Schedule of Dimensions And Track & Bridge Structure for Dedicated Freight Corridor adhpm.

Slides:



Advertisements
Similar presentations
1 Chapter 7 Length of flange Introduction As the bending moment decreases towards the support, the flange plate may be varied and a smaller flange.
Advertisements

1 Rail, traffic, sleepers, and fasteners in Australia A/Prof Alex Remennikov School of Civil, Mining and Environmental Engineering University of Wollongong,
By : Prof.Dr.\Nabil Mahmoud
Increase in axle load of freight wagons. CC LOADING In order to enhance throughput to meet increasing traffic demands, Board has permitted running.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Chapter 3 LOADS ON BRIDGES.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
IR-UIC-GRFC-22/ DELHI DO NOT USE WITHOUT PERMISSION OF AUTHOR AND IR 1 INTRODUCTION OF HEAVY AXLE LOAD OPERATION ON INDIAN RAILWAYS PresentationBy.
. Condition Assessment of Railway Bridges Condition Assessment of Railway Bridges.
HIGH SPEED OHE OF INDIAN RAILWAYS
Rolling Stock requirements
Mike Roney Past Chairman – International Heavy Haul Association Excellence in Heavy Haul Railroading: Highlights and Lessons Learned from IHHA2011 October.
1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine.
A new Concrete Tie design Created by Rudy Niederer.
Geo-Synthetics Perspective in Railway Sector
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
SKV welds - limitations Fatigue life only 50 % of Rail Skill of welder very important Quality control difficult Heating Tapping fusion The Age of weld.
Chapter 11 Flange splice.
Certification of railway equipment. JSC VNIIZhT Test Centre Speakers: Alexandr Savin Eduard Gunchenko 17 October 2012 VNIIZhT (JSC Railway Research Institute)
INTRODUCTION i)Increased transportation capacity due to growth in economy ii)Strategies adopted by IR to meet the demand iii)Need for 30 tones axle load.
Sleepers A Presentation on Department of Civil Engineering,
UNIT III GEOMETRIC DESIGN OF TRACKS
Track for High Speed Trains on IR Challenges Ahead –An Overview Onkar Singh CE/Co-ord/N.E.Railway.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
LATEST INSTRUCTIONS ON TRACK
INFORMS 2012 Identifying and Prioritizing Shared Corridor Technical Challenges Brennan M. Caughron Graduate Research Assistant Rail Transportation and.
GEO TEXTILE: PERSPECTIVE FROM THE RAILWAY SECTOR A K Shrivastava. Executive Director Railway Board Rajesh Agarwal Geo-technical Engineering Directorate.
Sleepers and fastenings (N.R. Kale ).
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
The Core Group Board (ME) has nominated a core group for finalizing the technical Specifications pertaining to track and bridges, consisting of : EDCE(P),
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
TEST TRACK FOR INDIAN RAILWAYS
DEDICATED FREIGHT CORRIDOR CONSTRUCTION AND MAINTENANCE.
INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING. Introduction of high speed corridors on IR– impact & challenges before us.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
By Suresh Gupta, Dean/IRICEN. INTRODUCTION Growth in GDP during expected to be 8.1% likely to increase further in coming years. Economic growth.
Maintenance of LWR/CWR
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
DEDICATED FREIGHT CORRIDOR
TSI WAGONS (321/2013) modifications BEWAG 27/04/2015.
STANDARD MOVING & FIXED DIMENSIONS FOR DEDICATED FREIGHT CORRIDOR.
CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
AN OVERVIEW OF LAWS AND RULES GOVERNING ROAD FREIGHT TRANSPORT AND THEIR ENFORCEMENT ISSUES IN PAKISTAN Shahbaz Latif Mirza Assistant Chief National Transport.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
Railway Rolling Stock 铁工 1303 班 组员 : 蒋奔 ( 组长 ) ,胡君雅,简雪昂 资料收集:简雪昂 版面设计 : 胡君雅 制作:蒋奔.
Geometric Design of Railway Track
Reactive to Proactive Approach to Track Maintenance on Indian Railways
Semi high speed train Appropriate Track Heavy axle load train
Today´s Challenges of the Rail Infrastructure Industry
Simulation of mixed traffic on a railway section
CHALLENGES IN DESIGN & MAINTENANCE FOR MIXED TRAFFIC REGIME ON IR
Resistance and Tractive Effort
Permanent Way.
Divisional Engineer/East/Ranchi South Eastern Railway
Sustainable maintenance of high-speed lines with mixed traffic
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
UIC 518.
Chapter-2 Parts of Steel Bridges.
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
RAILWAYS, BRIDGES & TUNNELS
CHAPTER THE TRACK.
CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS.
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

Schedule of Dimensions And Track & Bridge Structure for Dedicated Freight Corridor adhpm

Terms of Reference A Committee of AMs has been nominated to decide: Maximum Moving Dimensions (MMD)-DFC & Feeder Routes, Track Loading Density (TLD) and Axle Load. Thus a look at: Track Structure. Specification of Bridges for new construction. Rehabilitation of existing Bridges for feeder routes. Board (ME) has nominated a core group for Engineering department, consisting of: EDCE(P), EDCE(B&S) & ED/W from Railway Board, ED/Track & ED/B&S from RDSO and Dean from IRICEN

MMD for Dedicated Freight Corridor AM’s Committee has proposed: MMD height for Double stack Containers, Width of Wagons 7.10m (Proposed by Mechanical Dte). 3.50m (Proposed by Traffic Directorate). (Width of a existing containers is 2.44m only.)

Proposed MMD for Dedicated freight Corridor 9 FEET 6 INCH CONTAINER HT =6.81mt WHEEL DIA 860mm ?

Inter-Operability Requirements ON FEEDER ROUTES Constraints in running a wagon as per this MMD on feeder routes: In Width: platform coping, cover over platform and other track side structures will infringe. In Height: All overhead structures including ROB, FOB, Through Girder Bridges, Tunnels, Cover Over Platforms, OHE, Electrical Crossings, Flyovers etc will infringe. Sample Study on Western and Eastern Railways has shown: Western Viramgam-Samakhiali (182km) 3 ROBs, 2 FOBs, 2 COPs and 27 Electrical Crossings. Eastern Andal-Sainthia-Pakur (151km) 5 ROBs, 12 FOBs, 39 COPs and 1 Fly Over Rail near Andal + cost of OHE & S&T

Feasibility of Larger Rolling Stock on Feeder Routes Due to constraints of existing structures, it may not be feasible to run one standard MMD on all feeder routes. It is the practice in US railroads and in Australia to have different MMD for different commodities and run them on identified corridors, cleared for them. We can adopt a similar, commodity based approach for different feeder routes. DSC height shall be implemented on Western Corridor. Smaller height may be implemented on Eastern Corridor .

Following inference can be drawn: CONTD- Following inference can be drawn: WAGON W=3500, HT=4495/4205(C/S) wagon to run at restricted speed at locations where track centers are less than 4570mm and structure distance is less than 2135mm. Suitable precautions for safety of passengers standing on the platform. The wagons shall be painted with distinctive colour.

CONTD- Inference (Contd.): Routes shall be identified and modifications carried out to COP and over head structures/OHE, where ever required. These wagons shall be confined to identified and modified routes only.

Proposed SOD for Feeder Routes on Eastern Corridor Clearance for Electrification is yet to be decided?

Proposed SOD for Double Stack Containers on Feeder Routes 7300 7300 Clearance for Electrification is yet to be decided?

Proposed Axle Loads & TLD for DFC Formation & Bridges : 30T Track on DFC : Initially for 25T which can be Upgraded to 30T subsequently Track on Feeder routes : 25T Proposed TLD :12.00 t/m (Same as HM loading)

Track Structure For 30 t axle load, 68 kg (90UTS or Greater) Rail on new design PSC Sleepers, 1660 per km on 350mm ballast shall be used. For 25 t axle loads on feeder routes, 60 kg (90 UTS) Rails on existing PSC sleepers, 1660 per km on 300 mm ballast shall be used. New PSC sleeper for 30 t axle load to suit 68kg rail are being developed by RDSO. These should be used on DFC. Flash butt welding joints to be used E-Clip type elastic fastening with improved rubber pad, being developed by RDSO shall be used. Thick Web Switches and Swing Nose Crossings in Turnouts. PSC sleepers have also to be designed for Points & crossings, Level crossings, SEJs, Bridge approaches.

Formation, Gradients & Curvature Formation width in embankment/ Cutting and centre to centre spacing shall be as follows: Single line 6.85m (As existing) Double line 12.35m Centre to centre spacing of DFC tracks 5.50m Centre to centre spacing of DFC track from existing track shall be 6.00m. Suitable thickness of sub-ballast/ blanket /reinforced earth const to be made. Curvature should be limited to 700m (2.5 degree). Ruling Gadient shall be 1 in 200 compensated.

Track and Bridge Maintenance A New approach: Mechanised Track Maintenance shall be formulated and implemented consisting of: TRC based Track geometry measurement to decide need for tamping. Need Based Mechanised Track Maintenance. Spurt Car based USFD testing. Rail Grinding. On foot inspection by PWM. And a similar plan for Bridges. All maintenance will need a daily track possession of 4 hours. A Service Road required, all along for facilitating maintenance.

EXAMINATION OF EXISTING BRIDGES Superstructure: Existing structures examined on following premises: Actual axle load and axle spacing for moving loads of WAG9 locomotive and 25 T BOXN wagons. Coefficient of Dynamic Augment (CDA) for limited speed of 60kmph .

RESULTS OF ANALYSIS: STANDARD SPAN(M) SPEED POTENTIAL OF BRIDGES FOR DIFFERENT LOADING STANDARDS OF EXISTING BRIDGES BGML LOADING Axle load 22.9T TLD 7.67T/M T. Effort 47.6T RBG LOADING Axle load 22.5T TLD 7.67T/M T. Effort 75.0T MBG LOADING Axle load 25.0T TLD 8.25T/M T. Effort 100.0T 1-25 60kmph 25-47.25 60 kmph 55 kmph 63.0 Strengthening required 78.8 50 kmph

Substructure: Substructure analysis case by case. Bearings: Technical inspection of Bearings to be done by Zonal Railways for running of 25 T axle load. Directions for checking superstructure of non standard spans, bearing and substructure of all bridges issued to Zonal Railways. Monitoring: Through Instrumentation of selected Bridges for fatigue & stress threshold. More intensive Bearing & Substructures Inspection ( will need more manpower) RDSO has issued correction slip to standard code of design for sub-structures and foundation regarding checking of sub-structures and foundation of bridges, in March 06, for all Zonal Railways, in which instructions for taking tractive effort, passive pressure of soil, tilt and shift of well foundation, hydro dynamic forces etc. have been revised.

PROPOSED LOADING STANDARDS FOR DFC BRIDGES DESIGN CRITERIA: Loading standard – Heavy Mineral loading Locomotives: Axle load 30.0 T Tractive effort 60.0 T per loco for double headed locomotives 45.0T per loco for triple headed locomotives Braking force 25.0 T per loco Train load: Axle load 30.0 T Track loading density 12.0 T/M

Thank You

Track Side Structure Profile for Dedicated Freight Corridor

Infringements on Feeder Routes, Outside Stations

Infringements on Feeder Routes, Inside Stations

Infringements on Feeder Routes, for Structures permitted under Sch-II

Track Structure Survey of current practices, carried out by JRP-2, initiated by World Executive Council of UIC indicates the following relationship between Rail Section and Axle Load:

Track Structure The Survey also indicates that rails with Higher BHN are being used for higher axle loads:

Proposed MMD on Feeder Routes of Eastern Corridor Where no D/Stack WITH KINEMATIC = 390 EXISTING WAGON W=3500 H3735/4205 SOME ROBs AND TUNNELS MAY BE EFFECTED