Dominion Virginia Power System Protection Human Performance Work Zone Kit Mike Carden * 804-257-4738 *Used with permission for WECC purposes.

Slides:



Advertisements
Similar presentations
Electrical Installation-Module 3
Advertisements

New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Basic Electricity.
Create physical barriers (banners and hangers) that direct you to the correct equipment and/or components and away from high risk equipment. Create physical.
An Overview of System & Appliance Testing A2Z On-Demand Training.
AWARENESS PROGRAM ON METER & HOUSE WIRING
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
Take 5 for Safety E. Lessard May 5, LANL Electrical Accident May 3, 2015  LOS ALAMOS, N.M. —Los Alamos National Laboratory workers were injured.
DUCK RIVER EMC Lockout/Tagout Procedures For Overhead and Underground Line Work (De-energizing Lines and Equipment for Employee Protection)
EET Survey of Electronics
Module 4: Overhead and Underground Power Lines. Overview of Module 4 Background on power lines Hazards of overhead and underground power lines Injury.
Controlling Hazardous Energy
Electrical Power Systems
Residential Wiring Facts
The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.
Transmission & Distribution
©2004 Fluke Corporation Insulation Resistance Testing 1 Insulation Resistance Testing.
Figure 1: The GT-1000 Solar PV Technology Panel
Noadswood Science, 2012 Electrical Safety. Electricity Safety To be able identify safety features with electrical components Tuesday, August 11, 2015.
Chapter 7 SYSTEM PROTECTION
Lesson.5: Fuses and Safe Plugs
Circuit Protection n Types of Fused Protection How to pull them.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Electrical Safety Safety Training Series
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
14.4 CONDUCTION, INSULATION AND PROTECTION P
Job Hazard Analysis Proactive Planning to Prevent Incidents Also known as: Task Safety Analysis, Job Safety Analysis Pre-requisites: None Course Goals:
Agricultural Engineering Part 1 Obj. 6.02: Understand basic agricultural engineering principles and practices Images courtesy of Google Images.
Topic 7 - Electricity in the Home Transmission of Electricity Power Grid Transformers are used to change the amount of voltage with hardly any energy loss.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Proper Use of Extension Cords
Shop Safety 8.0 Demonstrate personal safety measures in the use of tools, equipment, materials, and fire prevention utilized in agricultural engineering.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
POWER HOUSE.
Experiences in Managing Settings Bryan J Gwyn National Grid USA.
Electrical Safety, Subpart K
Using HPI Tools in Tank Farm Work Control and Hazard Analysis Process U.S. Department of Energy Enhancing Integrated Safety Management through Event Prevention.
Core Drilling into an Energized 13.2 kv Manhole Near Miss Los Alamos National Laboratory, TA-55 Plutonium Facility Presented by Dan Carter, Facility Representative.
What makes substation work?
A. Shop Safety Awareness and Principles for Safety.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Working On or Near Energized Conductors and FR Clothing.
Mitsubishi I-MiEV Isolation Procedure.
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Power System Protective Relaying-Part One
Hazardous Energy Isolation (LOTO) Awareness Plus
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
Agricultural Science Career Development Event Electric Power
Dominion Virginia Power System Protection
Work Zone Kit Material List
Receptacle Housings for M-Style Infinite Switches
Hazard Identification and Control
A. Shop Safety Awareness and Principles for Safety
Starter Review your filament lamp experiment and make corrections (in green pen) Review your test and complete the front cover sheet, correct any mistakes.
Chapter 7 System Protection
FIGURE 1-1 Safety glasses should be worn at all times when working on or around any vehicle or servicing any component.
Domestic Electricity AIM: To understand the use of domestic electricity and safety features such as fuses, circuit breakers and the earth circuit
TxMAG presentation
Dominion Virginia Power System Protection
Work Zone Kit Material List
Electrical components and systems
Wiring Circuits Lesson Plan PSTS: C6-7.
Electrical components and systems
Its strengths, your benefits
Presentation transcript:

Dominion Virginia Power System Protection Human Performance Work Zone Kit Mike Carden * *Used with permission for WECC purposes

Overview o Responsible for construction, commissioning and maintenance of relay protection, metering and data acquisition for Transmission - Distribution Substations (800) and Generation (37) facilities. o Dominion has 120 System Protection Technicians positioned in 3 states. Typically a 2 year technical degree, electricity/electronics or instrumentation. o 50% of our technician work force has < 3 years experience. We have also doubled the number of “contract” electricians working our system ( ). o Our Human Performance Program and Training is focused on eliminating the human errors that cause inadvertent outages to the T&D power grid. Dominion Virginia Power – System Protection

Human Errors Tracked By Event Since January 2008

Electric Transmission Work Zone Identification Kit Designed to Aid in Eliminating Inadvertent Equipment Operations from Wiring Errors, Jumpering Incorrect Points, Accessing Incorrect Panel/Device, etc.

o When working on equipment or components that look similar. o When working on equipment or components that will be manipulated multiple times. o When working on or near trip sensitive or risk important equipment. Our Expectation: Use the Work Zone Identification Kit

Work Zone Identification Kit Insert (front)

Work Zone Identification Kit Insert (back)

Use Work Zone Identification Kit Banners o To create physical barriers (banners and hangers) to direct the worker to the correct equipment and components and away from high risk equipment. o Text on banners used as reminder of our human performance tools and terminology.

Use Work Zone Identification Signage and Flagging o When working on equipment that is out of service for testing and the equipment requires signage or flagging for operational and/or safety reasons. Alerts others on the job that testing is in progress. o Use flagging hangers when working on equipment or components that will be manipulated for operational testing or placed into an abnormal condition during testing period (i.e. scada control switch, breaker control switch, device power on/off switch). Red- Do Not Operate Green-Equipment Under Test Yellow-Abnormal Condition

o Wire caps will be used to provide an insulated cover up for wires and lugs during transitional periods such as construction jobs. o Wire caps are color coded: o Red caps for new wiring that is to be terminated in the future. o Green caps for wiring that is being removed. o Yellow caps for temporary conditions. o Wire caps are sized to provide a secure fit (sock like) for multiple sized wires and lugs. Wire Caps Instead of Tape

o Terminal point barriers used to cover up trip sensitive points on wiring blocks and provides a visual indication of the location of those “trip” points. o Before the task begins, cover any “trip” point that would result in an unwanted event if inadvertently touched or bridged. Terminal Point Barriers

Without Terminal Point BarriersWith Terminal Point Barriers Terminal Point Barriers “T” wire “P” wire “T” wire P = Positive DC VoltageT = Trip Point

o Flame retardant plastic used to build a physical barrier to prevent incidental contact with “live” electrical control components (use when pulling control cable, stripping wire, etc) o The plastic is held in place with nylon blanket clamps. Plastic Sheeting as Barrier

Events vs. Decline in Experience and Increase In Workload

o Technicians and Electricians work together to identify the task risks during pre-job briefing and task preview. o Once risks are identified, use the work zone identification kit tools to build appropriate barriers and defenses to prevent unwanted equipment operation. Contact: The Expectation/Requirement