PRESENTATION SUMMARY Introduction Introduction – Overview (M. Ryan) Geography Geography – Living with the Red (M. Clamen) Conclusions and Recommendations.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
PRESENTATION SUMMARY Introduction Introduction – Overview (M. Ryan) Geography Geography – Living with the Red (M. Clamen) Conclusions and Recommendations.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
PRESENTATION SUMMARY Introduction Introduction – Overview (M. Ryan) Geography Geography – Living with the Red (M. Clamen) Conclusions and Recommendations.
OFFICE OF PROGRAM POLICY ANALYSIS & GOVERNMENT ACCOUNTABILITY The Legislative Sunset Review Process Darwin Gamble, Senior Legislative Analyst OPPAGA February.
PRESENTATION SUMMARY Introduction – Living with the Red Introduction Introduction – Overview (Mike Ryan) Geography Geography – Living with the Red (M.
PRESENTATION SUMMARY Introduction Introduction – Overview (M. Ryan) Geography Geography – Living with the Red (M. Clamen) Conclusions and Recommendations.
Transportation Border Working Group Montreal October 22 and 23, 2013 CBSA Project Update.
> > > > Association of State Floodplain Managers.
Update Training Meeting
Welcome Rob Rash CEO/Chief Engineer St
4th International Symposium on Flood Defence Toronto, Canada May 6, Red River of the North Flood 10 Years Later.
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
1 Rebuilding the System Reducing the Risk California Water Plan – Advisory Committee August 16, 2007.
Alachua County Post-Disaster Redevelopment Plan Alachua County Board of County Commissioners Meeting April 27, 2010.
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
Public Health and Healthcare in Ontario A Made in Ontario Solution for Public Health and Healthcare Andrew Papadopoulos Director, School of Occupational.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Global Dimension & Climate Change
District Planning Council Program Overview. District Planning Concept Local Elected Officials Emergency Managers Emergency Responders Local Business Community.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Manitoba Floodway Authority Manitoba Floodway Authority FLOODWAY EXPANSION GROUNDWATER ACTION RESPONSE PLAN 1. OVERVIEW GROUNDWATER IS A TOP PRIORITYGROUNDWATER.
Integration with Local Response During Disasters Mary Mahoney RN MSN CEN Bioterrorism Coordinator Nassau County Regional Resource Center North Shore-LIJ.
Southside Flood Protection
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Consultation - Collaboration - Cooperation Who We Are and What We Do A Collaborative Approach to Healthcare and Public Health in the Pacific North West.
STRENGTHENING COMMUNITIES CONFERENCE LANDS ADMINISTRATION APRIL 12 th and 13 th YELLOWKNIFE.
BRIEFING ON DISASTER MANAGEMENT BILL LOUIS BUYS CHIEF DIRECTOR: DISASTER MANAGEMENT.
What’s in it for ME? Municipal Issues Panel Role of Local Governments in Effective Land Management.
1 Recent Accomplishments and Opportunities for 2007 ~WEROC~ Kelly Hubbard WEROC Emergency Manager Municipal Water District of Orange County WACO, January.
Planning for Resiliency. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and.
1 Disaster Behavioral Health Advisory Committee DBHAC Began is 2006 as Terrorisms and Disaster Behavioral Health Advisory Committee (TADBHAC) Revitalized.
Manitoba’s 2011 Flood Mark Lee, M.Sc., P.Eng. Manager, Surface Water Management Manitoba Conservation and Water Stewardship January 29 th, 2013.
EFFECTIVE, EFFICIENT, SUSTAINABLE SOLUTIONS TO COMMUNITY PROBLEMS THROUGH THE COLLABORATIVE EFFORTS AND RESOURCES OF CITIZENS, BUSINESS, GOVERNMENT, AND.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Legislative Efforts Aimed at Reducing Waste Tires Piles Along the U.S. – Mexico Border Region.
January 29, 2013 Lake Diefenbaker Reservoir Operation Proposed Operating Manual Development.
1 Income Testing Session 2 Presented to Niagara Child Care Sector September 19, 2007.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
Community Resilience Planning in Coastal North Carolina Sixth Annual Unifour Air Quality Conference June 15, 2012 Linda B. Rimer Ph.D. 10/20/20151 U.S.
PINAL COUNTY TOWN HALL Tabletop Exercise - Panel Discussion on a Local Emergency.
1 RAPID RESPONSE NETWORKS Working with external agencies to protect heritage collections Colin Atkinson Flood Incident Management Team Leader.
FLOOD MANAGEMENT By: Joyce Mathole Directorate: Hydrological Service Department of Water Affairs and Forestry.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
BIOTERRORISM AND LEGAL ISSUES: THE TEXAS EXPERIENCE NGA REGIONAL BIOTERRORISM WORKSHOP March 15, 2004 Susan K. Steeg General Counsel Texas Department of.
FLOODPLAIN MANAGEMENT AND THE U.S. ARMY CORPS OF ENGINEERS Paul Bourget Directorate of Research and Development Headquarters, U.S. Army Corps of Engineers.
Issues surrounding the Red River Flood of Outline Introduction Impacts of the flood Flood protection works Manitoba Water Commission (MWC) Current.
1 DHS Emergency Management Presenter: Frank Billard Director, Office of Facilities & Support Services Date: October 21, 2015 Georgia Department of Human.
NESC – RCAP Smart Water Program August 4, 2008 Review of West Virginia’s Source Water Assessment and Protection Program A State Perspective A State Perspective.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
Metro Boston South/West Regional Multi-Hazard Mitigation Plan Medfield Annex Board of Selectmen Public Meeting April 7, 2008 Joseph Domelowicz Jr. Martin.
Assign Priority Calendar Category Community Projects Staff Projects Update/Establishes Polices/Ordinances Strategic Plan Goal? Yes – Assign Goal No – Not.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Dig Once (with Many Partners) The Dakota County Broadband Network State Broadband Task Force June 15, 2016.
1 Disaster Behavioral Health Advisory Committee DBHAC Began is 2006 as Terrorisms and Disaster Behavioral Health Advisory Committee (TADBHAC) Revitalized.
Evacuation Procedures City Council October 20, 2015.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Strategic Planning Update
Flood Forecasting and Warning Vienna Flood Model
Integrated Bilateral Agreement (IBA) 2018 to 2028
Presentation transcript:

PRESENTATION SUMMARY Introduction Introduction – Overview (M. Ryan) Geography Geography – Living with the Red (M. Clamen) Conclusions and Recommendations Conclusions and Recommendations Accomplishment's Accomplishment's – Improvements in Flood Forecasting (D. Luna) Mitigation (Structural/non-structural/Policy/Legislation changes) Mitigation (Structural/non-structural/Policy/Legislation changes) – North of the Border Manitoba (Doug McNeil)Manitoba (Doug McNeil) – South of the Border US Federal (J. DeHarnais)US Federal (J. DeHarnais) US State (D. Frink)US State (D. Frink) Summary Summary – What’s next? (M. Ryan) Questions Questions Mitigation – Manitoba

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba RED RIVER FLOOD OF THE CENTURY – 10 YEARS LATER Mitigation North of the Canada-US border in Manitoba Doug McNeil, P.Eng., Manitoba Floodway Authority

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Structural and Non-structural Mitigation Canada/Manitoba Flood Protection Program Canada/Manitoba Flood Protection Program Red River Floodway Expansion Red River Floodway Expansion City of Winnipeg City of Winnipeg Manitoba Initiatives Manitoba Initiatives

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Flood Protection Program Canada and Manitoba provided $130 million to mitigate against future floods in the Red River Valley Canada and Manitoba provided $130 million to mitigate against future floods in the Red River Valley –Individual Homes and Businesses –Community Ring Dykes –City of Winnipeg –Environmental Mitigation and Scientific Data –Provincial Infrastructure Works

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Flood Protection Program Raising Diking Structural DikeRetaining Wall Over 1700 individual homes and businesses

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Rosenort Emerson St. Pierre-Jolys Aubigny Dominion City Ste. Agathe Niverville Gretna Lowe Farm Rosenfeld Riverside Grande Point South of Floodway Flood Protection Program - Community Ring Dikes

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Program Element 2: Communities 18 community ring dike projects constructed 18 community ring dike projects constructed 8 existing ring dikes also upgraded 8 existing ring dikes also upgraded Flood Protection Program

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Flood Protection Program Permanent dike construction at river properties (170 homes and 8 condos) in WinnipegPermanent dike construction at river properties (170 homes and 8 condos) in Winnipeg

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Flood Protection Program Environmental Protection and Scientific DataEnvironmental Protection and Scientific Data Inventory and seal abandoned wellsInventory and seal abandoned wells Collect GIS and Topographic DataCollect GIS and Topographic Data Enhance hydrometric station networkEnhance hydrometric station network Mike 11 hydraulic model for Red River valleyMike 11 hydraulic model for Red River valley

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Flood Protection Program Provincial Infrastructure WorksProvincial Infrastructure Works West Dike ExtensionWest Dike Extension Floodway RiprapFloodway Riprap Floodway gate repairsFloodway gate repairs Portage Diversion and Shellmouth DamPortage Diversion and Shellmouth Dam Assiniboine River DikesAssiniboine River Dikes

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Red River Floodway Expansion Expand Red River Floodway channel to increase flow capacity from 1,700 to 4,000 cmsExpand Red River Floodway channel to increase flow capacity from 1,700 to 4,000 cms Protects Winnipeg, East St. Paul and West St. PaulProtects Winnipeg, East St. Paul and West St. Paul $665 Million 50/50 Canada/Manitoba$665 Million 50/50 Canada/Manitoba

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Widening – No deepeningWidening – No deepening Excavate 21,000,000 m3Excavate 21,000,000 m3 Red River Floodway Expansion

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Red River Floodway Expansion Raise West Dyke 2 metres and extend 10 kmRaise West Dyke 2 metres and extend 10 km

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba City of Winnipeg Sewer and flood protection infrastructure improvementsSewer and flood protection infrastructure improvements New or Upgraded gates on sewersNew or Upgraded gates on sewers Upgraded pumping stationsUpgraded pumping stations $25 million to date$25 million to date $20 million over next 6 years$20 million over next 6 years

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba City of Winnipeg Updated emergency plan including updated evacuation plansUpdated emergency plan including updated evacuation plans New electronic flood manual - $2.4 millionNew electronic flood manual - $2.4 million

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – North of Winnipeg Purchase of Amphibex ice breaking machinePurchase of Amphibex ice breaking machine Breaks up ice in anticipation of potential ice jams in the lower reaches of the Red RiverBreaks up ice in anticipation of potential ice jams in the lower reaches of the Red River

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Legislation Red River Floodway ActRed River Floodway Act Full compensation for artificial floodingFull compensation for artificial flooding Over and above Federal disaster assistanceOver and above Federal disaster assistance Water Resources Administration ActWater Resources Administration Act Revised designated flood area regulationRevised designated flood area regulation All new properties must be protected to 1997 flood (100 year) plus 0.6 m freeboardAll new properties must be protected to 1997 flood (100 year) plus 0.6 m freeboard

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Legislation Emergency Measures Act AmendmentsEmergency Measures Act Amendments Creation of Orders for evacuation, accessing private property in pre-disaster periodCreation of Orders for evacuation, accessing private property in pre-disaster period Stiffer penalties for refusing to evacuateStiffer penalties for refusing to evacuate

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Legislation Emergency Measures Act Amendments (cont’d)Emergency Measures Act Amendments (cont’d) Every provincial department must prepare an emergency programEvery provincial department must prepare an emergency program Every municipality must prepare an emergency plan (must meet 60 points)Every municipality must prepare an emergency plan (must meet 60 points) - Municipalities now have paid or volunteer emergency coordinators

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Legislation City of Winnipeg Charter ActCity of Winnipeg Charter Act Secondary Dike By-law passed by City CouncilSecondary Dike By-law passed by City Council Protects permanent dikes in placeProtects permanent dikes in place Provides unencumbered corridor for temporary sandbag dikeProvides unencumbered corridor for temporary sandbag dike

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Emergency Measures Improved coordination between Emergency office and all Provincial departmentsImproved coordination between Emergency office and all Provincial departments Senior executive briefings and buy-inSenior executive briefings and buy-in Updated evacuation plans and communications strategiesUpdated evacuation plans and communications strategies Increased training and education at health care facilities, regional health agenciesIncreased training and education at health care facilities, regional health agencies

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Emergency Measures Improved communications through conference calls, and websites for municipal representatives before, during and after floodsImproved communications through conference calls, and websites for municipal representatives before, during and after floods Information disseminatedInformation disseminated Concerns heardConcerns heard

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Highways Study of Flood Resistant Strategic Highway Routes within the Red River ValleyStudy of Flood Resistant Strategic Highway Routes within the Red River Valley Identified alternate unrestricted routes from North Dakota and MinnesotaIdentified alternate unrestricted routes from North Dakota and Minnesota Various size floods up to 1 in 700 yearVarious size floods up to 1 in 700 year

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Floodway Operation A review of the Red River Floodway Operating Rules resulted in some minor revisions to how the Floodway is operatedA review of the Red River Floodway Operating Rules resulted in some minor revisions to how the Floodway is operated Changed from flows to elevationsChanged from flows to elevations Created Advisory BoardCreated Advisory Board

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Floodway Operation Updated for Floodway Operation:Updated for Floodway Operation: River profilesRiver profiles Flooded area mapsFlooded area maps Flood frequency curvesFlood frequency curves Floodway Inlet Rating curveFloodway Inlet Rating curve

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba WHAT’S NEXT

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Red River Floodway Expansion Study of artificial flooding and potential mitigation in the Rural Municipality of RitchotStudy of artificial flooding and potential mitigation in the Rural Municipality of Ritchot Riverbank Stability StudyRiverbank Stability Study Emergency Preparedness PlanEmergency Preparedness Plan

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba City of Winnipeg Flood protection infrastructure improvementsFlood protection infrastructure improvements Primary dike upgradingPrimary dike upgrading $100 million$100 million

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Emergency Measures On-going review of effectiveness of legislative amendmentsOn-going review of effectiveness of legislative amendments Continue working with municipalities for improved emergency plansContinue working with municipalities for improved emergency plans Apply Best Practices for emergency managementApply Best Practices for emergency management

Manitoba Floodway Authority Manitoba Floodway Authority Mitigation - Manitoba Manitoba – Flood Protection Program Another flood protection program for properties that did not take advantage of 1997 to 2003 program ??Another flood protection program for properties that did not take advantage of 1997 to 2003 program ?? Expect that same criteria would applyExpect that same criteria would apply Legislative requirement to build to 1997 flood level + 0.6mLegislative requirement to build to 1997 flood level + 0.6m Property owner pays part of protectionProperty owner pays part of protection Ring dikes, earth raising, structural dikesRing dikes, earth raising, structural dikes