University of Delaware December 10, 2007 Senior Design Team 15 Anthony Brazen IV Nick Hirannet Sam Holland Megan Keenan.

Slides:



Advertisements
Similar presentations
Chapter 24 ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING
Advertisements

Displaying data and calculations  How many trials have been performed?  Were there enough to satisfy the IB Internal Assessment criteria? FYI: IB wants.
Feasibility Study of Replacing an Industrial Hydraulic Lift System with an Electro-Mechanical Lift System Critical Design Review Thursday, 21 September.
Connor O’Leary, Micah Uzuh, Brandon Zimmerman, Matthew Howard Advisor: Dr. Dyer Harris.
CHAPTER 10 Sup. (Acceptance Sampling) Statistical Process Control – “Sampling to determine if process is within acceptable limits” Learned previously Acceptance.
1997B1. A kg object moves along a straight line
CHAPTER 7 ANGLE MEASUREMENT
ISQA 572/ 449 Models for Quality Control/ Process Control and Improvement Dr. David Raffo Tel: , Fax:
If you hang a block of mass m from a spring with constant k and then pull it downwards by a distance H and let it bounce up and down, the mechanical energy.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
HST Rough Toolpaths. Cut Parameters Note: The cut parameters will change based on the toolpath type. When possible the same settings will be brought into.
EPOCH 1000 Series Procedure Phased Array DGS/AVG
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Drilling, Boring, Reaming, and Tapping
G – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Acceptance Sampling Plans G For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Acceptance Sampling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Managing Quality Chapter 5.
Conceptual Design Review Senior Design University of Idaho College of Engineering.
Conceptual Design Review Senior Design
Six Sigma Quality Engineering
Team Dade Behring Mechanical Modifications to a Vibratory Tablet Feeder Prepared by: Craig Livingston Andrew Snodgrass Jordan Weinstein Aaron Winn.
2013 PROCESS FAILURE MODES AND EFFECTS ANALYSIS.  Risk based thinking is not industry dependent!  Airline (1,895 air traffic control errors in 2012)
CNC Tooling Lab 3: Basics & Calculations. Vertical Mill – Cutting Tools Identify each cutting tool found on the milling machine. (Attempt to be specific)
1 1 Slide | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | UCL CL LCL Chapter 13 Statistical Methods for Quality Control n Statistical.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
SOLIDWORKS: Lesson III – Patterns & Mirrors
Quality Control Prof. R. S. Rengasamy Department of Textile Technolgoy
CSCI 5801: Software Engineering
The Odds Are Against Auditing Statistical Sampling Plans
Teaching material for a course in Software Project Management & Software Engineering – part II.
Significance Toolbox 1) Identify the population of interest (What is the topic of discussion?) and parameter (mean, standard deviation, probability) you.
Acceptance Sampling Plans Supplement G
Chapter 13 Statistical Quality Control Method
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
Quality is Job 1. In the Beginning… Deming – the name of quality Think of autos In software –Program mistakes –Development time –Originally inspect final.
Statistical Quality Control/Statistical Process Control
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Statistical Quality Control
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Strategy Using Strategy1. Scan Path / Strategy It is important to visualize the scan path you want for a feature before you begin taking points on your.
Mechanization of Parts Handling. Parts Feeding Fabricated parts must be transported, selected, oriented properly, and positioned for assembly.
Acceptance Sampling Outline Sampling Some sampling plans
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
Or Would that be Concentration Stress?
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Setting up correctly Different types and their use
ROBOTC Software EV3 Robot Workshop
The Lego Man Basic 3D Modelling. The Head Use the Revolve Tool to get the sketch from 2D to 3D.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Lab Safety Policies  Don’t stand on lab chairs  Don’t sit or stand on lab tables  No dangling jewelry or loose clothes.  No open toed shoes.  Be careful.
Marlborough Boys College
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Indexing of Milling Machine
Auto-manufacturing of Quick Coupling in Automobile Industry Lu Peng Sha Linnan Advisor: Prof. Jeremy Li Department of Mechanical Engineering, University.
Marlborough Boys College
Guide Right™ Immediate Placement & Immediate Load
End of Line “Pass Through” Conveyor
Roller Coaster Design Calculations
Marlborough Boys College
Special motion types Special interpolation types Helical motion
Acceptance Sampling İST 252 EMRE KAÇMAZ B4 /
Attacking waste in manufacturing
AUTOMATED LIQUID DELIVERY SYSTEM
ЧПУ Delta Electronics G-коды. Примеры
Roller Coaster Design Calculations
Acceptance Sampling Outline Sampling Some sampling plans
Statistical Quality Control
Presentation transcript:

University of Delaware December 10, 2007 Senior Design Team 15 Anthony Brazen IV Nick Hirannet Sam Holland Megan Keenan

 To improve the robustness and reliability of the tablet feeding process. ◦ This can be done through prevention and detection

 The tablets are moved along the tracks with the aid of a linear vibrator creating backpressure

 The tablets drop through the holes and chutes into the flex  Sensors are currently placed at the top of the chute to detect that a tablet has fallen

 What? ◦ A flex does not receive a tablet ◦ Entire lot must be opened and inspected  Happens 45 out of 8 million tablet drops

 Why?  Tablet breaks top sensor and may get stuck in the chute ◦ Tablet bounces off side walls causing delayed drop ◦ Tablet never exits the chute  Possibility for erroneous test result  Loss of time and money due to product re-inspection ◦ Hand inspection is currently used to ensure that the correct amount of tablets are in each flex  Expensive  Time consuming

The tablets exit the chute at a 90 degree angle from entrance into chute The drastic turn could cause the tablet to hit the side walls, delaying exit from the chute

Top 10 Wants Final Ranking Wants Rate of Importance 1Quality control37 2Reliability18 3Robustness15 4Ease of Integration13 5Justifiable Cost9 Constraints Size Cleanable Removable Compatibility

PreventionDetection

 Too many modifications to the chute would cause Siemens to redesign the entire process ◦ Too expensive and time consuming  New Feature: Add sensors to the bottom of the chute ◦ Sensor detection in current process is placed at the top, which provides knowledge of the tablet entry, but problem arises upon tablet exit MetricsPerformance Value Process Time>= 1.1 tablets per second Impact <= a one second greater process time Cost Less than $60,000 for one working line

 Holes will be drilled into the sides of the chutes and the lowest point where the chutes and Lexan meet  Twelve sets of visual sensors will be attached to the bottom surface of the Lexan guard  Will utilize same communication software that Siemens currently uses

 Met with Keyence Sales Rep.  4 sensors were ordered  Two were able to be eliminated immediately based on visual inspection  FU-12 and FU-51TZ  The FU-50 and FU-59 were tested

 Test station set-up

Diameter of ALL tablets = in. Large tablet height = in. Small tablet height = in. Red = Strength of beam Green = Threshold setting FU-50 worked well for large tablets, but was quickly eliminated after missing several small tablets in the first two trials Due to large beam aperture, which causes a decrease in sensitivity

 2000 tablets were dropped  Eight trials of 250 tablets were tested  ALL tablets were detected SMALL TabletsLARGE Tablets Diameter of ALL tablets = in. Large tablet height = in. Small tablet height = in. Red = Strength of beam Green = Threshold setting

Diameter of ALL tablets = in. Large tablet height = in. Small tablet height = in. Red = Strength of beam Green = Threshold setting

 4 modes of failure for detection have been identified ◦ 2 create undesirable risk levels  Sensor gets blocked by an object  Sensor becomes unaligned ◦ Both potential effects are that sensor detects a non-existent tablet ◦ HMI and PLC controls will identify a blocked beam or misalignment

 Cutting an existing tablet track and adding a 90° turn Desired chute drops tablets straight down Eliminates current chute  2 ways to achieve this 2- 45° straight angle turn Curved radius turn Current State Desired State MetricsPerformance Value Probability of Error0 Errors for 250 Tablets Impact <= a one second greater process time Time Less than 2 mins configuration time on chute change Cost Less than $60,000 for one working line

 2 aluminum tracks were milled  Tracks were mounted on linear vibrator ◦ Test to determine what prototype allows:  Tablets to reach the end of the track  Tablets get to end of track fastest Vibration

 Tracks without flipper mechanism

Radius Track has ability to move tablets faster Current system rate = 1.1 tablets/sec Both new designs exceed this rate Angle track moved Large tablets faster

 If Siemens decides to replace their current tracks with our 45 degree turned tracks ◦ May not allow required space for vacuum mechanism  Alternative to vacuum – flipper mechanism

 Full circle rotation

 Half rotation

 Aluminum cylindrical flipper placed at end of track ◦ Six slots cut along the cylinder to receive tablets from track ◦ Upon loading, cylinder will rotate CW allowing tablets to be released

Cost Justification: 1 bad flex = $25,000 in lost productivity, re-packaging, and labor 10 bad lots per year = $250,000 Detection at the bottom of chute pays for itself

MetricsPerformance ValueAchieved Value Process Time>= 1.1 tablets per second up to 3.5 tablets per second Impact Does not perform slower than current systemUp to 350% Faster Cost Less than $60,000 for one working line$18, Detection MetricsPerformance ValueAchieved Value Probability of Error0 Errors for 250 Tablets 0 Errors for 2000 Tablets Impact Does not slow down current system by > 1 secNo extra process time Time Less than 2 mins configuration time on chute changeAutomated on Computer Cost Less than $60,000 for one working line$12,840 Tracks

 0 defects in a sample of 250 tablets is considered acceptable by Siemens statistical analysis ◦ We tested 8 samples of 250 tablets to validate this acceptance

The number of samples (n) to be taken can be calculated by the following expression:  Z(A) = standard normal variant value for  error  Z(B) = standard normal variant value for β error  = AQL (Average Quality Level)  = LTPD (Lot Tolerance Percent Defective) 2

 The acceptance number (c) (number of “defects” per sample permitted) can be determined by the following expression:   = Producer’s Risk   = Consumer’s Risk  = AQL (Average Quality Level)  = LTPD (Lot Tolerance Percent Defective)  n = Required Sample Size  c = Acceptance Number (Number of Defects Permitted in Sample) 2 c =