Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS 2014-2019 PROPOSED HIGHWAY.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

City of Hubbard Transportation System Plan Update April 25, 2012.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, CONSTRUCTION PROGRAM PREVIEW.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
September 24, 2012 Genesee County Road Commission Dye & Court Roundabout Dye Road and Court Street Roundabout Construction John Daly, Manager-Director.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Presented by Public Works Department Traffic Engineering Division Board of County Commissioners September 9, 2014 Red Light Camera Update.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 4, 2014 FUNDING AND REVENUE PROPOSED HIGHWAY IMPROVEMENT PROGRAM.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 29,
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
City of Leawood Bicycle Friendly Community The Year in Review.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 1, 2013.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Southern Bridge Project Brown County Executive
Rural Transportation Planning Eunice Fitzpatrick Transportation Planner Kentucky River ADD Hazard, KY.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Forecasting and Evaluating Network Growth David Levinson Norah Montes de Oca Feng Xie.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Putting Together a Safety Program Kevin J. Haas, P.E.—Traffic Investigations Engineer Oregon Department of Transportation Traffic—Roadway Section (Salem,
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
Best Practices for Collecting Counts and Risk Evaluation for Bicyclists and Pedestrians Krista Nordback, P.E., Ph.D., PSU Taylor Phillips, PSU Mike Sellinger,
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
Capital Plan Update FMCB Meeting February 26, 2016 Pre-Decisional – Draft for discussion only.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
Operations and Service Concept
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
San Mateo Countywide Transportation Plan update
Southern Bridge Project Brown County Executive
Interlocal Cooperative Agreement FY 20
Presentation transcript:

Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY IMPROVEMENT PROGRAM 1

PRESENTATION SCHEDULE: YEAR HIGHWAY IMPROVEMENT PROGRAM PWTC 2014 Meeting DatePresentation Topic February 26 Preview 2014 Construction April 2 Overview/Source of Projects April 30 Preservation Projects May 7 Modernization and Expansion Projects May 28 Funding and Revenue June 4 Project Listings June 25 Draft Program Document 2

FIVE YEAR HIGHWAY IMPROVEMENT PROGRAM 3 Management philosophy sets system priorities: 1 - Preservation 2 - Modernization 3 - Expansion Last meeting highlighted Preservation This presentation focuses on Modernization and Expansion

PRIORITY TWO: PRIORITY TWO: MODERNIZATION 4 Project set developed through traffic analysis Projects provide improvements to the system, for example: Intersection improvements – turn lanes, signals Safety improvements ITS elements in Lake County PASSAGE Addition of bicycle facilities or pedestrian accommodations

PROPOSED BIKE FACILITIES 5

AVERAGE DAILY TRAFFIC 6

LEVEL OF SERVICE DATA 7 2 way intersections (134 total) Level of ServiceAM Peak HourPM Peak Hour (best)A2322 B2820 C3529 D1012 E119 (worst)F2742 Multiway intersections (18 total) Level of ServiceAM Peak HourPM Peak Hour (best)A84 B66 C31 D02 E02 (worst)F13 Signalized intersections (252 total) Level of ServiceAM Peak HourPM Peak Hour (best)A2927 B4339 C5430 D4628 E2031 (worst)F6097 Helps traffic engineers evaluate how a given intersection is functioning. Better levels of service mean fewer delays at the intersection. Intersections should perform at a level of “C” or better to meet driver expectations.

TRAFFIC VOLUMES: INTERSECTIONS 8

AVERAGE DAILY TRAFFIC: THEN & NOW 9

2014 CRASH SUMMARY (2012 TCAS DATA) 10

HISTORICAL PERSPECTIVE: CRASHES* 11

LAKE COUNTY TRAFFIC SIGNALS 12

FIBER OPTIC NETWORK 13

EXPANDING COMPUTER AIDED DISPATCH (CAD) COVERAGE 14

PASSAGE: ASSET INVENTORIES 15 Traffic Signals year addedsignals Total470 Hubs & Switches year addedCom HubWirelessDatalink Total PTZ Cameras year addedcameras Total293 Fiber Optic Cable (miles) Planned27 Existing254 Construction8 Total289 HAR Towers Total5

PRIORITY THREE: EXPANSION 16 Projects in this category address highway capacity issues Typical projects: Adding lanes to existing system Building new roads Projects in this category are usually expensive and have longer timeframes for completion

AVERAGE ROAD LENGTHS 17

AVERAGE DAILY TRAFFIC 18

GROWTH IN LANE MILES: COUNTY-OWNED ROADS 19

ANNUAL VEHICLE MILES ON COUNTY- OWNED ROADS 20

2040 ROADWAY PRIORITIES Peak period trips estimated to increase by 36% between 2010 and miles of roadway Improvements recommended 7 interchange 9 intersection 65 corridor

HISTORY: DAILY VEHICLE MILES 22

EXPANSION PROJECTS (FROM 2013 TO 2018 PROGRAM) 23

SUMMARY 24 Priority Two: Modernization Reduce delays and increase safety by accommodating short-term traffic growth and the needs of non- motorists. Priority Three: Expansion Provide highway capacity to meet long-term traffic growth needs and provide for economic development.

PRESENTATION SCHEDULE: YEAR HIGHWAY IMPROVEMENT PROGRAM PWTC 2014 Meeting DatePresentation Topic February 26 Preview 2014 Construction April 2 Overview/Source of Projects April 30 Preservation Projects May 7 Modernization and Expansion Projects May 28 Funding and Revenue June 4 Project Listings June 25 Draft Program Document 25