Creating LV network templates Gavin Shaddick 5 th November 2012.

Slides:



Advertisements
Similar presentations
Financing Renewable Energy: an introduction to FITs and RHI Andrej Miller Renewable Financial Incentives Office of Renewable Energy Deployment
Advertisements

R&D 1 Demand Response and Pricing in France EDFs experience New regulation Main goals 10/11 th April 2007.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Installation of New CHP system at the Old Aberdeen Campus.
13D Riverside Park, Wimborne, BH21 1QU. SOLAR PHOTOVOLTAIC.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Delivering Energy Innovations at Scale Base Birmingham Roger Hey – Future Networks Manager.
Page 1 AVC Group Delivering Heating Solutions for Social Housing AVC ALTERNATIVE ENERGY Saving energy Cutting Utility Costs Reducing Carbon Emissions.
Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.
An Introduction and Overview
CERT implementation Charles Hargreaves 11 December 2007.
SINTEF Energy Research 1 Remodece meeting January 2007 Nicolai Feilberg.
1 Project Overview Steve Cox Head of Engineering.
Energy Companies Obligation Update David Fletcher 7 October 2014.
Over 60,000 Honda MCHP Units at work in Japan
UK Energy Efficiency Chris Leigh Household Energy Efficiency and Fuel Poverty Climate Change Group DECC.
Renewable Technologies Available in Ireland Paul Kane.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Best Practices in Energy Efficiency and Renewable Energy in Commercial Buildings EGNRET 28 January 2007.
1 Load Forecast and Scenarios David Bailey Customer Energy & Forecasting Manager Soyean Kim Rate Design Manager.
Electrical Power Distribution in America % Coal 20.4% Nuclear 20.3% Natural Gas 6% Hydro Electric 3.4% Other
Economic Development & Culture The Power of Solar Energy An Introduction to the Opportunities for Condos November 23 rd, 2010 Rob McMonagle Senior Advisor.
High Performance Buildings Research & Implementation Center (HiPer BRIC) December 21, 2007 On-Site Power and Microgrids for Commercial Building Combined.
NH Utilities Programs/ Carbon Reduction Opportunities Thomas Palma, Esq., CSDP Project Development Executive.
Energy year 2013 District Heat Wilhelms District heat in Finland year 2013  Heat sales (incl. taxes) 2,31 mrd €  Sold heat energy31,7 TWh.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
2 Ice Storage Permanently Reduces Peak Demand Building A/C is the big demand problem 80 Million installed, 7+ Million units shipped last year Source:
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Homes Energy Efficiency Programme (HEEP) Master slides Mark Johnson Washington 2010.
Hitting the Targets Zara Cuming Social Product Funding Manager Clive Fowler Community Product Funding Manager HECA CONFERENCE - Solihull 2008.
Heat and Energy Saving 02 March 2009 John Russell
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Area Based Energy Efficiency Schemes in Scotland Andrew Faulk Consumer Focus Scotland.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
December 2008 Sandia Advanced Microgrid R&D Program Advanced Microgrids – Supporting Use of Renewable, Distributed, and Smart Grid Technologies for Assured.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
The Home Energy Station - More than a distributed Hydrogen refueling solution Dr. Jim Winkelman Plug Power Inc. International Conference on Automotive.
Efficient gas uses in the residential sector Marc Florette – Member of the Executive Committee June 24 th 2011.
LV Network Templates for a Low Carbon Future Mark Dale & Gavin Shaddick 26 th October 2012.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Lisa Sims Social Sales Manager Energy Company Obligation.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
Steady State Analysis Of A Microgrid Connected To A Power System
Energy year 2014 District Heat.
CESP Community Energy Saving Programme energy made better.
Variable Load on Power Stations
Power to the Coast Project Presented by: Su Wei Tan Industrial Research Ltd.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
District heating year (updated )
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
Cumbria Affordable Warmth Project Carbon Emissions Reduction Target (CERT) /12.
LV Network Templates for a Low- carbon Future Tuesday 19 th October 2010.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
Microgeneration Karl Letten – Change Programme Support Officer (Environment) Change Management.
What to do to make an energy efficiency fund an eligible alternative measure to energy efficiency obligations schemes under the regime of the Energy Efficiency.
Driving down the Cost of Motoring Robert Wiseman Energy Saving Trust Fenland Supply Chain Network: Transport and Responsible Purchasing 15 th October 2010.
The Low Carbon Existing Homes Challenge and The Green Deal Sara Pearce ConstructionSkills.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Case application: Insulation and glazing, The Netherlands Harry Vreuls, NL Agency Workshop: Harmonization in Energy Savings Calculation: How To Fit International.
Air Source Heat Pumps Edward Sharpley – Sales Manager
Energy year 2015 District Heat.
Demand Control Field Trials
Electrical Energy How is it generated and distributed?
Electrical Energy How is it generated and distributed?
Fuel Poor Network Extension Scheme Leon Cowley – Project Manager
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

Creating LV network templates Gavin Shaddick 5 th November 2012

Outline Why do we need LV templates Monitoring and data Statistical analysis Overview Clustering methodology Classification Results from summer 2012 Future developments

Acknowledgements Electrical and electronic engineering – Furong Li – Chenghong Gu – Ran Li Mathematical Sciences – Haojie Yan WPD – Mark Dale

Why do we need LV Network Templates? New Challenges Lack of real data/ understanding of the LV Network Assets on the network are expensive Growing consumer market  more connections Consumer  Prosumer adopting more green technology e.g. PV, SHP LV Network Templates

Monitoring and Data

Data Substation SMOS Fixed data Generation Wales Arbed PV

Sub-station Enclosure EDMI Customer Monitoring Ground Mounted Pole Mounted Street Furniture: Haldo Pillar How are we monitoring? 800 Sub-station Monitors 3500 Voltage Monitors 120 PV Monitors

Substation data – May – June: ed zip files (~380 sites) – July 4 th – present sftp transfer (~800 sites) SMOS data – July 16 th - present sftp transfer (~3500)

Substation data availability over period 16 th April – 17 th September Blue lines represent times when a substation supplying data Yellow lines represent dates without data.

SMOS data Voltage data over period Monday 23 rd July – Sunday 30 th July, 2012 TOTAL_CUSTOMERS: 197 PROFILE_1_CUSTOMER_COUNT : 136 PROFILE_2_CUSTOMER_COUNT : 49 PROFILE_3_CUSTOMER_COUNT: 9 PROFILE_4_CUSTOMER_COUNT: 2 PROFILE_5_CUSTOMER_COUNT: 0 PROFILE_6_CUSTOMER_COUNT: 0 PROFILE_7_CUSTOMER_COUNT: 0 PROFILE_8_CUSTOMER_COUNT: 1

PV data Left: Pattern of generated energy (units on y-axis: kWh) by 10 minutes interval over 24 hours period recorded at PV monitor on 4 selected dates: (a) 23 rd July; (b) 28 th July; (c) 7 th Aug. (d) 14 th Aug. Right : Records of sunshine hours (on y-axis, units: number of hours) at St. Athan (Wales) weather monitoring station ( covering period from 6 th July to 31 st Aug

Fixed data Primary station number Primary station name HV feeder index Substation number Substation name Transformer Transformer type Rating LV feeder Grid reference Total number of customers Number of customers in profiles 1-8 …

Generation Wales data Substation number Site name Feeder number Generator type Number of phases Installed size kW Number of units Installed size*Number of units

ARBED Delivery partner Town Local authority post code LSOA Standard property type Standard construction type Age band Wall construction Wall insulation Built form Detachment position Mains Gas Available Primary fuel type Standardised fuel type Arbed package (values: combination of ‘SWI’, ‘PV’, ‘SHW’, ‘ASHP’, ‘FS’, ‘CESP’, ‘CERT’*, where SWI = Solid Wall Insulation, PV = Photo-Voltaic, SHW - Solar Hot Water, ASHP = Air Source Heat Pump, FS = Fuel Switching, CESP = Community Energy Savings Programme, CERT = Carbon Emission Reduction Target) Arbed SWI Delivery partner Measure Completion Date or Proposed Date

Statistical analysis

Statistical analysis: Overview Develop network templates Use statistical clustering techniques group sub-stations based on load profiles Overlay fixed data onto resulting clusters Create set of classification rules Using three months of data we have already started to identify clusters which form basis of templates Example of data received over 24 hour period (Wed. 25 th July)

Statistical methodology: clustering Based on (dis)similarities in the data Data structured according to - Time (within days, 10 min intervals) - Date (days, months, season) - Sub-stations Real Power Delivered (RPD) Allocates ‘units’ to groups (clusters)

Dendrogram Black vertical lines indicate how sub-station clusters join together Highest level split is commercial (left) and residential (right) Further splits are based on magnitude (RPD) and temporal patterns

Determining number of clusters Decreasing curve of within groups sum of squares (y-axis) against increasing number of possible clusters (x-axis) by using K-means.

Classification 1.Domestic Unrestricted (single rate) 2.Domestic Economy 7 (two rate) 3.Non-Domestic Unrestricted (single rate) 4.Non-Domestic Non-Maximum Demand Economy 7 type (two rate) 5.Non-Domestic Max. Demand Customers with Load Factor 0-20% 6.Non-Domestic Max. Demand Customers with Load Factor 20-30% 7.Non-Domestic Max. Demand Customers with Load Factor 30-40% 8.Non-Domestic Max. Demand Customers with Load Factor >40% Sub-station clusters contain a mix of customer profile classes

Clusters based on overall levels of RPD (kW) and different temporal patterns Sub-station profiles over time (within day)

Sub-station profiles over time (weekly) Clusters exhibit different patterns of RPD (kW)

Future developments Primary data is being continuously received Update clustering Refine classification rules Create a set of LV templates Identify stresses on LV networks due to low carbon technologies Liaise with DNOs to discuss LV Network Templates and application in other areas

Questions?