Implementing a Model Based Approach to Design and Construction at Wisconsin DOT Eric Arneson, P.E Methods Development, WisDOT

Slides:



Advertisements
Similar presentations
Advanced Database Projects In Access © Hodder Education 2008 Access Projects – Problem Specification.
Advertisements

March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development ACEC/WisDOT Transportation Improvement Conference.
Lecture # 2 : Process Models
A Workbook to Accompany Getting Digital Marketing Right A Simplified Process For Business Growth, Goal Attainment, and Powerful Marketing Primal Digital.
Importing Transfer Equivalencies: How to Maximize Efficiency How Columbia College Office of Registrar improved productivity through third party solutions.
ITEC 370 Lecture 25 Lifecycles. Review Questions? F give prototype demonstration –Testing plan for your software Life cycles –Scrum (Roles, Meetings,
Creating a Program In today’s lesson we will look at: what programming is different types of programs how we create a program installing an IDE to get.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Presented By: Chuck Lawson, PE Paving the Way for Roadway Designer in GEOPAK V8 i (SELECTseries 1)
© 2011 Autodesk CI4073: Wholly Sheets Batman! Plotting in AutoCAD® Civil 3D Seth Cohen CAD Management Resources Inc. CAD Applications Specialist Autodesk.
Software Engineering. How many lines of code? Average CS1004 assignment: 200 lines Average CS4115 project: 5000 lines Corporate e-commerce project: 80,000.
Software Engineering.
Working with 3D Models in Design & Construction Panel Discussion 1.
Xtreme Programming. Software Life Cycle The activities that take place between the time software program is first conceived and the time it is finally.
Process, Communication, and Certification Padma Venkata
Introduction to Systems Analysis and Design
XP New Perspectives on Microsoft Access 2002 Tutorial 71 Microsoft Access 2002 Tutorial 7 – Integrating Access With the Web and With Other Programs.
Release & Deployment ITIL Version 3
Welcome!. Technical Writing - An Emerging Career! Presented by:
Introduction to BIM BIM Curriculum 01.
By: Muhammad Raza Ali Khan
Business Processes and Workflow How to go from idea to implementation
ODRC Mainframe Systems Migration Project
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Unitedstreaming New Features New and easy interface Professional Development Animations and audio files Daily video content New and enhanced tools Customized.
1 REQUIREMENT ENGINEERING Chapter 7. 2 REQUIREMENT ENGINEERING Definition Establishing what the customer requires from a software system. OR It helps.
K-12 Web Content Development Process
2007 Microsoft Office System Overview 2007 Microsoft Office System Overview Elizabeth Caley Senior Product Manager Microsoft Canada.
Communications support for the Vodafone EMF community Pre-read for EMF Leader Workshop, 8 April 2008 Dianne Sullivan & Ros Young.
Software Engineering Management Lecture 1 The Software Process.
1 The Software Development Process  Systems analysis  Systems design  Implementation  Testing  Documentation  Evaluation  Maintenance.
A Web Based Workorder Management System for California Schools.
Moving into Implementation SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED.Roberta M. Roth.
Education, Communication, Video and Training Overview Year in Review.
To panel list main. How complicated is the topic or activity? Will lecture be part of the delivery? Will class discussion be part of the session?
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
CMSC 345 Fall 2000 Software Design and Development.
Lecture 4 – XP and Agile 17/9/15. Plan-driven and agile development Plan-driven development A plan-driven approach to software engineering is based around.
Reading Flash. Training target: Read the following reading materials and use the reading skills mentioned in the passages above. You may also choose some.
WATERFALL DEVELOPMENT MODEL. Waterfall model is LINEAR development lifecycle. This means each phase must be completed before moving onto the next!!! WHAT.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
Operational and Postimplementation
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
Welcome. Welcome to this TechNet Event URL for on-line feedback is in your reminder No Planned Fire Drills Please turn your Mobile Phones off To.
Defining the Functional Needs of Our College. Strategic Technology Plan Project Roadmap Project Principles Developed Readiness Assessment.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
1 The Software Development Process ► Systems analysis ► Systems design ► Implementation ► Testing ► Documentation ► Evaluation ► Maintenance.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
CERN IT Department CH-1211 Genève 23 Switzerland t Migration from ELFMs to Agile Infrastructure CERN, IT Department.
INTRODUCTION TO E-LEARNING. Objectives This chapter contains information on understanding the fundamental concepts of e-learning. In this chapter, e-learning.
TOP 5 BEST PRACTICES ON USER HIERARCHY AND WHAT TO AVOID Value, Delivered!
How are Highway Designs Actually Represented in Surface Models for Automated Machine Guidance and How Should We Control Them? Alan Vonderohe Construction.
Introduction to AutoCAD and Civil 3D Justin Bonnema, PE USDA-NRCS ANMT Brookings, SD.
Helping Hands in an International Workforce – Maximizing Client Benefits through use of Global Teams Cathy Michalsky and Manori Turmel.
User Adoption CRMUG Dallas Chapter Meeting 5/14/2014.
Software Development. The Software Life Cycle Encompasses all activities from initial analysis until obsolescence Analysis of problem or request Analysis.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Should employability be compulsory? Chris Wilkinson Careers Adviser “I always thought of employability as selling yourself for a.
Walk-in Slide: AU 2014 Social Media Feed
Introducing ONYX Professional Services
How IoT Initiatives are Changing Product Development.
Software Engineering Management
Managing the Project Lifecycle
Use Cases Discuss the what and how of use cases: Basics Benefits
Systems Analysis and Design
Module 6: Preparing for RDA ...
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
System Review – The Forgotten Implementation Step
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Street Manager Training approach
Presentation transcript:

Implementing a Model Based Approach to Design and Construction at Wisconsin DOT Eric Arneson, P.E Methods Development, WisDOT

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Topics WisDOT current AMG and model practices Changes to design to deliver 3D models WisDOT’s model-centric approach to design Implementation status (lessons learned)

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Model-Based Design Part of WisDOT Implementation of 3D Technologies Plan with Five Active Initiatives: –Statewide Real-Time Kinematic GPS Network –DTM Data Collection –3D Design –Automated Machine Guidance –Field Technology and Inspection

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT Model Concept Definitions 3D Surface Model –Produced for projects with Grading work –Includes surfaces for AMG operations of Grading, Base Course, and Paving –Initial model deliverable requirement will be 3D Surface Models Roadway Model –Evolution of model concept to include information for increased utility in design and construction processes, and ultimately expanded to downstream roadway lifecycle processes

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, D Surface Model Content Concepts

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, D Surface Model Content Concepts Surfaces Exist Top Base Course Subbases Datum Pavement Surface model data density will be design speed dependent Surface models must be synchronized with plan sheets Additional content –Longitudinal breaklines –Horizontal alignments –Vertical profiles –Superelevation transition information Fully staged model requirement will be decided on project- by-project basis

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, D Surface Model Requirement WisDOT will implement a 3D surface model delivery requirement on projects starting after July Model content requirements and other details will be released later this year.

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Design requirements based on construction needs Design workflow goal to develop construction ready surface models during the design process Must produce surface models with sufficient detail to support AMG operations 3D surface model output must be synchronized with plan sheets

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 What design requirements really mean 3D models need to be created in a 3D environment, not reverse-engineered from 2D 3D model will have much more detail than plan sheets Models will be data source for plan sheets Plan sheets need to have live connection to models –Reduce errors, maximize efficiencies, plan document is contractual

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT’s approach to model-centric design (short version) The standard method of designing highway projects with elevation data will be to develop 3D models.

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT’s approach to model-centric design (long version) Transition from CAiCE and 2D workflows to AutoCAD Civil 3D and 3D model workflows Begin with 3D surface models for grading and base course as foundation Work towards expanding 3D surface models to paving, expanding roadway models, and advanced uses of models 3D surface and roadway models will be required design deliverable beginning 2014

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT roadway design workflow The foundation of the roadway design workflow is corridor design 3D based tools are used to further define surfaces (gradings, feature lines, etc)

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT roadway design workflow u The roadway design workflow stresses 3D surface model development from the beginning, minimizing work needed to add required detail into design output.

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT roadway design workflow Contains quality control mechanisms to help ensure 3D surface models match plan sheets –Corridor surface - paste into refinement surface –Add 3D definition to refinement surface the corridor doesn’t model well –Refinement surfaces used for: AMG surfaces cross sections sheet data

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 How WisDOT is transitioning to models Provide transition timeframe (2 years) Provide training –Online, video-based training ( hours for design) –Supplement with support and in-person sessions Workflow lifecycle –Get tools and training out to users, listen to feedback, roll improvements back into files and training, repeat

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Communication with consultants Provide same transition timeframe (2 years) Provide same access to training Initial meetings last year with webmeeting updates Requirements for solicitations beginning mid –Project delivery –3D roadway models Draft delivery requirement language Feb 2014

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT Civil 3D training system Pdfs of written documentation organized by subject matter Contains both basic Civil 3D material and WisDOT workflows Training track PDFs organize material into job duties Most subjects have video material and exercise files Free and publicly open

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 WisDOT Civil 3D training system Face-to-face time –In-house staff – monthly office visits –Consultants – WisDOT-approved trainers End-user support – , phone, remote sessions

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Implementation scope 300 in-house staff, approximately 800 consultants Windows XP to Windows 7 64-bit CAiCE/MicroStation to AutoCAD Civil 3D –Install customizations –Custom code (macros, subassemblies) 2D workflows to 3D workflows –Mostly impacts design with ramifications on plan production

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Implementation approach Put together best practices internal to Methods Development with expert review Release standards and workflows statewide to early adopters Rely on early adopters for feedback Roll improvements to standards, workflows, and training back into the system Build up local expert base So how’s that going for ya?

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Software conversion issues Lots of MicroStation experience going to AutoCAD Understanding AutoCAD/Map/Civil differences Moving from simple graphic elements to intelligent objects Learning all the possible live connections, what breaks them, refresh scenarios

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, D to 3D issues Can be very difficult for staff that have lots of experience working in 2D 3D workflows have far more options, tools, and commands to learn 3D workflows work best when more detail is put in the process earlier than 2D workflows 3D surfaces aren’t just for AMG, they drive plan sheets The “Aha! moment” –Once I figure this out, it will make my job easier and my product better.

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 General observations Staff that don’t have lots of experience with a different system have an easier time learning. Transitions work best when staff: –Go immediately from training to production –Be just in one system –Have time and support to learn at their own pace Building up local expert base has been a challenge

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Top lessons learned If you have elevation data, you’re designing a 3D product whether you can see it or not. The corridor model is not the output. Surfaces are. Since surfaces are the output, build them early and make sure they’re good. If you don’t have enough time to build fully-detailed models all at once, build good detail from inside to out.

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Top lessons learned 3D models in design will impact design as much or more than construction. –3D design review –Further model development (structures, lights, sign bridges, plantings, you name it) –Sharing models with others

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Top lessons learned Designing in Civil 3D and producing sheets in MicroStation is not an optimal workflow. Most people aren’t excited about changes to their tools and work. If you’re going in the right direction and communicate to people, they’ll accept a lot of change in a little time. And the one thing that is true that people don’t believe:

Methods Development – Support, Develop, InnovateWisDOT-Autodesk Webcast July 11, 2013 Shocking, but true When workflows are focused on building 3D deliverables, adding them to existing deliverables does not noticeably increase total workload.