PM eToolkit A Major Performance and Learning Tool (PLT) based on the content of DAU’s Program Managers Toolkit.

Slides:



Advertisements
Similar presentations
Ref.: New Acquisition Policy by DAU, 20 May 2003, PMT-352
Advertisements

DoD Instruction December 2008 Operation of the Defense Acquisition System Statutory and Regulatory Changes Sam Fazio DAU Midwest Region 20.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
1 Knowledge Sharing Learning Assets Life Cycle Logistics FIPT 15 January 2010 Presented by: Jill Garcia Knowledge Project Officer DAU
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Director for Acquisition
OASD Logistics and Materiel Readiness
1 May 2009 ver. 5.5 DoD Instruction December 2008 O peration of the Defense Acquisition System Statutory and Regulatory Changes DoD Instruction.
IT Acquisition Reform - Update
1 Life Cycle Logistics Knowledge Sharing Learning Assets 15 July 2011.
DAU Knowledge Management/Sharing ’05 ’06 ’07 John Hickok Director, Knowledge Management eLearning and Technology Center.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Transforming the Way We Work.
Presented at the 2nd Annual DAU-South CONTRACTING CONFERENCE & EXPO
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Transforming the Way We Work Jill Garcia Defense Acquisition University 29 October 2004 Logistics Community of Practice Knowledge Sharing Initiatives Knowledge.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
DoD Knowledge Sharing Systems and Tools for the Defense Acquisition Workforce OFIPT 1 Dec 08.
Curriculum Review Product Support Assessment-Driven DAU Performance Based Logistics (PBL) Learning Asset Transition Roadmap Presented to the Life Cycle.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
DAU KM Evolution – Past and Present DoD Deskbook And Ask-A-Professor transition to DAU. MAR 03 PMCoP transitions.
1 Dec 2009 ver. 5.6 DoD Instruction December 2008 O peration of the Defense Acquisition System Statutory and Regulatory Changes (including policy.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DoDI Approved 8 December 2008
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Product Support Considerations
The Department of Defense Acquisition Process
Presentation transcript:

PM eToolkit A Major Performance and Learning Tool (PLT) based on the content of DAU’s Program Managers Toolkit

Major Program Toolkit expanding upon DAU’s paper based PM Toolkit (15 th Edition)PM Toolkit Focus on tools to support MDAPs Separate tools, including Performance Learning Tools, for all required Plans and Analysis Documents Web enable all major Guidebooks and Handbooks and convert to performance learning tools, linked to ACQuipedia articles What Is It?

ACQuipedia Articles Provide Additional Assets Integration of Program Success Factors and Other Existing Tools Development of Performance Learning Tools That Can Support Toolkit Web-Enabled PM Toolkit Becomes Gateway to Knowledge Resources Focused On Program Managers Hard-Copy PM Toolkit Already References Some Online Tools Bringing Existing PM Toolkit to a Web 2.0 Environment

Program Manager’s e-Toolkit PM e-Tool Kit Performance Learning Tools in Addition to DAU’s PM Tool Kit PLT Examples and supporting learning assets: – Web enabled Defense Acquisition Guidebook ( Directive; new Instruction; new Guidebook) and Integrated Framework Chart (IFC)Defense Acquisition Guidebook Integrated Framework Chart – Web enabled JCIDS Instruction and Guidebook (FY09 project upon new JCIDS approval) – DoD Financial Management PolicyDoD Financial Management Policy – Tools to develop required Milestone Plans and analysis documents (FY09/10 projects) – Probability of Program Success (PoPS) Model and Service ImplementationsProbability of Program Success (PoPS) Model – Defense Acquisition Program Support (DAPS) Assessment Guide (Milestone Preparation)Defense Acquisition Program Support (DAPS) Assessment Guide – DoD IG Audit Guides for Acquisition and ContractingDoD IG Audit Guides for Acquisition and Contracting – PM Competencies and Gap Analyis Tool (FY09 project depending on Competencies approval) – PM Certification Course materials and PM Continuous Learning ModulesPM Certification Course materials and PM Continuous Learning Modules – Web enabled major guidebooks on Systems Engineering, Logistics, etc. (FY09/10 projects) – PM Community of PracticePM Community of Practice – Service and Agency PMO support sites – Contract Management Processes Guide (FY09 project to create DoD baseline process tool)Contract Management Processes Guide – Services Mall (FY09 APS project under Lyle Eesley) – Leadership Support Center (Requires ACC log-in)(Expansion under Dave Fitch)Leadership Support Center – All assets linked to ACQuisition Encyclopedia Articles (FY09/10 project) – Other assets TBD from OSD/Services/Agencies/DAU

AT&L Knowledge Management System (AKMS) Assets Directly Supporting MDAPs and PM e-Tool Kit AKSS ( Policy and Proceedures, Tools, Knowledge Gateways, Ask-A-Professor, ACQuire Search ) Web enabled Defense Acquisition Guidebook (DoDD ; new DoDI , new Guidebook)Defense Acquisition Guidebook Integrated Framework Chart (IFC)(Updated to new DoDI ) Integrated Framework Chart Web enabled new JCIDS Instruction and Guidebook Best Practices Clearing House (With addition of Multimedia Assets – video, audio) Best Practices Clearing House ACQuipedia Acquisition Community Connection (CoPs and Special Interest Areas) – Contingency Contracting Contingency Contracting – Continuous Process Improvement (Lean Six Sigma) Continuous Process Improvement – Contracting (Portal) Contracting – Data Management Data Management – DoD Wireless DoD Wireless – Earned Value Management Earned Value Management – Facilities Engineering Facilities Engineering – Information Technology (MAIS) Information Technology – Life Cycle Logistics Life Cycle Logistics – Production Quality & Manufacturing Production Quality & Manufacturing – Program Management Program Management – Risk Management Risk Management – Science & Technology Management Science & Technology Management – Small Business Small Business – Systems Engineering Systems Engineering PM Certification Course materials and PM Continuous Learning Modules Probability of Program Success (PoPS) Model and Service Implementations Probability of Program Success (PoPS) Model Defense Acquisition Program Support (DAPS) Assessment Guide (Milestone Preparation) Defense Acquisition Program Support (DAPS) Assessment Guide DoD IG Audit Guides for Acquisition and Contracting Service and Agency PMO support sites Contract Management Processes Guide Leadership Support Center (Requires ACC log-in)(Expansion under Dave Fitch) Leadership Support Center

Other Performance Learning Tool Candidates from Toolkit Topics » Acquisition Strategy Considerations » Defense Acquisition Board Timeline Milestones B, C, and FRPDR » Milestone Decision Information » Information For Milestone/Decision Reviews » S&T Linkage to Defense Acquisition Process » Joint Capabilities Technology Demonstration (JCTD) » Acquisition Program vs. ATD and JCTD » Planning, Programming, Budgeting, and Execution (PPBE) » Life Cycle Cost Composition » Cost Estimating » Performance Measurement » Contracting—Components of Contract Price » Types of Contracts » Contract Type Features » Pre-Solicitation Process » Post-Solicitation Process » Contractor Financing and Payments Direct and Indirect Costs » Assigning Indirect Costs » Life Cycle Logistics » Principal Life Cycle Logistics (Goals/Objectives) » System Operational Effectiveness (SOE) » Support Element Definitions » Life Cycle Logistics Linkage To Defense Acquisition Process » Performance-Based Logistics (PBL) » Post-Production Support Decision Process » Operational Availability » Life Cycle Sustainment Metrics » Life Cycle Sustainment Outcome Enablers

7 3 Dec 2008 Milestone A Acquisition Decision Memorandum (ADM) Analysis of Alternatives (AoA) Acquisition Information Assurance Strategy Clinger-Cohen Act (CCA) Compliance Clinger-Cohen Act Certification (MAIS) CIO Confirmation of CCA Compliance for all non-MAIS IT Consideration of Technology Issues Component Cost Estimate (CCE) Economic Analysis (MAIS) Exit Criteria Initial Capabilities Document (ICD) Item Unique Identification (IIUD) Implementation Plan Life Cycle Signature Support Plan Market Research MDA Program Certification Program Protection Plan (PPP) Systems Engineering Plan (SEP) Technology Development Strategy (TDS) Test & Evaluation Strategy (TES) Milestone A Other Performance Learning Tool Candidates from new Requirements - Milestone A New terms/requirements in bold blue italics

8 3 Dec 2008 Milestone B Other Performance Learning Tool Candidates from new Requirements - Milestone B 1: Part of Acquisition Strategy. 2: Program Initiation for Ships. 3: OSD LFT&E Oversight Programs Acquisition Decision Memorandum (ADM) Analysis of Alternatives (AoA) (update) Acquisition Strategy Affordability Assessment Acquisition Program Baseline Acquisition Information Assurance Strategy Alternate Live Fire T&E Plan Benefit Analysis & Determination Capability Development Document (CDD) Clinger-Cohen Act (CCA) Compliance Clinger-Cohen Act Certification ( MAIS) CIO Confirmation of CCA Compliance (non-MAIS IT) Consideration of Technology Issues (ACAT I & II) Competition Analysis Component Cost Estimate (CCE) (MAIS) Cooperative Opportunities Core Logistics Analysis/Source of Repair Analysis Cost Analysis Requirements Description (CARD) (MDAP & MAIS) Corrosion Prevention Control Plan Data Management Strategy (in acquisition strategy) Economic Analysis (MAIS) Exit Criteria Initial Capabilities Document (ICD) Independent Cost Estimate (ACAT I) Independent Technology Readiness Assessment (TRA) (ACAT ID) Information Support Plan (ISP) Industrial Base Capabilities (MDAP) Item Unique Identification Impl Plan (SEP annex) Live Fire T&E Waiver Life Cycle Sustainment Plan (LCSP) Life Cycle Signature Support Plan LRIP Quantities (ACAT I & II) Manpower Estimate (MDAP) Market Research MDA Program Certification MDA Assessment of compliance with Chemical, Biological, Radiological, and Nuclear Survivability Requirements Net-Centric Data Strategy (in ISP) Operational Test Agency OT&E Report Preliminary Design Review Report PM’s Developmental Test Report Program Protection Plan (PPP) Programmatic Environmental Safety & Occupational Health Evaluation (PESHE) Replaced System Sustainment Plan (MDAP) Selected Acquisition Report (SAR) (MDAP) Spectrum Supportability Determination Systems Engineering Plan (SEP) System Threat Assessment Report (STAR) (ACAT I) System Threat Assessment (ACAT II) Technology Readiness Assessment (TRA) Test & Evaluation Master Plan (TEMP) New terms/requirements in bold blue italics

9 3 Dec 2008 Other Performance Learning Tool Candidates from new Requirements – Milestone C Statutory & Regulatory Requirements Acquisition Decision Memorandum (ADM) Analysis of Alternatives (AoA) (update) Acquisition Strategy Affordability Assessment Acquisition Program Baseline Acquisition Information Assurance Strategy Benefit Analysis & Determination Capability Production Document (CPD) Clinger-Cohen Act (CCA) Compliance Clinger-Cohen Act Certification ( MAIS) CIO Confirmation of CCA Compliance (non-MAIS IT) Consideration of Technology Issues (ACAT I & II) Competition Analysis Component Cost Estimate (CCE) Cooperative Opportunities Core Logistics Analysis/Source of Repair Analysis Cost Analysis Requirements Description (CARD) (MDAP & MAIS) Corrosion Prevention Control Plan Data Management Strategy (in acquisition strategy) Exit Criteria Initial Capabilities Document (ICD) (if program initiation) Independent Cost Estimate (ACAT I) Independent Technology Readiness Assessment (TRA) (ACAT ID) Information Support Plan (ISP) Industrial Base Capabilities (MDAP) Item Unique Identification Plan (SEP annex) Life Cycle Sustainment Plan (LCSP) Life Cycle Signature Support Plan Manpower Estimate (MDAP) MDA Program Certification (if program initiation) Military Equipment Validation (in acquisition strategy) Net-Centric Data Strategy (in ISP) Operational Test Agency OT&E Report PM’s Developmental Test Report Program Protection Plan (PPP) Programmatic Environmental Safety & Occupational Health Evaluation (PESHE) Selected Acquisition Report (SAR) MDAP (if rebaselined) Spectrum Supportability Determination Systems Engineering Plan (SEP) System Threat Assessment Report (STAR) (ACAT I) System Threat Assessment (ACAT II) Technology Readiness Assessment (TRA) Test & Evaluation Master Plan (TEMP) New terms/requirements in bold blue italics

10 3 Dec 2008 Acquisition Decision Memorandum (ADM) Analysis of Alternatives (AoA) (AIS only ) Acquisition Strategy Acquisition Program Baseline Acquisition Information Assurance Strategy Beyond LRIP Report (DOT&E T&E Oversight Programs) Clinger-Cohen Act (CCA) Compliance Clinger-Cohen Act Certification ( MAIS) CIO Confirmation of CCA Compliance (all non-MAIS IT) Component Cost Estimate (CCE) Cost Analysis Requirements Description (CARD) (MDAP & MAIS) Data Management Strategy (part of Acq Strategy) Economic Analysis Exit Criteria IT and NSS Joint Interoperability Test Certification (all IT incl NSS) IOT&E Completed ACAT I and II (conventional weapons systems for use in combat) Independent Cost Estimate (ACAT I) (if MDA requests) Life Cycle Sustainment Plan (LCSP) Live Fire T&E Report (OSD LFT&E Programs) Manpower Estimate (MDAP) Military Equipment Validation (part of Acq Strategy) Operational Test Agency OT&E Report Post Implementation Review Programmatic Environmental Safety & Occupational Health Evaluation (PESHE) Test & Evaluation Master Plan (TEMP) Other Performance Learning Tool Candidates from new Requirements – FRPDR All programs except where noted (see encl. 3, DoDI ) For AIS systems, FRPDR is the Full Deployment Decision Review New terms/requirements in bold blue italics

11 3 Dec 2008 Other Performance Learning Tool Candidates from new Requirements – Operations & Support Operations & Support FOC Purpose: Execute a support program that meets materiel readiness and operational support performance requirements, and sustains the system in the most cost-effective manner over its total life cycle. Life Cycle Sustainment Disposal Entrance: Approved CPD; approved LCSP; successful FRP Decision Activities: Performance-Based Life-Cycle Product Support (PBL) planning, development, implementation, and management; initiate system modifications as necessary; continuing reviews of sustainment strategies Guided by: Acquisition Strategy/LCSP Activities: Demilitarize and Dispose of Systems IAW Legal and Regulatory Requirements, Particularly Environmental Considerations and Explosives Safety Guided by: Programmatic Environment, Safety, and Occupational Health Evaluation (PESHE) New terms/requirements in bold blue italics