Train for RP survey and visual inspection in LHC RadWG meeting - 8th May 2013 Bruno FERAL EDMS: 1284415.

Slides:



Advertisements
Similar presentations
1 Group 4 Autonomous Wi-Fi Sniffer RC Truck GIZMO Sponsor CALIT2 Mentors Javier Rodriguez Molina Don Kimball Group Members Dan Curcio Anson Hsu.
Advertisements

About us Development and production of equipment and software under Parsec trade mark started in 1997 The variety of Parsec products allow to use it.
EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
ODS3F –Observation and Detection Systems For Forest Fire Monitoring
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
RED SAUC’ISSE SAUC’ Interval Super Submarine of ENSIETA The submarine robot of the ENSIETA.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Specialized Wireless Solutions Industrial Networking Wireless Mobility Service Provider Wi-Fi Professional Hotspot.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC.
Integrated Mobile GIS and Wireless Internet Map Servers for Environmental Monitoring and Management By Ming-Hsiang Tsou
Wireless Surveillance Vehicle Lance P. Riegert Rodrigo A. Urra Steve C. Wilson September 18, 2007Wireless Surveillance Vehicle1 of 20 Senior Design Project.
EE 396/496 Scout ROV by Chris McLeod & Autonomous Systems Lab.
Sami S.Al-Wakeel 1 CHAPTER 1 INTRODUCTION. Sami S.Al-Wakeel 2 NETWORK Definition: A Group of interconnected nodes that exchange information and share.
Amr Aldaiel - Andrew Kravitz Katie Noble - Zack Taylor - Alan Yim.
R. Rinaldesi, K. Kershaw – HE Group
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
Photo Realistic 3D Cloud of Points
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
2 Stefano Agosta CERN IT/Communication Systems High-Speed Mobile Communications in Hostile Environments CHEP 2015 Okinawa 14/04/2015 High-Speed Mobile.
InSeT System Inertial Sensor Tracking System Underground Mine Safety For Personnel Utilizing Inertial Sensors Technical Presentation.
Dynamax Inc Houston, TX Turf Control System.
Dr. Jennifer Rochlis. Overview Build a technology testbed for future rover concepts Develop and demonstrate operations and mission concepts.
Chapter 9 PLC and System Maintenance
CRYOGENICS AND POWERING
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
Automated Bridge Scour Inspection FSU/FAMU College of Engineering Team 7 Proposal 10/27/2010.
Hardware Overview Autopilot Control Board- Serves as common platform for other components and has autopilot code and flight plans Battery- Powers the.
Team: Justin Audley, Blake Brown, Christopher Dean, Andrew Russell, Andrew Saunders Advisor: Dr. Richard A. Messner Sponsors: Dr. Richard A. Messner, UNH.
July ‘2011 Smolyan, Bulgaria. The Programme is co-funded by the European Union (ERDF) and National Funds of Greece and Bulgaria Project : “through pREvention.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Optical Fibres for the LHC Machine and Experimental Areas Optical Fibre Meeting 3 October 2002 Luit Koert de Jonge/ST-EL-OF.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
Train for RP survey and visual inspection in LHC Workshop on "Remote manipulations / diagnostics in radioactive areas and handling of radioactive material"
Constraints Space Load Capacity Costs Operating hours.
MSI Solutions Motion Control Stepper Motors Product Details
What is ASEMR /ASKUE/ and the Need for Its Implementation
Installation of an Instrument on a CERN machine
Helium spill in LHC tunnel
CNRAD dosimetry and Summary of the TS
Underground mobile communications at CERN
Irradiation test of Pressure Transducers for the LHC machine
IT-4328: Technical Specification
Premium Success Story Packaging O E M Market sector : GLASS
Collimator Control (SEUs & R2E Outlook)
Presentation transcript:

Train for RP survey and visual inspection in LHC RadWG meeting - 8th May 2013 Bruno FERAL EDMS:

Section EN-HE-HT B. Feral2 Our main task: Design and development of remote handling equipment for interventions in radioactive areas at CERN.

The TIM* 30 x 30: a remote controlled inspection vehicle for LHC tunnel : Radiation + oxygen measurements Visual Inspection with cameras (HD, infrared, etc) Autonomous: Battery powered Additional payload on demand 3 30cm *TIM: Train Inspection Monorail 8 May 2013B. Feral - RadWG meeting

Outline  Mission of TIM series  TIM main characteristics  TIM tests in LHC early 2013  TIM components 48 May 2013B. Feral - RadWG meeting

Development of TIM pre-series and series To provide remote inspections, radiological surveys in the entire LHC tunnel when the machine is not in access mode. Establish a reliable service that is fully automated and fully integrated in the LHC operational procedures and controls software and contributes to the full exploitation of the physics potential of the LHC. 5 Mission: 8 May 2013B. Feral - RadWG meeting

Outline  Mission of TIM series  TIM main characteristics  TIM tests in LHC early 2013  TIM components 68 May 2013B. Feral - RadWG meeting

TIM 30-30: main characteristics Visual Inspection Radiation + oxygen measurements Parks in P5 by-pass Pass from P5 - P2 and from P5 - P8 Max speed 8km/h Control from CERN Control Centre 78 May 2013B. Feral - RadWG meeting

8 General view looking upstream (low resolution) TIM visual inspection of DFBM 8 May 2013B. Feral - RadWG meeting

TIM 30-30: main characteristics Visual Inspection Radiation + oxygen measurements Parks in P5 by-pass Pass from P5 - P2 and from P5 - P8 Max speed 8km/h Control from CERN Control Centre 98 May 2013B. Feral - RadWG meeting

RP Data transmission system RP wagon PCMX sensor «Dose rate value» Ethernet NI Compact RIO ETIC 3G Modem Ethernet ETIC 3G Modem Laptop reception data 108 May 2013B. Feral - RadWG meeting

TIM 30-30: main characteristics Visual Inspection Radiation + oxygen measurements Parks in P5 by-pass Pass from P5 - P2 and from P5 - P8 Max speed 8km/h Control from CERN Control Centre 118 May 2013B. Feral - RadWG meeting

Current situation: 1 train & 1 garage Point 5 by pass is a natural garage for TIM. 12 TIM 8 May 2013B. Feral - RadWG meeting

Train1 Train2Train3 Train4 Proposal: 4 trains & 4 garages: 2 new garages shall be built on each side of point 1. It shall be possible to dismantle them during technical stop or shutdown. 138 May 2013B. Feral - RadWG meeting

TIM 30-30: main characteristics Visual Inspection Radiation + oxygen measurements Parks in P5 by-pass Pass from P5 - P2 and from P5 - P8 Max speed 8km/h Control from CERN Control Centre 148 May 2013B. Feral - RadWG meeting

TIM CCC operation 158 May 2013B. Feral - RadWG meeting

Communication network 8 May 2013B. Feral - RadWG meeting16 Surface Tunnel LHC TIM 30 x 30 Leaky feeder cable installed in the LHC tunnel – Sunrise network Modem Sunrise network Modem (CCC/CCR)

Surface (CCC/CCR) Tunnel LHC Train Cable rayonnant installé dans tout le tunnel – réseau Sunrise PLC Siemens control Radiation Data acquisition Webcam Axis 213 IPL-3G IPL-G12 PC control PC vision PC acquisition données Radiation PLC Siemens control IPL-3G réseau Sunrise Internet IPL-G12 réseau Sunrise VPN to 4 VPN to 5 VPN to 1 VPN to 2 Vers modems 3 et 6 Webcam Axis 213 Communication Network in more details 8 May 2013B. Feral - RadWG meeting17

TIM control: phone & computer network 18 Upgraded to UMTS 8 May 2013B. Feral - RadWG meeting

Outline  Mission of TIM series  TIM main characteristics  TIM tests in LHC early 2013  TIM components 198 May 2013B. Feral - RadWG meeting

Results of tests in LHC: Basic functionalities for the vehicle confirmed and tested. Basic RP survey functionality available and tested. TIM was operational for 20 days in LHC. 12 successful surveys from point 5. Number of hours of operation: 22 hours and 22 minutes. Total distance covered during the tests: 48 km. Time needed to survey a sector : 2 hours and 15 minutes Almost 100% availability ! Start/End 208 May 2013B. Feral - RadWG meeting

218 May 2013B. Feral - RadWG meeting

8 May 2013B. Feral - RadWG meeting22 DS R5 ARC DS L6

238 May 2013B. Feral - RadWG meeting RA47 – UJ47 UJ62 LSS5L & Collimator

Outline  Mission of TIM series  TIM main characteristics  TIM tests in LHC early 2013  TIM components 248 May 2013B. Feral - RadWG meeting

TIM components Motor wagonReconnaissance wagon RP wagonBattery wagonControl wagon 10.2 meters Bar code reader position 8.84 meters 1.36 meters 8 May 2013B. Feral - RadWG meeting25

8 May 2013B. Feral - RadWG meeting26

Motor Wagon SSD Parvex gearbox + Hengstler incremental encoder Ethernet Reconnaissance wagon Waldmann LED operation unit 8 May 2013B. Feral - RadWG meeting27

Reconnaissance Wagon Ethernet Motor wagon RP wagon 8 May 2013B. Feral - RadWG meeting28

RP Wagon Ethernet Reconnaissance wagon Battery wagon PCMX sensor «Dose rate value» Ethernet NI Compact RIO ETIC 3G Modem VEXTA Brushless DC motor – moving the arm RP arm 8 May 2013B. Feral - RadWG meeting29

Battery Wagon Ethernet RP wagonControl wagon Current transducer Battery controller +24V 0V 8 May 2013B. Feral - RadWG meeting30

Control Wagon Ethernet Battery wagon Remote switch Waldmann LED operation unit PXT-10 Temperature converter Battery charger Ethernet WiFi 8 May 2013B. Feral - RadWG meeting31