Restrictions LOA244 m Draught11 m Air Draught18 m
Statistics Total length quay walls4 000 m Number of berths25 Number of the covered warehouses24 Area of the covered warehouses sq m Area of the open air warehouses sq m The container yard has 1,500 ground slots on 3 high
Equipment Number of the cranes76 Number of the forklifts74 Number of front loaders23 Number of the terminal tractors 16
Cargo throughput statistics last 5 years Total throughput tons x 1000
Box statistics last 5 years in TEU TEU numbers
Main commodities 2003 Ores and concentrates Coal Metals Raw sugar Containers Grain Others Total Tons x 1,000 2,170 1,738 1, ,032 20% 4% 8%2% 29% 35%
Main container lines: EVERGREEN MSC ZIM BULCON
MAIN GOALS: MAIN GOALS: Modern management; Meeting the clients’ requirements at highest possible level; Error-free work; Services quality assurance.
Berth No. CommoditiesVolume (1,000 t) Objective Vessel (DWT s/ll) Remarks Berth No Cast Iron (Import) 2. Clinker (Export) 3. White Clinker (Export) 4. Concentrate (Import) , ,500 15,000~40,000 3,000~45,000 Berth No. 31 is also available to handle these cargoes. Berth No. 31 and Coke (Import) 6. Coal (Import) 7. Iron Ore (Import) 8. Concentrate (Export) 636 1,260 1, ,000~75,000 90,000~113, ,000 3,000~10,000 Total6,520 Cargo Handling Volume and Objective Vessels at Each Berth
Description Project Scales 1. East Breakwater1,196 m 2. Terminal 2A 2.1 Berth No Berth No Berth No Berth No.33 (partially) 2.4 Stone Dikes West Stone Dike East Stone Dike Length: m Length: m Length: m Length: m Length: m Length: m Depth: m Depth: m Depth: m 3. Dredging Works 3.1 Access Channel 3.2 Basin Length: 6,623 m Volume: 5,380,000 m 3 Volume: 1,450,000 m 3 Depth: m Depth:-15.50/14.50/11.50 m 4. ReclamationVolume: 1,920,000 m 3 Area: 268,000 m 2 5. Storage Yards 5.1 Coal & Coke Storage Yard 5.2 Ore Storage Yard 5.3 Clinker Storage Yard 5.4 Common Storage Yard 37,500 m 2 42,600 m 2 19,600 m 2 8,180 m 2 6. Yard Pavement and Roads 6.1 Asphalt heavy 6.2 Crushed Stone 6.3 Asphalt light and grassing, others 128,200 m 2 122,700 m 2 33,600 m 2 7. Utilities, communications, electrical supplies, etc. Civil and Dredging Works
Description Item Item 1. Berth No.30: Clinker Handling Equipment x Jib Cranes (lifting capacity t) 1.2 Grabs (V=6.00 m 3 ) 1.3 Front Loader for clinker handling (Tire Type Basket V=6.20 m 3 ) 5 units relocation 10 units relocation 2 units new purchase 2. Berth Nos. 31 and 32: Coal Handling Equipment 2.1 Grab for Coal (V=10.00 m 3 ) 2.2 Ship unloader (gantry crane, grab bucket type, 1,200 t /h) 2.3 Grab for coal (V=25.00 m 3 ) 2.4 Front Loader for hold operation (with basket V=1.50 m 3 ) 2.5 Front Loader for coal handling (tire type with basket V=8.50 m 3 ) 2.6 Belt Conveyor System (2 lines) 2.7 Stacker (1,200 t /h) 2.8 Reclaimer (600 t /h) 2.9 Railway Wagon Loading System (2x600 t /h) 4 units new purchase 2 units new purchase 4 units new purchase 2 units new purchase 4 units new purchase 3 units new purchase 1 lot new purchase 2 units new purchase 1 lot new purchase 4. Wagon Loading Station 4.1 Automatic Weight bridge for wagon (120 t) 4.2 Cranes (lifting capacity 16 t) 4.3 Grabs (V=6 m 3 ) 4.4 Mobile crane (16 t) to equalize wagon load 2 units new purchase 1 unit relocation Cargo Handling Equipment
WE CARE FOR YOUR CARGO