Objectives Finish with ducts and fans Define project topics.

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Chapter 3. HVAC Delivery Systems
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Objectives Finish with Multizone Systems
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Objectives Select project topics Review for exam Learn about DOAS systems.
Important variables Water: Air: Conversion:
Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Finish with thermal storage systems Learn about plumbing systems.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
N O R T H A M E R I C A C O M M E R C I A L TDP
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Objectives - Finish with pumps and plumbing example - Learn about district cooling and heating systems.
Objectives Discus final project Load calculation.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Objectives Airflow in Ducts Fluid dynamic review Duct Design.
Objectives Describe room distribution basics Select diffusers
Ductwork Systems and Supply Arch 432. What You Need To Know Become familiar with the materials sizing ductwork Understand sizing units.
Lecture Objectives: Answer question related to Project 1 Finish with thermal storage systems Learn about plumbing systems.
Lecture Objectives: Learn about Pumps and System Curves.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Objectives Learn about Fans Discuss: Exam (I will have an extra office hour on Monday at 8:00 am) Final Project (I need your group member lists till tomorrow).
Lecture Objectives: Plumbing Pumps Hydronic distribution systems
Reminder about the Filed Trip Tomorrow 8 am St. Edward's University We will meet at 8:00 am at the south entrance of the new Science building (visitor.
Objectives Finish with Duct Design Review the design procedure and explain the theoretical background Diffuser Selection Answer question related to the.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
Course Exam Next Thursday (April 15) 7 pm Same classroom (ECJ 7.208) 2.5-hour exam Open book open notes All problem types of questions (short but comprehensive)
Objectives Finish heat exchangers Air Distribution Systems
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
Field Trip Time: Tomorrow (Tuesday) 8 am Duration 1 hour (you will be back latest at 10 am) Location Texas State University: Round Rock
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Learn about thermal storage systems

Lecture Objectives: Discuss Final Project
Objectives Finish analysis of most common HVAC Systems
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Answer questions related to HW 4
HVAC EQUIPMENT General
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Energy Efficiency in District Coiling System
Chilled Beam Performance:
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
Objectives Psychometrics Psychometrics of AHU.
HW4 Problem (Use TITUS Square Ceiling MCD diffuser
Objectives Finish duct systems Learn about plumbing systems
Review for the Exam Should be able to do all calculations associated with lectures as well as HWs Problems may deal with context i.e. Explain how thermal.
Objectives Finish with fans Learn about DOAS and VAV
Objectives Learn about Fans Discuss Exam Final Project.
Objectives - Learn about fans and fan curves
Objectives Finish with Duct Design Diffuser Selection
Lecture Objectives: Discuss HW4 parts
Lecture Objectives: Learn about plumbing system and pumps
Lecture Objectives: Learn about plumbing system and pumps
Objectives Finish with Heat Exchangers
Objectives Duct Design AND Diffuser Selection.
Lecture Objectives: Learn about Pumps and System Curves.
Follow-ups from Classes 8 and 9
Objectives Finish with Heat exchangers
Announcements Exam 1 Next Class (Thursday, March 14th):
Objectives Review exam problems Further discuss final projects
Objective Revie the Cooling Cycle Learn about air distribution systems
Objectives Discuss Rotary Heat Exchangers
Objectives Discuss Exam Finish with Diffuser Selection
Objectives Processes in Cooling towers and AHUs.
Presentation transcript:

Objectives Finish with ducts and fans Define project topics

Two types of Duct design procedure Equal friction - Covered in classes and book - keeps same pressure per unit of length  P/L Static regain - keeps the same static pressure at each branch

Two types of duct design problems You design a duct and then select the fan You have the AHU with the fan and you need to design a duct that will fit in

Fan Performance

Centrifugal fans

Axial Fans

Fan Laws “Approximate relationships” Given two aerodynamically similar fans, can extrapolate performance data Be very careful

Question How does fan power consumption vary with volumetric air flow rate?

Controlling Air Flow

Dampers

Effect on Fan Curve

VAV Operation

Summary of Air Distribution Systems Select diffuser based on ADPI Given a layout of duct system Calculate total pressure drop Identify fittings contributing most to pressure drop Deal with non-circular ducts Use fitting loss coefficient or equal length method Select the fan based on fan and duct curve

VAV Systems

DOAS configurations

Project topics (groups of 3) 1) VAV system design Fresh air requirements and recirculation rate calculation Selection of zonal and central HVAC components based on cooling and heating load components For zones: VAV boxes, reheaters, reheater plumbing For whole system: AHU and components, chiller & cooling tower, boiler, and electric power requirement Control description – sequence of operation Heat recovery system and or economizers 2) DOAS system design Fresh air requirement and split between air and hydronic loads (sensible and latent cooling loads) Selection of zonal and central HVAC components based on cooling and heating load components For zones: fan coils and plumbing For whole system: AHU and components, chiller & cooling tower, boiler, and electric power requirement Control description – sequence of operation Heat recovery system and or economizers

Project topics 3) Duct Design (in Revit and Manually) - Diffuser selection, design of local and central duct system components - Spacing issues and difference between round and square ducts - Difference between manual calculation and calculation by Revit (for a section of the duct system) - Balancing and fan selection - Life cycle analysis and optimization (fan power consumption vs. system cost)

Some graduate student project topics (group of 2) 1) Cooling systems and distribution Air cooled condenser vs. water cooled condenser (energy performance analysis) Design of plumbing systems for campus and pumping stations Control of centralized system … 2) Design of air-conditioned storage space Specific load Dehumidification is the major task …. 3) Heat recovery systems ….. 4) Your topic

Cooling and Heating Loads (For Project) » Fresh air requirement based on number of occupants:

Cooling Load Calculation Mostly computer based Handouts for manual calculation