL to submit full estimate value. 8 PRL system Amlohri and Nigahi RITESNCLDPR is under process by RITES

S.No.Name of ProjectExecuting Agency Coal Subsi Projects Status 9 Krishanshila Railway siding RITESNCL DPR is under process by RITES 10Railway Sdg at Lakhanpur Coalfields of Bishrampur Area RITES have done initial survey and feasibility study SECL SECL has to give the DPR for taking the project further 11New Rly Siding at Kusmunda areaSECRSECLNov’ 13 TDC DPR 12Construction of New sdg. parallel to old sdg. at Bhatgaon area SECRSECLDPR under approval 13 Magadh and Amarpalli Rly. Siding CCL March Feasibility report of Amarpalli submitted April 2013 – Feasibility report of Magadh submitted. 14 Renovation of CP siding of Giridih of MNK area ASNCCLTDC Dec Renovation of Swang & Jarandih siding DHNCCLEstimate under preparation. 16 Temporary connect of Lingraj siding with Talcher main line. RITESMCL DPR under preparation. Feasibility report in advanced stage nd siding at Himgir station, Kanika RITESMCL DPR approved by SECR. Land issue to be sorted by MCL. Balance Coal Connectivity Projects

ISSUES:AREAS OF CONCERN Environmental clearances. Land acquisition and possession. Law & order.