Coal distribution and transportation – Bottlenecks & plausible remedies B K SAXENA DIRECTOR(Marketing), CIL New Delhi 20 th November, 2012.

Slides:



Advertisements
Similar presentations
Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
Advertisements

Gender Perspectives in Introduction to Tariffs Gender Module #5 ITU Workshops on Sustainability in Telecommunication Through Gender & Social Equality.
COMPETITION POLICY AND ECONOMIC DEVELOPMENT PRESENTATION AT CUTS-ARC CAPACITY BUILDING WORKSHOP, LUSAKA 7 TH MARCH, 2011 BY SAJEEV NAIR, COMPETITION POLICY.
Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
GAMBIA COMPETITION COMMISSION GAMBIA COMPETITION COMMISSION Levelling the Field for Development SIXTH ANNUAL AFRICAN CONSUMER PROTECTION DIALOQUE CONFERENCE.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Hydropower Development: Experience of Nepal
Page 1© QR 2007 All Rights Reserved Unlocking Australia’s Export Supply Chain Bottlenecks Stephen Cantwell Group Executive General Manager, QR Freight.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
Logistics and Regions. Trends The regions are becoming integrated in large-scale network economies (new markets conditions, reliance on global supply.
Supply Chain Operations: Making and Delivering
ARTSA Improving Heavy Vehicle Safety Summit Chain of Responsibility and its potential to improve safety Marcus Burke National Transport Commission 16 April.
EP Transport Committee Fourth Railway Package - public hearing Brussels, 7 May 2013 Better governance of the railways – a freight perspective Tony Berkeley.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
We get them there SHIP AFRIKA ® shipafrika.com shipafrika.com © Ship Afrika ®, LLC
R AIL T RANSPORT : S PANISH I NFRASTRUCTURES P ROGRAM AND R ESEARCH AT UGR P ROF. J UAN DE O ÑA ( UGR. ES ) P ROF. J UAN DE O ÑA A SSOCIATE P ROFESSOR.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Financing Urban Public Infrastructure
0 - Press Conference - Introduction by Mr. Willy Bosmans, President of Eurogas 19 May, 2005, Hotel Hilton Vienna.
Object Of Presentation What is market What is efficiency Economic efficiency Details of three conditions Adam Smith’s Invisible Hand Other factors for.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
“Equal and open access to the market in terms of economic integration and increased competition ” Astana Forum, 24 May 2013 Presented by Hassan Qaqaya,
Transport Investing in Regions SEATS Meeting 17 February 2012.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Lalitanjali Supply Chain Management India Pvt. Ltd “Our Motto” To introduce professional practices in this chaotic and unchartered domain of mere “Trading”
Roundtable Conference on Coal 2011 Way forward to Meet Demand of Coal Current & Future Assessment for Coal Industry In India by Mr. V K Sehgal Mg Director.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
A NEW MARKET PLAYER: THE AGGREGATOR AND ITS INTERACTION WITH THE CONSUMER interaction Ramón Cerero, Iberdrola Distribución Paris, June 9th 2010 ADDRESS.
The Draft SADC Annex on Trade in Services UNCTAD Secretariat Sub-regional Conference on Improving Industrial Performance and Promoting Employment in SADC.
Financial law as a branch of law Financial law - a set of legal rules governing social relations that arise in the process of formation, distribution and.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Melbourne Sydney Brisbane Wellington Johannesburg Cape Town Windhoek Australia’s Supply Chains – Innovate or Fail! 18 June 2008 Liesbet Spanjaard Director,
SCM-INTRODUCTION P.CHANDIRAN. What is a Supply Chain? Supply chain is a network of suppliers, manufacturing plants, warehouses, distribution centers,
Building the Case for Privatization and Deregulation of Urban and Intercity Transportation Systems Clifford Winston The Brookings Institution.
© OECD/IEA 2011 Energy Efficiency in Central Asia: Challenges and Opportunities VII KAZENERGY EURASIAN FORUM World in Transition Shaping Sustainable Energy.
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Challenges in WTO Accession —The case of Vietnam By Cristina Hernandez (UNDP-MPI Project VIE/02/009) World Bank Training Course “ Trade in Services and.
Introduction Transportation is necessary to:
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
MIFIRA Framework Lecture 2 Response analysis and MIFIRA Chris Barrett and Erin Lentz February 2012.
Cement Manufacturers’ Association Special Meeting of Standing Linkage Committee (Long Term) for Power, Sponge & Cement Sectors Emphasis on Supply of Domestic.
UNCTAD 1 CHECKLIST OF ISSUES FOR THE NEGOTIATIONS ON TRADE IN SERVICES UNCTAD, Commercial Diplomacy Programme.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
2  ETHICS IN MARKETING MEANS DELIBERATELY APPLYING STANDARDS OF FAIRNESS OR MORAL RIGHTS AND WRONGS TO MARKETING DECISION MAKING,BEHAVIOUR AND PRACTICE.
Bitrina Diyamett Science, Technology and Innovation Policy Research Organization (STIPRO) 19th March 2016 FES Young Leaders Forum on “Matching the Skills.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Advancing Railway Service within the Freight Logistics Supply Chain Presentation to the 5 th Annual Canada Maritime Conference Cliff Mackay, President.
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
Logistics. 英语班级: 08 级 1B6 专业:物流管理 组员: 温凯靖 王蒙露 叶雯雯 马昀 王晓 林.
THE IMPACT OF GLOBAL LOGISTICS
International Livestock Research institute
Logistics – An Introduction
GROWTH OF INFRASTRUCTURE IN INDIA
6th Coal Summit Indian Coal – Sustaining the Momentum
Overview on Renewable energy in Bulgaria
Auction of Coal Linkages for Non-Regulated Sector (Tranche IV)
Addressing the challenge of water scarcity and droughts
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

Coal distribution and transportation – Bottlenecks & plausible remedies B K SAXENA DIRECTOR(Marketing), CIL New Delhi 20 th November, 2012

Distribution of coal – perspectives and policies Distribution and Pricing of coal deregulated in the year 2000 A policy for distribution of coal introduced by CIL including internet based e-auction of coal in The Policy was challenged in the Court of Law A direction was given by the Hon’ble supreme Court to introduce a New Coal distribution Policy involving all the stake holders. A committee under the Chairmanship of Secy(Coal) deliberated the issues and recommended a policy which was introduced by Govt on 18-Oct-2007 Genesis

Salient Features of NCDP 3 Core-Non Core classification done away with New Classification - keeping in view the regulatory provision Defense & Railway to get full requirement at notified price. Power & FTZ Sector to get 100% of normative requirement through FSA at notified price. All other to get 75% of normative requirement through FSA. Small & Medium Enterprise Sector having requirement up to 4200MT per year to get coal from Agencies to be nominated by States/UTs – quantity earmarked 8 Mt/ year Domestic Coal Imported Coal FSA with State Nominated Agencies ( 8 mt) DIRECT FROM CIL FSA (100%) FSA (75%) E-auction Spot auction Forward auction POWER/CPP/FTZ/ DEF OTHER INDSTRIES

Salient Features (NCDP) ……. (cont) 4 All existing linkage holders including SMEs required to execute FSA for continuation of coal supply. For new consumers – Power, Cement and Sponge Iron sectors LOAs to be issued on the recommendation of SLC(LT) – For other sectors CIL to be responsible for clearance of applications for issuance of LOA by supplying coal companies – LoA to have validity of 24/12 months for Power/other consumers for conversion into FSAs.

Salient Features (NCDP) ………… (Cont) 5 CIL, to meet full domestic requirement of coal under FSA, even by resorting to import, if feasible Coal being scarce commodity- discipline in its economic use suggested Around 10% of production earmarked for e-auction as an additional option for sourcing coal. Forward e-auction scheme for actual consumer to be introduced for ensuring longer term requirement

Implementation NCDP mandated CIL to meet the entire demand under the FSA even by import of coal if feasible. FSA, a legally enforceable document, contains provisions for penalty and incentives for failure in meeting the commitment CIL in one hand has to accept all consumers approaching for FSA and on the other to protect its interest against the contractual failure in supply commitments. CIL had to make built-in provisions in the FSA for regulating the committed supply level which triggers penalty for supply failure. Different trigger level is set for different model of FSAs applicable to different category of consumers considering the sectoral importance and the status as to whether new or existing units 6

Coal Balance Position 7 #Production projection is at optimistic level subject to getting all clearances in time *The requirement for up-coming power stations would be on the basis of actual commissioning, the figure indicates commitment given by CIL. As per the indication available from CEA the likely demand as per commissioning schedule is as under: Particular Production Projection # Committed Demand a/c on-going supplies and LOAs for new units for Power Utilities* 727 Committed Demand a/c on-going supplies and LOAs for new units for non-power sectors 136 E-auction Total demand/requirement Gap (-) 445(-) 425(-) 386(-) 346(-) 309 Figs. In Mt Demand

Bottlenecks in the distribution arrangement The negative coal balance position in excess of 400 Mt to continue till the end of XII Plan based on LOAs issued so far Issuance of further coal clearances by SLC (LT) is withheld for the widening gap between commitment vis-à-vis availability – more than 1500 applications for about 3000Mt of coal are reported to be in pipeline (as per MOC website) The FSA model offered by CIL not acceptable to new power utilities CIL would be depending on supply of imported coal for fulfilling its FSA commitment, now amended as per the Presidential Directive Implementing policy for issuance of LOA to new consumers in the Non SLC/LT segment is also pending Supply-mix for new consumers under FSA limited up to 50% of indigenous coal for other than designated power utilities 8

Bottlenecks (continued) No level playing field for new consumers. Future consumers have no avenue to procure coal other than e-auction with limited quantity of around 10% of the production Price difference between the market driven and notified price increasing with the growth in demand The coal supplied through FSAs finding the grey market more profitable No effective means available to control diversion of coal sold under FSAs 9

Plausible remedies Prevent diversion of coal -- all buyers, excepting those in regulated sectors, to get coal through a single price mechanism E-auction already established its acceptance across all coal consuming sectors All consumers other than those in regulated sector may, therefore, be brought under e-auction – commensurate increase in quantity – level playing field for all Consumers have the scope to exercise their options in respect of quality, quantity and logistics issues – the most flexible system Termination of FSA possible in the event Government notified any material changes in the distribution policy 10

Transportation of coal While availability of coal is confined to eight states, consumers are across the length and breadth of the Country -- rail infrastructure to play most important role in coal distribution Contribution of different modes of transport in movement of coal from CIL is as under: Mode Desp% ContribDesp% ContribDesp% Contrib Rail Road MGR Belt/Rope Total Figs. In MT Movement of coal from mines by road to washeries ultimately moves by rail to consuming ends – in effect dependability on rail is more than 50%

 Sale of coal is made on FOR colliery basis. Consumers are therefore required to place rakes at the sidings.  Neither the supplier nor the buyer is in a position to ensure implementation of FSA without the involvement of Railways  NCDP, therefore, recommended for tri-partite Fuel Supply & Transportation Agreement (FSTA)  The FSAs, without the involvement of Railways would continue to be commercially not tenable Rail Transportation – key factor for distribution of coal

Transportation of coal –Bottlenecks Operational bottlenecks in rail movement:  Rationalization of sidings resulted in increased dependence on long-haul transportation of coal from mines to rail loading points  Densely populated locality, bad road conditions, disturbed political situation affect transportation  Seasonal adversities in coal fields – peak coal production and peak wagon demand seasons coincide  Accumulation of stocks at pitheads 13

Transportation bottlenecks (continues) Bottlenecks arising out of skewed distribution of production growth  Major incremental growth of CIL to come mainly from CCL, SECL and MCL  New demands were, therefore, linked to these coalfields  Transport links not developed attuned to projected growth in production  Perpetual shortfall in availability of rolling stocks resulted in accretion of stock at pitheads – These three fields account for 67% of the total stock of CIL  Railways, to achieve better tonnage, often prefer for short- haul destinations for improving turn round of rakes  A few power stations are served better than their requirement at the cost of others.

Transportation bottlenecks (continued) Imported coal additional burden on movement infrastructure  Major part of the import in the country arrives during the peak indigenous production months  Constraints at ports in handling different types of vessels constricts the choice  Rail connectivity issue narrows down the choice of Port further  Movement of coal from port and from indigenous mines – clash of priority and interest; Most of the time indigenous mines are casualties  The coal available in the country accumulates at the pitheads instead of being consumed at plants

Transportation bottlenecks (continued) Gap between requirement and availability in rail infrastructure:  Procurement of wagons around 70% of the target – acute shortage leading to continuance of use of defective/condemned wagons – safety and operational hazards  Shortage of locomotive  Track capacity – delay in project delivery  Mismatch between load-bearing capacity of tracks and wagons –leading to inefficient movement matrix

Plausible remedies  While Railways need to augment capacity both in term of track and rolling stocks, comprehensive steps to be taken by producers and users of coal for bringing efficiency in terminal operations to optimize use of the transport infrastructure  Working Group on Coal & Lignite projected transportation requirement of more than 1,00,000 truck trips/day for shifting coal at the sidings by the end of XII Plan to cater to projected rail movement.  Considering the impact of such movement on the road condition, atmosphere, and the society in general alternative modes – particularly use of cross-country conveyor for transportation of coal to railway siding needs to be ensured.

Plausible remedies …. continued  The conveyor system needs to be considered an integral part of the mining project and no stop-gap road transport arrangement should be promoted in lieu  All the requisite logistics infrastructure identified in the DPR of the mining projects -- coal crushing/sizing arrangements, railway sidings, weighbridges etc. require synchronization with production  Power stations and other bulk consumers need to develop infrastructure for handling all types of wagons  Coal handling capacity at power stations needs to be attuned to projected coal requirement

Plausible remedies …. continued  Reducing dispersion in requirement of wagons between lean and peak season -- lean season freight discount could be one of the way  Source rationalization for indigenous coal  Implementation of FSTA to make all the stakeholders accountable  Like availability of coal, transport capacity should be equally taken into account before promoting a project  Consider evacuation issues from new coalfields before according linkages  CIL investing on development of railway track in the upcoming coalfields at North Karanpura (Tori-Shivpur-Hazaribagh), Basundhara-Garjanbahal Area of MCL (Gopalpur-Manoharpur ) and Korba-Raigarh. Railways to ensure timely execution of these projects

Conclusion  Planned production of coal requires matching development of transport logistics  Railways would continue to be mainstay for evacuation of coal  Unless steps are taken to develop Railway infrastructure production potential likely to face severe jolt  Equally important is to synchronize development of loading infrastructure at collieries, including crushing and coal conveying arrangement

Conclusion  Even with growth in production coal scarcity in different consuming ends likely to persist without corresponding improvement in terminal management at loading and unloading ends  Operational and commercial bottlenecks in transportation logistics to be addressed at planning level  Scopes of optimum utilization of available infrastructure with proper attention to cost – could be a key issue to reduce dispersion in demand of wagons  Without FSTA, effective implementation of the NCDP is not possible  Rationalization of source of supply in line with transport capacity should be a priority area