OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch 10.1-10.4 Koç University Zeynep Aksin

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Lean Operations (JIT) Module
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
LEAN system.
Lean Operations (JIT) Module
Operations Management Just-in-Time Systems Supplement 12
Chapter 8: Quality Management © Holmes Miller 1999.
Beni Asllani University of Tennessee at Chattanooga
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
Lean for Process Manufacturing QAD Midwest User Group Meeting Stephen Dombroski – September 2011.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Lin/Operations/Lean Ops1 Lean Operations Module u House Building Game »The transition to Lean Ops u The Paradigm of Lean Operations: The ideal »Basic philosophy.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Chapter 7, Lean Thinking and Lean Systems
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
OPSM 501: Operations Management Week 5: Batching EOQ Koç University Graduate School of Business MBA Program Zeynep Aksin
Just-In-Time & Lean Systems
LEAN system.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Lean Production.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
Class 24: Process Integration: Lean Operations Chapter
Lean operations and JIT
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
Just-In-Time and Lean Production
Inputs and Outputs to APP
Presentation transcript:

OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin

High-Inventory Manufacturing D : 3/4 hr/unit B : 1/10 hr/unit C : 1 hr/unit B : 1/10 hr/unit A : 1/2 hr/unit Time (hours) months (24 hrs a day, 7 days a week) inventory avg. inventory Order : 1000 units

Low-Inventory Manufacturing D : 3/4 hr/unit B : 1/10 hr/unit C : 1 hr/unit B : 1/10 hr/unit A : 1/2 hr/unit Time (hours) months avg. inventory Order : 1000 units inventory Move batches of 200 Release materials according to the bottleneck

When do you detect quality problems? D B C B A Damage done Quality control

How do you incorporate engineering changes? D B C B A Engineering change one month after start of order

Shorter Lead time - High margins D B C B A overtime No overtime Quoted lead time of the order is 3 months

Due-date performance D B C B A Forecast validity

Batch Flow Operations Carry a Lot of Inventory

Some Japanese  Kaizen-continuous improvement  Muda-eliminate waste  Jidoka-quality at the source, root cause  Heijunka-level production, mix model  Kanban-JIT (just intime)-a mechanism to “pull” production

Zero non-value added activities (muda) Zero defects, zero breakdowns, zero inventory, zero set-up Production flow synchronized with demand (JIT) One-unit-at-a-time flow Mixed model production (heijunka) Piece-by-piece transfer (ikko-nagashi) Match production demand based on Takt time Pull instead of push Supermarket / Kanban Make-to-order Quality methods to reduce defects Fool-proofing (poka-yoke) and visual feed-back Detect-stop-alert (Jidoka) Defects at machines (original Jidoka) Defects in assembly (Andon cord) Build-in-quality (tsukurikomi) Flexibility Standardization of work Worker involvement Quality circles (Kaizen) Fishbone diagrams (Ishikawa) Skill development / X-training Reduction of Variability Quartile Analysis Standard operating procedures Adjustment of capacity to meet takt-time Multi-task assignment Reduce inventory to expose defects 8.5

Zero Inventories Zero Defects Flexibility / Zero set-ups Zero breakdowns Zero handling / non value added Just-in-time Production Kanban Classical Push “Real” Just-in-time Mixed Production Set-up reduction Autonomation Competence and Training Continuous Improvement Quality at the source OrganizationMethodsPrinciples The System of Lean Production (Toyota, Citroen, …)

Avoid unnecessary inventory To be seen more as an ideal To types of (bad) inventory: a. resulting from defects / rework b. absence of a smooth process flow Remember the other costs of inventory (capital, flow time) Pictures: Citroen Inventory in process Buffer argument: “Increase inventory” Toyota argument: “Decrease inventory” Principles of Lean Production: Zero Inventory and Zero Defects

Flexible machines with short set-ups Allows production in small lots Real time with demand Large variety Maximize uptime Without inventory, any breakdown will put production to an end preventive maintenance Avoid Non-value-added activities, specifically rework and set-ups Principles of Lean Production: Zero Set-ups, Zero NVA and Zero Breakdowns

Push: make to forecastPull: Synchronized production Pull: Kanban Visual way to implement a pull system Amount of WIP is determined by number of cards Kanban = Sign board Work needs to be authorized by demand Classical MRP way Based on forecasts Push, not pull Still applicable for low cost parts Part produced for specific order (at supplier) shipped right to assembly real-time synchronization for large parts (seat) inspected at source Methods of Lean Production: Just-in-time

Cycle Inventory Cycle Inventory Cycle Inventory Cycle Inventory Production with large batches End of Month Beginning of Month Cycle Production with large batches End of Month Beginning of Month Cycle Production with large batches End of Month Beginning of Month Cycle Production with large batches End of Month Beginning of Month Inventory End of Month Beginning of Month Produce Sedan Produce Station wagon End of Month Beginning of Month Produce Sedan Produce Station wagon End of Month Beginning of Month Produce Sedan Produce Station wagon End of Month Beginning of Month Produce Sedan Produce Station wagon Methods of Lean Production: Mixed Production and Set-up reduction

Create local decision making rather than pure focus on execution Use machines / tools, but avoid the lights-off factory Automation with a human touch Cross training of workers Develop problem solving skills Organization of Lean Production: Autonomation and Training 10-16

Solve the problems where they occur - this is where the knowledge is - this is the cheapest place Traditional: inspect and rework at the end of the process Once problem is detected, send alarm and potentially stop the production Own ProcessNext ProcessEnd of LineFinal Inspection End User $$$$$ Rework Reschedule very minor minor delay Significant Rework Delayed delivery Overhead Warranty cost recalls reputation overhead Defect found Defect fixed Organization of Lean Production: Continuous Improvement and Quality-at-the- source 10-17

The River Analogy Defects Defective Materials Machine BreakdownsLong Set ups Long Lead timesUnsuitable Equipment Uneven Schedules Unreliable Suppliers Inefficient LayoutsAbsenteeism Rigid Work Rules

Ongoing objectives  Improve process flows –Efficient plant layout –Fast and accurate flow of material and information  Increase process flexibility –Reduce changeover times –Cross-training  Decrease process variability –Flow rates –Processing times –Quality  Minimize processing costs –Eliminate transportation, inspection, rework

How?  Improve process flows –Cellular layouts –Demand pull mechanisms  Increase process flexibility –Fast changeovers –Smaller lotsizes, level production  Decrease process variability –Standardize –Improve supplier reliability and capacity –Safety capacity, preventive maintenance –Fast feedback and correction  Minimize processing costs –Improve quality, eliminate non-value-adding activities