GOLD down the drain Uli Schäfer 1 What’s left after Heidelberg.

Slides:



Advertisements
Similar presentations
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Advertisements

Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
JFEX Uli Schäfer 1 Uli Intro / overview / issues Draft, will change !!!! Some questions flagged.
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Hardware status GOLD Update 02 Feb Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Uli Schäfer JEM Plans Status (summary) Further standalone tests Sub-slice test programme JEM re-design Slice test.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Uli Intro / overview / issues
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
JFEX baseline Uli Schäfer 1 Uli. Intro: L1Calo Phase-1 System / Jets Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
S. Rave, U. Schäfer For L1Calo Mainz
Uli Schäfer 1 From L1Calo to S-L1Calo algorithms – architecture - technologies.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
Multi-Gigabit transmission BLT  GOLD Andreas Ebling, Isabel Koltermann, Jonas Kunze Andi Ebling 1.
KM3NeT-Italy Collaboration meeting 27/11/2014 Sistema di trasmissione dati su fibra ottica: Tower Sara Pulvirenti.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
L1Topo Hardware Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, U.Schäfer, E.Simioni, S.Tapprogge, A. Vogel.
Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
The Train Builder Data Acquisition System for the European-XFEL
MicroTCA Common Platform For CMS Working Group
Generic Opto Link Demonstrator
Run-2  Phase-1  Phase-2 Uli / Mainz
(Not just) Backplane transmission options
Presentation transcript:

GOLD down the drain Uli Schäfer 1 What’s left after Heidelberg

Strawman design HD-meeting 14-slot ATCA crate with custom backplane Up to 3 instances of topological processor: 2 dual-quadrant boards 1 merger Uli Schäfer 2 Backplane 640 Mb/s LVDS signalling Up to 600 lanes on a chip Up to 200 lanes on standard ATCA backplane  double that at the expense of rear transition module  non-ATCA

Topo processor modules Uli Schäfer 3 Quadrant processor stage consisting of 2 FPGAs (??) Covering one quadrant each 7*12*6.4 Gb/s from cluster/jet/muon processors Would require 42 xGb links per processor (??) Merger stage is single FPGA Operating on 640Mb/s links

Strawman design How does it fit MZ processor design (GOLD) ?  not at all Restricted choice of algorithms due to limited bandwidth from quadrant processors to merger Opto transceivers will have to go onto front panel, that’s a pain in the *** maintenance-wise  Try and adopt the unavoidable Design for a sandwich of two feeder modules and one processor Avoid the most horrible Do high speed links (6.4 and 10.4) Gb/s rather than 640 Mb/s to avoid bottlenecks Keep space in zone 3 for opto links Adapt GOLD accordingly Uli Schäfer 4

GOLD 2.0 ATCA form factor (8U x 280 mm) Standard Zone1 connectivity (2*-48V supply scheme) Zone2 xGb/s inputs from adjacent feeder modules Zone3 (RTMs) xGb/s optical links 4 processors XC6VLX240T/550T-FFG1759 : 24/36 * GTX link (6.5Gb/s) 4 processors XC6VHX380T/XC6VHX565T : 48*GTX, 24* GTH (10Gb/s) – available ~ Oct. ’10 (?) engineering samples Supply 2 processors with input data via backplane Supply 6 processors from daughter module Might have to mix standard SNAP12 (up to 6.4 Gb/s only?) and Avago transceivers Merger ??? Optical inputs from backplane via bare fibre ribbons Electrical link fan-out (*2) with CML buffers (SY58011) 1*SNAP12 out from control/merger FPGA or from processors ? Everything else stays as planned Build daughter module and backplane resident feeder module Uli Schäfer 5

Gold floor plan Uli Schäfer 6 ATCA daughter module w. 4*FMC connector 8 processors SFP / SNAP12 out Merger / control ?? SystemACE config Local routing Z1 Z2 Z3 Opto ?

Test daughter Uli Schäfer 7 Half size module 3* SNAP12 receive 36 * fanout (*2, CML) 2 FMC connectors 3 * SNAP12 transmit SNAP12 control CPLD