Page 1Smart Grid Research Consortium – October 20-21, 2011 Distribution Automation Technical Background & Current Trends Dan Murray Siemens Energy, Inc.

Slides:



Advertisements
Similar presentations
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Advertisements

Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Distributed Intelligence Provides Self-Healing for the Grid
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Xanthus Consulting International Smart Grid Cyber Security: Support from Power System SCADA and EMS Frances Cleveland
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
RT3b – André Smit, Siemens USA
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Smart Grid Research Consortium Conference Austin, Texas Mark Ponder President ElectSolve Technology Solutions and Services, Inc.
IntelliGrid: Enabling The Power Delivery System of the Future Don Von Dollen EPRI IntelliGrid Program 9th International Symposium on Power- Line Communications.
Smart Grid Mark Dudzinski August 25, What it is Why $15MM/yr** 58K tons of CO2 reduction Res consumer savings up to 10% Utility Value Example* *Utility.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Smart Grid & Microgrid R&D
August 8, 2015ECI Confidential. AccessWave Smart Grid Market Trends& Applications Matthias Nass VP Field Marketing EMEA.
Advanced Metering Infrastructure
November 2010 GREENER, SAFER, SMARTER Considerations in Building a Smart Grid Communications Network John Eichhorn, CFO.
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 TECHNOLOGY ADOPTION AND THE VALUE OF INDUSTRY COLLABORATION William.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
DOE’s Smart Grid R&D Needs Steve Bossart Energy Analyst U.S. Department of Energy National Energy Technology Laboratory Materials Challenges in Alternative.
GridWise ® Architecture Council Cyber-Physical System Requirements for Transactive Energy Systems Shawn A. Chandler Maseeh College of Electrical and Computer.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Over 3,300 Megawatts and Counting Growing and Transforming One of Nation’s Largest DSM Portfolios.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
1 AMI’s place in the future AMI is THE key enabler for the future smart grid The ‘intelligent grid’ is not intelligent without AMI Customers are not empowered.
Group Meeting – Pepco Holdings, Inc. July 17, 2014.
Distribution Automation: Fault Detection, Isolation, and Restoration
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
APS and Its Smart Grid Initiatives September 26, 2012 Tony J. Tewelis Director, Technology Innovation.
Common Information Model and EPRI Smart Grid Research
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
Seattle City Light – AMI Business Case Results
An Overview of the Smart Grid David K. Owens Chair, AABE Legislative Issues and Public Policy Committee AABE Smart Grid Working Group Webinar September.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Proprietary CVR as an Energy Efficiency Resource Prepared for: National Summit on Integrating Energy Efficiency and Smart Grid Prepared by: Applied Energy.
Nikos HATZIARGYRIOU – Greece – BETA SESSION 4b: Integration of RES+DG Barcelona May 2003 BETA SESSION 4b: Integration of Renewable Energy Sources.
PNM High-Penetration PV thru Grid Automation & Demand Response Jonathan Hawkins Manager, Electric Distribution Standards PNM Grid-InterOp 2009 Denver,
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Automation Presentation to KIB-TEK, Northern Cyprus (19/09/2007)
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
RT1b – EDF R&D Frankfurt (Germany), 6-9 June 2011  Smart Grids require a system approach and modularity  Smart Components will rely on nodes of integration.
Smart Grid Big Data: Automating Analysis of Distribution Systems Steve Pascoe Manager Business Development E&O - NISC.
Security and Resilience Pat Looney Brookhaven National Laboratory April 2016.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Irvine Smart Grid Demonstration Bob Yinger | Southern California Edison October 27, 2015.
Utility Needs and Smart Grid for Major Storm Events
The Transition to a High DER Future
RESEARCH, EDUCATION, AND TRAINING FOR THE SMART GRID
APIC 2009 Power and Energy Innovation Forum
Unitil Grid Modernization
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Karen Bartleson, President, IEEE Standards Association
Irvine Smart Grid Demonstration Distribution Volt / Var Control
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
EE362G Smart Grids: Architecture
Presentation transcript:

Page 1Smart Grid Research Consortium – October 20-21, 2011 Distribution Automation Technical Background & Current Trends Dan Murray Siemens Energy, Inc. Smart Grid Conference Rosen Shingle Creek Resort, Orlando, Florida October

Page 2Smart Grid Research Consortium – October 20-21, 2011 Topics  Overview of several Distribution Automation Applications  Technical Considerations when implementing DA Applications  Architectures  Sensors  Communications / Cyber security  Control Technologies  Other Considerations when implementing DA Applications  Current System Configuration (that is to say, your starting point)  Policies and Standards  Human Resources / Skill Sets  ROI / Budget  DA Implementation Strategies

Page 3Smart Grid Research Consortium – October 20-21, 2011 Source: [1] Leveraging AMI and BPL Technologies at CenterPoint: Energy to Build the Intelligent Grid of the Future – Don Cortez Distribution Automation Trends Example: CenterPoint Smart Grid Strategy

Page 4Smart Grid Research Consortium – October 20-21, 2011 Select DA Applications  Fault Detection Isolation and Service Restoration (FLIR or FLISR) reduces the impact of outages.  Volt/VAR Control provides greater network efficiency through improved monitoring and regulation of power on distribution lines.  Conservation Voltage Reduction (CVR) reduces load during peak periods.

Page 5Smart Grid Research Consortium – October 20-21, 2011 Fault Location Isolation and Service Restoration (FLIR or FLISR) General Description Fault Location, Isolation, and Service Restoration  Detects occurrence of a fault on a distribution feeder.  Determines the location of the fault between 2 switches or reclosers.  Isolates the faulted section between nearest switch and/or recloser.  Restores service to “healthy” portions of the feeder while maintaining safe loading limits on the second source.

Page 6Smart Grid Research Consortium – October 20-21, 2011 Fault Detection Isolation and Service Restoration (FLISR) Typical Operation Today without FLISR

Page 7Smart Grid Research Consortium – October 20-21, 2011 Fault Detection Isolation and Service Restoration (FLISR) Improved Performance using FLISR

Page 8Smart Grid Research Consortium – October 20-21, 2011 Fault Detection Isolation and Service Restoration (FLISR) Benefits Source: [2] “Equipment for Feeder Automation - Recent Trends in Feeder Automation Seminar” IEEE PES Miami Chapter Miami, Florida June 2, 2005, John McDonald, KEMA, Inc. Revenue per Distribution Mile  IOU$62,665  Muni$86,302  Coop$10,565 Source: 2006 RUS/EIA data

Page 9Smart Grid Research Consortium – October 20-21, 2011 Volt/VAR Control General Description Volt/VAR Control provides greater network efficiency through improved monitoring and regulation of power on distribution lines.  Regulation performed through coordinated use of cap banks and voltage regulators.  If DMS is used, then On Line Power Flow (OLPF) may help determine what control actions to take.

Page 10Smart Grid Research Consortium – October 20-21, 2011 Conservation Voltage Reduction General Description Conservation Voltage Reduction  Flattens the voltage profile across the feeder.  Allows monitoring of lowest voltage point to ensure it is above minimum acceptable voltage level.  Determines the necessary control actions to accomplish CVR.

Page 11Smart Grid Research Consortium – October 20-21, 2011 System Architecture NIST Smart Grid Conceptual Model – Detailed View Source: [3] Interoperability and Cyber Security Plan, NRECA CRN Smart Grid Regional Demonstration, Grant DE-OE

Page 12Smart Grid Research Consortium – October 20-21, 2011 Centralized vs. Decentralized refers to where the switching logic resides. Centralized at Centralized Decentralized Control Centerat the Substation Peer-to-peer Centralized vs. Decentralized Architecture Overview

Page 13Smart Grid Research Consortium – October 20-21, 2011 Centralized vs. Decentralized Architecture Comparison ConsiderationCentralizedDecentralized Cost  DMS: Higher starting cost  Lower starting cost Complexity  Greater time to implement  Less time to implement Skills  DMS requires more advanced skills for implementation  Most substation engineering skills portable to DA applications Suggested Use  Good starting position with existing SCADA  Many feeders to be automated  Many DA functions to be implemented  Often used is SCADA can not be upgraded  Suitable for limited deployment (based on cost) or when “patching” system

Page 14Smart Grid Research Consortium – October 20-21, 2011 Fault Detection Isolation and Service Restoration (FLISR) Components when using Peer-to-Peer Logic Approach Decentralized Feeder Automation Municipals and Cooperatives Standardize on products Available skills and expertise Cost-Driven Small Annual Budgets (Short Cycle) Better Performance Standardization Simplicity Lower Cost Short Cycle business Concept SwitchesIED Family ++ Software + Wireless + Substation HMI (Option)

Page 15Smart Grid Research Consortium – October 20-21, 2011 Fault Detection Isolation and Service Restoration (FLISR) System Integration when using Peer-to-Peer Logic 1.Automated Primary Switches/Reclosers 2.Smart Controller 3.High Speed Communication 4.Communication Protocol (DNP / IEC 61850) 5.Software Configuration Tools 6.Smart Fault Detection Capability 7.Smart Switching Logic

Page 16Smart Grid Research Consortium – October 20-21, 2011 Fault Location Isolation and Service Restoration (FLIR or FLISR) Benefits from Peer-to-Peer Approach Problem: Keeping the lights on!  Reduce outage size and duration.  Locate faults faster with less driving time.  Reduce crew size to isolate and restore.  Reduce windshield time, particularly with long distribution lines. Compelling Solution: Allows utilities to “do more with less”  Fast transfer scheme for critical load (e.g., hospital or industrial acct.)  Perform isolation and restoration faster than standard recloser and sectionalizer technology, and sometimes at a lower CAPEX cost.  Increase billing revenue through fewer and smaller outages.  Improve customer service – Resolve outages before customer calls.  Provide the ability to service a larger territory with fewer linemen.  Make use of adaptive settings for storm conditions to reduce SCADA operator work load.

Page 17Smart Grid Research Consortium – October 20-21, 2011 Fault Detection Isolation and Service Restoration (FLISR) Peer-to-Peer Example: A&N Electric Coop

Page 18Smart Grid Research Consortium – October 20-21, 2011 Communication Protocols Comparison ProtocolProCon DNP 3.0 DNP over TCP/IP  90% utilities using it  Relatively easy to use  Training classes available  No object model  No peer-to-peer  Limited security IEC  More utilities using it  Contains object model  Native peer-to-peer  Future enhancements to the standard to support DG and comm to SCADA  More complex than DNP  Interoperability issues remain but improving  Engineering tools are average but improving

Page 19Smart Grid Research Consortium – October 20-21, 2011 Source: [4] “Smart GridNet” Architecture for Utilities. Alcatel-Lucent Strategic White Paper. Telecommunication Options Commercial Carriers

Page 20Smart Grid Research Consortium – October 20-21, 2011 Telecommunication Options Direction of Wireless Technologies

Page 21Smart Grid Research Consortium – October 20-21, 2011 Communication Technology Deployment Comparison DeploymentUtilities owns networkCarrier owns network Control  Full control over life cycle  Full bandwidth following storm event  Little to no control Cost  Higher CAPEX cost  Radio: One-time expense of $1,000+ per node  Generally lower CAPEX cost  On-going maintenance cost Complexity  Radio: sight survey  Requires expertise  Outsource expertise Security  Usually the most secure  Requires expertise  Can be reasonably secured  Outsource expertise

Page 22Smart Grid Research Consortium – October 20-21, 2011 Project Management Engineering Production System Test Support DA Implementation Strategies  Requirements planning  Evaluating your system starting position  Cost / Benefits Analysis  Perform pilots and limited deployment  Implementation resources available  NRECA website (architecture framework and cyber security)  NIST

Page 23Smart Grid Research Consortium – October 20-21, 2011 Questions? Dan Murray Marketing Manager Mobile: (408) Thank you!

Page 24Smart Grid Research Consortium – October 20-21, 2011 References  [1] Leveraging AMI and BPL Technologies at CenterPoint: Energy to Build the Intelligent Grid of the Future – Don Cortez  [2] “Equipment for Feeder Automation - Recent Trends in Feeder Automation Seminar” IEEE PES Miami Chapter Miami, Florida June 2, 2005, John McDonald, KEMA, Inc.  [3] Interoperability and Cyber Security Plan, NRECA CRN Smart Grid Regional Demonstration, Grant DE-OE  [4] “’Smart GridNet’ Architecture for Utilities,” Strategic White Paper, Alcatel-Lucent, 2007.