11-1 ELC 347 project management Week 12. 11-2 Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
MGMT 483 – Week 11.  The issues involved in developing a project plan and schedule in the face of constrained resources (people or facilities)  Critical.
Critical Path and Gantt
ELC 347 project management
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 15.
Critical Chain Project Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Critical Chain Project Scheduling
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
Importance of Project Schedules
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
12-1 ELC 347 project management Week Agenda Integrative Project –4 th part Corrected.. Fedd back sent –5 Th part due –Outline of deliverables.
8-1 ELC 347 project management Week Agenda Assignment 4 ReGraded Integrative Project –First part Graded A few problems –2nd part Due –Outline of.
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Project Time Management
Allocating Resources to the Project
Project Management © Wiley 2007.
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
MANAGING PROJECT RESOURCES
Allocating Resources to the Project
Five Behaviors That Can Reduce Schedule Risk Getting Started Today Craig Peterson, PMP Multi-Discipline System Engineer The MITRE Corporation Co-Author:
12-1 ELC 347 project management Week Agenda Integrative Project –5 th part corrected Feed back sent –IP part 6 Due (will be corrected and returned.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Midterm Review SE503 Advanced Project Management.
Quick Recap.
Time-Cost Tradeoffs Time-Cost Tradeoff Example Time-Cost Tradeoff Example (cont’d) Project Duration (weeks)Critical Path(s)Task(s) Reduced Total Direct.
File:CCPGS05 CC present Page: 1 ETXPGS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
More on Scheduling. Recap of Last Class Activity dependencies are shown through CPM/PERT Chart. Critical path Completion date Slack time in non-critical.
1 Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2000 The TOC Center of Australia Pty Ltd 1 Critical Chain Overview – AIPM 2003 MktgCCSEAV01grh The TOC Centre of Australia Pty Ltd The.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Scheduling Work I love deadlines. I love the sound they make as they fly by. -- Douglas Adams.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Critical Chain Method These sides and note were prepared using 1. The book Streamlined: Building Lean Supply Chain Using the Theory of Constraints. Srinivasan.
Critical Chain Project Management. Outline Overview of Theory of Constraints Revisit conventional project management (Critical Path Management) Overview.
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
9-1 ELC 347 project management Day 22. Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation.
1 Critical Chain Project Management  A modern approach to dealing with uncertainty in project management (an alternative to PERT)  Developed by Goldratt.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
9-1 ELC 347 project management Day 19. Agenda Integrative Project –Part 4 Due –Part 5 Due Nov 24 (page 342) –Any of the first five sections can be resubmitted.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Scheduling Resources and Costs
ERP (21-550) Sharif University of Technology Session #6
Critical Chain Project Scheduling
Class 27: Project Management Part II
Advanced topics in planning and scheduling
ELC 200 Day 18 – Quiz Day Copyright © 2010 Pearson Education, Inc.
ELC 347 project management
ELC 347 project management
Critical Chain Project Scheduling
SE503 Advanced Project Management
ELC 347 project management
ELC 347 project management
ELC 347 project management
ELC 347 project management
Project Time Management
Presentation transcript:

11-1 ELC 347 project management Week 12

11-2 Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables (posted in WebCT) Quiz 2 Corrected –More effort wouldn’t hurt Today we will discuss Critical Chain Project Scheduling

11-3 Schedule for the final few Days Nov 28 –Assignment 5 due Nov 30 –IP part 5 due –Discussion on resource Leveling (Chap 12) Dec 7 –IP part 6 Due (will be corrected and returned within 24 hours) –Quiz 3 Assigned (Chap 10, 11, 12, & 13) –Discussion on Project Evaluation and Control (chap 13) Dec Midnight –Resubmission of IP part 1 – 5 deadline Dec 10 AM –IP project (complete) due –Resubmission of Part 6 –IP project Presentation Dec noon –Quiz 3 Due One less quiz and 2 less assignments then was identified in syllabus

11-4 Course Grading Rubric Exams 12% each)36% Assignments 7% each)35% IP Project19% Pre-professional Conduct10% Total100%

11-5 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education

11-6

11-7 BAE Systems

11-8 Theory of Constraints & Critical Chain Project Scheduling A constraint limits system output. The Goal – Goldratt TOC Methodology 1.Identify the constraint 2.Exploit the constraint 3.Subordinate the system 4.Elevate the constraint 5.Repeat the process

11-9 Dr J Edwards Deming

11-10 Variation Common Cause Inherent in the system Special Cause Due to a special circumstance Managers should Understand the difference between the two Not adjust the process if variation is common cause Not include special cause variation in risk simulation Not aggregate discrete project risks

11-11 CCPM and the Causes of Project Delay How safety is added to project activities 1.Individual activities overestimated 2.Project manager safety margin 3.Anticipating expected cuts from management time 25% 50% 80% 90% Gaussian Distribution

11-12 Wasting Extra Safety Margin 1.The Student Syndrome a.Immediate deadlines b.Padded estimates c.High demand 2.Failure to pass along positive variation a.Other tasks b.Overestimation penalty c.Perfectionism 3.Multitasking 4.Path Merging

11-13

11-14 Critical Chain Solutions  Central Limit Theorem  Standard deviation of the sum is less than the sum of the standard deviations!  Aggregating risk leads to reduced risk  Activity durations estimated at 50% level  Buffer reapplied at project level –Goldratt rule of thumb (50%) –Newbold formula (2σ)  Feeder buffers for non-critical paths

11-15

11-16 CCPM Changes  Due dates & milestones eliminated  Realistic estimates – 50% level not 90%  “No blame” culture  Subcontractor deliveries & work scheduled ES  Non critical activities scheduled LS  Factor the effects of resource contention  Critical chain usually not the critical path  Solve resource conflicts with minimal disruption

11-17

11-18

11-19

11-20 Critical Chain Solutions Bob Feeder Buffer Project Buffer Bob Buffers protect constraints and prevent delays

11-21

11-22 Critical Chain Project Portfolios Drum – system-wide constraint that sets the beat for the firm’s throughput Drum – person, department, policy, resource Capacity constraint buffer – safety margin between projects Drum buffer – extra safety before the constraint

11-23 Applying CCPM to Project Portfolios 1.Identify the drum 2.Exploit the drum a.Prepare a schedule for each project b.Determine priority for the drum c.Create the drum schedule 3.Subordinate the project schedules (next slide) 4.Elevate the capacity of the drum 5.Go back to step 2

11-24 Subordinating Project Schedules Schedule projects based on drum Designate critical chain Insert capacity constraint buffers Resolve any conflicts Insert drum buffers so the constraint is not starved

11-25

11-26 CCPM Critiques  No milestones used  Not significantly different from PERT  Unproven at the portfolio level  Anecdotal support only  Incomplete solution  Overestimation of activity duration padding  Cultural changes unattainable

11-27 Problems on 373 Assignment 5 –Problems 1,2,3 4 & 5 on page 373 & 373 Pert to CCPM –Figure total Duration –Take 50% activity duration Figure new total duration –Project buffer = 50%(old –new) –If you have non critical path critical Change to Late start Feeder buffer is 50% of slack on non –critical path