1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

Slides:



Advertisements
Similar presentations
1 Operational Strategy and Climate Change Operational Programs.
Advertisements

Alternative Sources of Energy Distributed Generation economics, variability factors, capacity contributions, and environmental considerations related to.
Methane Capture and Use: Current Practices vs. Future Possibilities.
ENERGY SURVEYING Please Click through this presentation.
Sistan & Balouchestan Electric Power Distribution Company
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
Jan Buijk Biogas Fuelled Cogeneration Systems.
Content of the Presentation
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Bandula S. Tilakasena Project Director Trincomalee Coal Power Project Ceylon Electricity Board 21 October, 2007 Pricing policy for renewable energy: Avoided.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Engineer Fahad Hasan Associate Yousuf Hasan Associates, Consulting engineers District cooling.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
“Energy Efficiency Guide for Industry in Asia”
Hamina Managing Director Timo Toikka Hamina Energy Ltd Mobile Operating engineer, wind power Heikki.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Presentation Technology ORC GREEN MACHINE
Distributed Power Systems ELCT 908
Interconnection of Distributed Generation
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Cogeneration.
1 Training Session on Energy Equipment Electrical Systems Presentation to Energy Efficiency Guide for Industry in Asia Chapter 1 © UNEP GERIAP Electrical.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Air Emission Benefits of CHP Air Innovations Conference August 10, 2004 Joel Bluestein Energy and Environmental Analysis, Inc. Prepared under contract.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
1 Steam to Hot Water Conversion The University of British Columbia Paul Holt Director, Generation & Distribution.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Diagnostics of photovoltaic power plants operation
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
The Future for Power Sector Regulation in Ontario Jan Carr Vice Chair, Ontario Energy Board APPrO Canadian Power Conference & Trade Show November 24, 2004.
Jandakot Bioenergy Plant Commercially-viable bioenergy from foodwaste: an Australian success story at Richgro Garden Products November 2015 Joseph Oliver.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
The Economics of Wind-Diesel Microgrids Broadway, Ste. B, Boulder, Co Peter Lilienthal 2011 International.
Diagnostics of photovoltaic power plants operation Vitezslav Benda, CTU Prague, Faculty of Electrical Engineering.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Power Distribution and Utilization Lecture # 4. Impact of dispersed storage and generation Due to the oil Embargo and the rising prices of Oil, the efforts.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
COLLUS Power Corp Presentation Ontario Energy Board Consultation to Review Further Efficiencies in the Electricity Distribution Sector Representing: COLLUS.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
West Cambridge Data Centre Ian Tasker Information Services.
Cogeneration at UC March 09, Welcome Central Utility Plant.
ASSAM DON BOSCO UNIVERSITY PRESENTATION ON SUMMER TRAINING MeECL, SHILLONG PRESENTED BY SONY JOHN LAWRINIANG(DC2014BTE0097) 9/2/20161 DEPARTMENT OF ELECTRICAL.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
Biogas Process Control and Automation. Anaerobic Digestion Anaerobic means without Oxygen Occurs at 38 degrees C Produces a combustible gas called biogas.
Introduction to Electric Power System and A. C. Supply
Renewables: Moy Wind Farm
UMCP Learning Objectives
St. Joseph’s CHP Plant Cogen Plant Location Why Cogen: What is Cogen:
Methane Capture and Use: Current Practices vs. Future Possibilities
Kosrae State Energy Action Plan Update
Design of Electric Power Systems and Utilities
Distributed Generation (DG) Modeling Criteria
City of Lebanon, Missouri Electric Department
Energy Environment ENVE 411 Energy conversions.
Presentation transcript:

1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering 26 Hiscott Street, Suite 201 St. Catharines, Ontario, L2R 1C6

2 March 10, 2009 Table of Contents 1.Introductions 2.Description of Proponents Operations 3.Description of Electrical Supply 4.Description of Biogas Projects 5.LDC’s and LDC Approval 6.Conclusions

3 March 10, 2009 Introduction – CEM Engineering Engineer consulting firm (9+ people). Specialize in “thermal power”. Committed to helping energy intensive customers manage energy use & reduce energy cost, through proper application of high efficiency energy conversion technology. Established in early Lead by Martin Lensink: –28+ years in cogen/energy sector

4 March 10, 2009 Introduction – Martin Lensink McMaster University, Mech. Eng. & Mgmt, 1980 Five (5) Energy Firms Between 1982 and present –Union Gas Ltd. (cogeneration via natural gas) –SNC Lavalin (cogeneration engineering) –U.S. Turbine Corp. (cogeneration major equipment) –Toromont Energy Ltd. (sale of cogenerated energy) –CEM Engineering (thermal power engineering)

5 March 10, 2009 Description of Proponents Operation Bayview Flowers Ltd. –Jordan Station – –Established 1971 –340,000 ft 2 –Potted plants & bedding plants –High quality cut flower arrangements –Hot water heating system

6 March 10, 2009 Description of Proponents Operation Vandermeer Greenhouses Ltd. –Niagara-On-The-Lake – –Established 1976 –280,000 ft 2 –Specialists in spray chrysanthemums –Hot water heating system

7 March 10, 2009 Description of Proponents Operation Morningside Greenhouses Ltd. –Beamsville –Established 1992 –100,000 ft 2 –Cut lilies (year round) –Heating system is steam/hot water hybrid

8 March 10, 2009 Description of Electrical Supply Bayview Flowers Ltd. –Supplied at 27.6 kV (3 phase). –1,000 kVA transformer (wye-wye). –600 V distribution bus (2,000 A; 50 kA). –Secondary metered. –180 kW emergency genset.

9 March 10, 2009 Description of Electrical Supply Vandermeer Greenhouses Ltd. –Supplied at 27.6 kV (3 phase). –1,000 kVA transformer (wye-wye). –Secondary metered. –600 V distribution bus (1,200 A; 18 kA). –Distribution bus being upgraded to 50 kA. –200 kW emergency genset.

10 March 10, 2009 Description of Electrical Supply Morningside Greenhouses Ltd. –Supplied at 4.8 kV (single phase). –167 kVA transformer. –Secondary metered. –Two (2) emergency gensets (190 kW; 122 kW). –Loads served off two (2) buses.

11 March 10, 2009 Description of Biogas Project Bayview Flowers Ltd. –1,200 m 3 Primary Digester. –1,200 m 3 Secondary Digester and storage of both biogas & digestate. –15 m 3 dry feeder (TMR type). –Biogas Cogeneration System (250 kW e and 250 kW t ). –Retrofit an existing boiler to burn biogas (with biogas blower).

12 March 10, 2009 Description of Biogas Project Bayview Flowers Ltd.

13 March 10, 2009 Description of Biogas Project Vandermeer Greenhouses Ltd. –1,526 m 3 Primary Digester. –1,526 m 3 Secondary Digester. –3,184 m 3 digestate storage. –30 m 3 Dry Feeder. –Biogas Cogeneration System (335 kW e and 400 kW t ). –40 m 3 buried tank (for liquid input). –Digestate separator. –Remote monitoring & control via Internet.

14 March 10, 2009 Description of Biogas Project Morningside Greenhouses Ltd. –1,526 m 3 Primary Digester. –1,780 m 3 Secondary Digester and storage of both biogas & digestate. –15 m 3 dry feeder (TMR type). –Biogas Cogeneration System (1900 kW e and 320 kW t ). –Remote monitoring & control via Internet.

15 March 10, 2009 LDC and LDC Approval Bayview Flowers Ltd. –LDC was Peninsula West Utilities Ltd. at the time. –LDC is now Niagara Peninsula Energy Inc. –Application was based on 1 MW e (ultimate). –Request to connect submitted August, –Need for CIA waived December, –1 MW e much less than 50% of historic minimum feeder load. –No remote trip needed. –Metering configuration changed for two (2) meters (Series Metered).

16 March 10, 2009 LDC and LDC Approval Bayview Flowers Ltd. Metering Configuration – Series Metered, Secondary Metered

17 March 10, 2009 LDC and LDC Approval Vandermeer Greenhouses Ltd. –LDC is NOTL Hydro. –CIA application submitted October, –CIA based on 750 kW e. –NOTL Hydro retained AESI to do CIA. –CIA report completed on January, –No modification required.

18 March 10, 2009 LDC and LDC Approval Morningside Greenhouses Ltd. –LDC is Grimsby Power. –CIA application submitted January, –Grimsby Power retained Dromey Design Inc. (Ian Dromey) to complete CIA. –CIA report received May, –No remote trip required.

19 March 10, 2009 Conclusions Two (2) CIA’s took 3-4 months to process In one case, CIA was not needed at all. Another LDC recently waived need for CIA for a 250 kW e system on a 27.6 kV 3 phase feeder in Southwestern Ontario. Each LDC liked our proposed protection and control system (based on SEL-451). In each case, we had/have to demonstrate that we are off-line in <160 ms (in event of abnormal conditions on LDC feeder).