KERALA STATE BENCHMARK PARAMETERS BENCHMARK PARAMETERSOF.

Slides:



Advertisements
Similar presentations
World Class Standards Smart Grids ETSI Strategic Topic Philippe Lucas © ETSI All rights reserved ETSI Smart Grid workshop, June 14th 2010.
Advertisements

Partnerships in Power Franchisees
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
The Remeha µ-chp based on a combi boiler with stirling engine Ir. P.Gelderloos Ing. M.J.Bijkerk.
Load Management System
CPCS Transcom Limited Solutions for growing economies Industry and Transaction Review Conference The Reductions in Aggregate Technical and Non- Technical.
M.KUMARASAMY COLLEGE OF ENGINEERING PRESENTED BY M.AMUTHAM.RENUGA EIE DEPARTMENT.
ANALYTICS: BRINGING VALUE TO THE UTILITIES IN MITIGATING ENERGY LOSSES José-Manuel LOPEZ Istanbul, May 9, 2014.
STATE : KARNATAKA BESCOMMESCOMHESCOMGESCOM BENCHMARK PARAMETERS BESCOM CESCO GESCOM MESCOM HESCOM.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
IURPA JUNE 2002 REVENUE PROTECTION AND NEW TECHNOLOGIES.
1 COST OF SERVICE OBJECTIVES & METHODOLOGY Utah Cost of Service Taskforce May 23, 2005 Dave Taylor.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
Power C.J. Amber Owen Lucas and David. Brief History on Power The Sun  The Sun was a great source of energy since the beginning of time. Coal  Burning.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
1 City Light Rate Design- Review Presentation to Review Panel January 2013.
Solutions for Meter Data Management Layne Nelson Product Manager LODESTAR Corporation Copyright © 2005 LODESTAR Corporation - All Rights Reserved LODESTAR.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
Ivo Pinkiewicz, IENOT, POLAND DISTRIBUTION TRANSFORMER POPULATION and EFFICIENCY LEVELS IN POLAND.
BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Telegestore Paris, February Remote Management System for the Entire Energy Distribution Process Enhances the Role of Low Voltage Network as a Means.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Unrestricted © Siemens AG 2015 All rights reserved.Answers for infrastructure and cities. Data collection for city baseline and projections for Helsinki.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
2 nd ACC Workshop June 20, 2014 The SSVEC Perspective David Bane, Key Account Manager
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Ivo Pinkiewicz, IENOT, POLAND CENTRAL EUROPE MARKET SURVEY PART 1 - POLAND.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Procedures for managing workflow components Workflow components: A workflow can usually be described using formal or informal flow diagramming techniques,
NSW Public Forum Essential Energy’s Regulatory Proposal 10 July 2014 Gary Humphreys, Chief Operating Officer.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
Efficiency Measurement William Greene Stern School of Business New York University.
AWE Water Conservation Tracking Tool: Planning and Evaluating Cost-Effective Water Conservation Programs Bill Christiansen Program Manager.
Telecom Revenue Audit Slide 6.2. Customer Services Slide 6.2 Quality of service (QoS) QoS parameters prescribed by Trai : Provision of telephone after.
Dr. W. H. Wellssow, © i d s GmbH EttlingenMai 2003 CIRED Round Table 5 Fault Statistics in Distribution Networks Dr. W.H. Wellssow IDS GmbH Ettlingen,
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
LOAD RESEARCH Irrigation Load Study Utah Cost of Service Task Force August 25, 2005.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
WM-OFMP ANNUAL PERFORMANCE MONITORING OF SEVEN REGIONAL WATER COMPANIES Presented by: vera muhaxhiri.
Week 13 Introduction to compiling an energy efficiency audit report and Writing the utility analysis section.
The AMI Advantage Presented by Keith Brooks. Located in North Idaho We serve 25,000 meters 2,000 miles of power lines 73 employees Service territory has.
DOMESTIC ENERGY Exploratory calculations. About energy Energy in the fuel Energy “in the pot” Gross energy Net energy LOSSES EFFICIENCY = ENERGY OUT /
P ERFORMANCE S TANDARDS IN D ISTRIBUTION S YSTEM & E FFECTIVE DISTRIBUTION MANAGEMENT USING SMART GRIDS Group-3: Aditya -03 Ambuj -05 Deepak - 15 Kinshuk.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
ENERGY MANAGEMENT CASE STUDY. Establish an Energy Savings Strategy for your organisation.
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona May 2003 SIEMENS 1 ON-LINE ESTIMATION AND LOCATION OF NON-TECHNICAL LOSSES IN A DISTRIBUTION SYSTEM.
Modeling DER in Transmission Planning CAISO Experience
Danube Water Conference 2017, Vienna
Portugal Cove - St. Philip’s
“Internet of Things” – The new age drivers of Power Distribution Automation Speaker: Jayant Sinha Date of session: 2 Oct, 2015.
RELATIONSHIP BETWEEN A T&C LOSSES And TRANSFORMER FAILURE.
Transmission and Distribution Loss Study
Demand Response in the 7th Power Plan
The challenge of greater energy efficiency in Uzbekistan
Future Challenges For Metropolises
مفاهیم بهره وري.
NERC-WECC Coordination
NERC-WECC Coordination
III. All forms of Energy can ___________ into all other forms of energy. Examples.
DisCo Performance- An Annual Comparison
Developing Reliable and Cost-Effective Grids
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
DISTRICT INDUSTRIES CENTRE, PATHANAMTHITTA
Presentation transcript:

KERALA STATE BENCHMARK PARAMETERS BENCHMARK PARAMETERSOF

KASARGOD CIRCLE KASARGOD CIRCLE

BENCHMARK PARAMETERS - KASARGOD

Energy Input, Metered Energy & Billed Energy

Revenue Demand, Revenue Collection & Collection Efficiency

Collection, Billing & Metering Efficiency

Average Revenue Realised on Input energy & Billed energy

Aggregate Technical & Commercial Losses

Feeder trippings

Distribution Transformer failure rate

MANJERI CIRCLE

BENCHMARK PARAMETERS - MANJERI

Energy Input, Energy Billed & Energy Metered

Revenue Demand & Revenue Collected

Collection, Billing & Metering Efficiency

Average Revenue Realised on Input energy & Billed energy

Aggregate Commercial & Technical loss

Distribution Transformer failure rate

Feeder Trippings

PATHANAMTHITTA CIRCLE PATHANAMTHITTA CIRCLE

Benchmark Parameters - Pathanamthitta

Energy Input, Energy Billed & Energy Metered

Revenue Demand & Revenue Collected

Collection, Billing & Metering Efficiency

Average Revenue Realised on Input energy & Billed energy

Aggregate Commercial & Technical loss

Distribution Transformer failure rate

Feeder Trippings

END