Answers/considerations to the questions raised on the last ASSRC meeting on Sept. 24, 2013 The following is my summary from emails, private communication.

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

Particle rate in M1 and M2 Muon Meeting
Mass spectroscopy. In a typical MS procedure:  1- a sample is loaded onto the MS instrument, and undergoes vaporization.  2- the components of the sample.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
Increasing Field Integral between Velo and TT S. Blusk Sept 02, 2009 SU Group Meeting.
BLM thresholds for MQW magnets V. Raginel, B. Auchmann, D. Wollmann BLM Threshold Working Group meeting, 24/02/2015.
GLAST LAT Project Test Beam Meeting, June 6, 2006 S. Funk 1/6 PS Positron Simulations Stefan Funk June 6, 2006.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
1 Stony Brook Update: A bit more on Negative Ions T.K. Hemmick for the Tent Crew.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
RHIC Experiment Shielding Working Group Status Report Minutes and presentations are kept at :
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Eva Barbara Holzer July 16, LHC MPP Eva Barbara Holzer for the BLM team LHC MPP CERN, July 17, 2010 Proposal on Threshold Corrections for RC Filters.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
PPAC Jonathan Olson University of Iowa HCAL November 11-13, 2004.
Heating and radiological
BEAM LOSS MONITORING SYSTEM
S. Roesler (on behalf of DGS-RP)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Beam-beam effects in eRHIC and MeRHIC
Little module (HeatLoadCalculator) available at:
Friday 15th June 01:11 Injection.
A dynamic beam window for ADS Fritz Caspers (CERN/ESI) and Alex C
BEAM LOSS MONITORING SYSTEM
Damage Levels V. Kain AB/Co
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
BLMs - Radmon – BSCs – BCMs for steering the beams in collision during the engineering run at 450 GeV Thijs Wijnands (TS/LEA), Richard Hall Wilton (TS/LEA),
Monday – Morning Fill 3265 stable beams since 1:31
Report on Beam Loss Monitors
JLEIC Main Parameters with Strong Electron Cooling
Some of the Points Raised During my JLAB Visit
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Answers/considerations to the questions raised on the last ASSRC meeting on Sept. 24, 2013 The following is my summary from s, private communication and some simulation & calculations (about moving roman pots to between DX & D0) Items arranged as in the order of the minutes … Dec. 6, 2013 Kin Yip / Liaison Physicist ES & F

Consider accident scenarios at the DX location due to DX magnet movement, inadvertent optics changes, or other machine anomalies that may steer beam onto the Roman Pot windows  Probably impossible to prove what’s impossible … A max. of ~ 10 bunches may hit the window (probably in multiple turns) in the weirdest scenario (but the calculation below doesn’t depend on this no.) Perform beam particle analysis for full beam intensity, and luminosity. Calculate stress yield due to temperature rise on window at full beam intensity and beam spot size.  Since the beam size at DX is significantly larger than in the past (between Q3 and Q4), the (peak) energy deposition on the roman pot window is much lower than before (by >an order or two of magnitudes)  No problem for the thermal/mechanical stress even we assume all possible proton beam (2.5  protons) dumped on a single spot of the window in one instant (See C. Pai’s report). Review NMC vs BLM operation or the use of both. Investigate electronic noise issues with NMCs to prevent inadvertent beam aborts. (Due prior to Run 15).  D. Gassner has agreed to connect the entire actual ground loop with the motor and the NMC in the coming run (without beam permit of course) and monitor/observe any noise during the coming run (2014). The experimental group probably has the greatest interest not to have this kind of noise. BLM has been considered more than once before but it doesn’t seem to be as fast as NMC.

Estimate the time to remove beam from the machine when a NMC trips to determine if the time delay is adequate for machine protection.  J. W. Glenn has given some detailed consideration and written (eg.) in the ASSRC Note of We’ve been using this NMC system for a few times/years since then and it’s proven to be sensitive/robust. Estimate operational down time and effect to RHIC vacuum, if a vacuum loss occurs in the Roman Pot.  M. Mapes: The downtime could be one week which includes a chamber repair and some time for a bake. Determine effect upon Be beam pipe in STAR with a catastrophic vacuum loss in the Roman Pot.  M. Mapes: The Be pipe would have no impact from a catastrophic leak since the pressure would essentially be equaled to one atmosphere. Review/ update Operation Procedure OPM (TPL 09-09) for PP2PP operations. (P. Ingrassia, due prior to Run 15).  Will be done in due course

NMC response time ~ 6 ms (Woody’s “Background” in ASSRC Note of ). Beam size used in simulation: 2009 :  x = cm;  y = cm; Now :  x =  y = 0.28 cm (assuming 15  in emittance ) at 100 GeV  x =  y = cm (assuming 15  in emittance ) at 255 GeV