Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Great Western Corridor Feasibility Study
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
U.S. 33 Northern Connector Alternative
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
ALDOT HSIP FUNDING OPPORTUNTIES ALABAMA DEPARTMENT OF TRANSPORTATION OFFICE OF SAFETY OPERATIONS SONYA BAKER TIMOTHY BARNETT MAY 13, 2015.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
September 24,  Preliminary Development Plan  Location: North side of NW 39 th Avenue in the 8300 to 9099 block  Zoning Districts: R1-B, HM, PD,
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Community Development Department PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Community Development Department Construction Phase.
Phase 2: 30% Design Plans September 4 th, 2012.
Community Development Department Construction Phase BULLDOG DRIVE.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Orange County Public Works Board of County Commissioners Presentation June 16, 2015 Board of County Commissioners Presentation June 16, 2015 Roadway Median.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Pioneer Road Relocation and Reconstruction Project
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Management Team Meeting #3
DICKINSON AVENUE RECONSTRUCTION
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
HSM Applications to Multilane Urban Suburban Multilane Intersections
Geometric Design: General Concept CE331 Transportation Engineering.
Roadway Cross Section Design Flexibility
Parks Highway Reconstruction: Lucas Road to Big Lake Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4,

Location

Narcoossee Road Corridor Study from US- 192 to Orange County line (~7.4 miles) Primary north-south arterial road in Northeast County

Existing Conditions 2 lane rural arterial road 12 – foot travel lanes 4 – foot shoulders Open drainage system 55 MPH speed limit

Need for Improvement Current Average Annual Daily Trips (AADT) = 15,002 – 16,247 Projected to fail adopted Level of Service (LOS) ‘D’ in 2010 By 2030, projected 44,000 – 47,500 AADT

Need for Improvement Safety –2005: 21 accidents (7 injuries) –January 2006 – March 2006: 9 accidents (10 injuries)

Typical Sections Urban section Closed drainage Design for 6-lane Construct 4-lane 45 MPH design speed

Typical Section - IA

Typical Section - IB

Typical Section - IC

Typical Section II

Methodology - Roadway Typical section requires 130’ of R/W Minimize R/W takes –Existing R/W Typically 100’ –Many segments of 130’ R/W Minimize impacts to existing buildings Minimize environmental impacts

Cyril’s Dr. to Orange County Line Existing Conditions: Single family residential on both sides Houses on left are closer to road Reduced typical section Preliminary Recommendation: Right widening 15’ additional R/W required

Orange County Line to Boggy Creek Rd. Inter-local agreement Maintain reduced typical section Orange County is constructing 6-lanes Possibly re-align Boggy Creek Rd. intersection

Schedule Phase I - US 192 to Rummel Road Design1/07To12/07 R/W4/07To5/08 Construction7/08To1/10 Phase II - Rummel Road to Jack Brack Road Design10/07To10/08 R/W4/08To5/09 Construction7/09To7/11 Phase III – Jack Brack Road to Boggy Creek Road Design8/08To8/09 R/W2/09To3/10 Construction5/10To5/12

Cost Right-of-way$12,600,000 Engineering$6,102,000 Construction$61,024,000 CEI$6,102,000 Program Mgmt.$6,102,000 Total$91,930,000

Recommendations Continue public involvement Reduce speed limit Closed drainage system Investigate landscape options Investigate noise abatement options On street bicycle lanes and/or multi-use paths Reduced typical section at north end to minimize impacts

Proposed Alignment