An insertion burn at local noon has the advantage that the spacecraft is kicked into a 11 resonant orbit, with an inexpensive recovery manoeuvre, if the.

Slides:



Advertisements
Similar presentations
AOGS Singapore June 2005 Paper ID: 58-PS-A0321 BepiColombo – Mission to Mercury Mission Overview Rita Schulz Johannes.
Advertisements

The ballistic support of the “SPECTR-RG” spacecraft flight to the L2 point of the Sun-Earth system I.S. Ilin, G.S. Zaslavskiy, S.M. Lavrenov, V.V. Sazonov,
The BepiColombo Mission
Институт прикладной математики им. М.В.Келдыша РАН Keldysh Institute of Applied Mathematics, Russian Academy of Sciences.
Synergistic Approach of Asteroid Exploitation and Planetary Protection From Threat to Action 9-12 May 2011 Joan-Pau.
Line Efficiency     Percentage Month Today’s Date
BepiColombo: The Italian Scientific Participation Enrico Flamini – Workshop ASI 2008.
Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
GN/MAE1551 Orbital Mechanics Overview 3 MAE 155 G. Nacouzi.
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
Unmanned Space Programs. What is the difference? Artificial Earth Satellite  A space vehicle built to orbit the earth and perform a specific function.
SNAP Spacecraft Orbit Design Stanford University Matthew Peet.
A.Space Probes- a vehicle that carries scientific instruments to planets or other bodies in space. 1) The soviets were first to launch a probe.
An active Seismic experiment on Bepi-Colombo Lognonné, P, Garcia. R (IPGP, France) P.; Gudkova, T.(IPE, Russia) ; Giardini, D., Lombardi D. (ETHZ, Switzerland);
Two Interesting (to me!) Topics Neither topic is in Goldstein. Taken from the undergraduate text by Marion & Thornton. Topic 1: Orbital or Space Dynamics.
BepiColombo – Mission to Mercury MPO Payload Updates Mission &
IPPW-9, Toulouse 2012A. Sánchez Hernández, UPC D YNAMICAL STUDY OF THE AEROBRAKING TECHNIQUE IN THE ATMOSPHERE OF M ARS Alberto Sánchez Hernández ETSEIAT.
Ch 22: Exploring Space. “Imagination is more important than knowledge” -Albert Einstein.
Learn more about the Super Moon phenomenon. Watch this YouTube video.
The Solar System Advanced Space Academy U.S. Space & Rocket Center.
Spacecraft Trajectories You Can Get There from Here! John F Santarius Lecture 9 Resources from Space NEEP 533/ Geology 533 / Astronomy 533 / EMA 601 University.
Main characteristics: systematic global search algorithm of quasi-ballistic trajectories; Gravity assist (GA) and Aerogravity assist (AGA) manoeuvres;
Planets Distances and Scientific Notation
Team 5 Moscow State University Department of Mechanics and Mathematics I.S. Grigoriev, M.P. Zapletin 3rd Global.
Our Solar System Christopher Fierbaugh Davis 3,032 miles at It’s equator. 1rst planet from the sun Rock Inner Does not have life do of lack of oxygen.
JAXA’s Exploration of the Solar System Beyond the Moon and Mars.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #21 Gateway To Space ASEN 1400 / ASTR 2500 Class #21 T-25.
8. Gravity 1.Toward a Law of Gravity 2. Universal Gravitation 3. Orbital Motion 4. Gravitational Energy 5. The Gravitational Field.
Mercury Observations with MESSENGER Images By: Frank J Melillo.
© 2006 Plano ISD, Plano, TX Explorer 1 Launch Date: Jan. 31, 1958 Arrival Date: Jan. 31, 1958 End of mission: Feb. 28, 1958 First U.S. spacecraft. It was.
FAST LOW THRUST TRAJECTORIES FOR THE EXPLORATION OF THE SOLAR SYSTEM
Low Thrust Transfer to Sun-Earth L 1 and L 2 Points with a Constraint on the Thrust Direction LIBRATION POINT ORBITS AND APPLICATIONS Parador d'Aiguablava,
Victor Becerra Cybernetics The University of Reading, UK
AAE450 Spring 2009 Low Thrust Spiral Transfer Maneuvers and Analysis [Andrew Damon] [Mission Ops] February 5,
ASEN 5050 SPACEFLIGHT DYNAMICS Three-Body Orbits Prof. Jeffrey S. Parker University of Colorado – Boulder Lecture 24: General Perturbations 1.
Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data.
Sea Launch/Zenit Thrust: 8,180,000 N Fueled Weight: 450,000 kg Payload to LEO: 13,740 kg Cost per launch: $100,000,000 Cost per kg: $7,300 Launches: 31/28.
Page 1 BepiColombo MMO Status Update For HEWG2014, June 2014.
University of Colorado Boulder ASEN 6008 Interplanetary Mission Design Spring 2015 Kate Davis Tisserand Plots 1.
Bit of Administration …. Lab 2Lab 2 –New observation dates: March 22 - April 5 No need to duplicate observations in hand!No need to duplicate observations.
ASEN 5050 SPACEFLIGHT DYNAMICS Interplanetary Prof. Jeffrey S. Parker University of Colorado – Boulder Lecture 29: Interplanetary 1.
Orbital Mechanics Ted Spitzmiller.
Asteroid OSIRIS REX Future Launch 2016 Strofio Instrument Mercury Orbiter Future Launch 2014 Mercury 2020.
Mission Development: Putting It All Together ASEN 6008 Interplanetary Mission Design.
Axis: imaginary line that passes through Earth’s center and the North & South Poles Earth’s axis tilt = 23.5° causes Earth’s seasons causes ‘length’ of.
Slide 1 16 March th ICATT Extended Tisserand graph and multiple lunar swing-by design with Sun perturbation Daniel García Yárnoz,
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
By: Tiffany Pecorella Mercury is the first planet from the sun and looks a lot like Earth’s moon.
Newton’s thought experiment: orbital velocity. Surface escape velocities Planet V escape, ft/sec Mercury13,600 Venus33,600 Earth36,700 Moon7,800 Mars16,700.
Look Angle Determination
BepiColombo Mission This mission will explore Mercury
Jan 2016 Solar Lunar Data.
Lunar Trajectories.
Perijove 2: engine issues
Future In-Space Operations (FISO) Telecon Colloquium
MOM Mars Orbiter Mission ISRO
LRO Mission Baseline Ephemeris v10.0
Analyzing patterns in the phenomena
Planetary Protection Category II
Transit Orbits Kassandra De Voto
Sun – Earth System Questions

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
ARTEMIS: Lunar Orbit Geometry
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
The Martian: Hermes Spacecraft Trajectories
[Kara Akgulian] [Mission Ops]

Presentation transcript:

An insertion burn at local noon has the advantage that the spacecraft is kicked into a 11 resonant orbit, with an inexpensive recovery manoeuvre, if the insertion burn fails. However this was disregarded for thermal reason. HYPERBOLIC APPROACH BepiColombo is the ESA cornerstone mission to Mercury. The launch of the spaceprobe is foreseen for the year The two elements of BepiColombo, a planetary orbiter (MPO) and a magnetospheric orbiter (MMO), will reach their final destination in late In its long interplanetary trip, BepiColombo will exploit low-thrust arcs provided by the Solar Electric Propulsion Module (SEPM), as well as swingbys at the Moon, Earth, Venus (twice), and Mercury (twice). THE BEPICOLOMBO MISSION TO MERCURY A DVANCED T OPICS IN A STRODYNAMICS Barcelona, July 5-10, 2004 USE OF GRAVITATIONAL CAPTURE FOR THE BEPICOLOMBO MISSION TO MERCURY Stefano Campagnola, Rüdiger Jehn Mission Analysis Office ESA/ESOC, Darmstadt, Germany GRAVITATIONAL CAPTURE The use of the gravitational capture is now considered. Performing extended low-thrust arcs until some 30 days before arrival, the spacecraft will attain very low relative velocity with respect to Mercury, and will orbit temporarily around it before escaping again as a result of the Sun perturbation. Two interesting cases are presented here. More results and further analysis will soon be published. Launch Date 3 May 2012 Lunar Flyby Date 23 Jul 2012 Arrival Date 26 Nov 2016 SEP consumption 6.46 (7.65*) km/s CH consumption (0.398*) km/s Maximum Thrust (SEPM) 400 mN Cruise Time 4.35 years (1589 d) Initially the optimum trajectory was determined for a hyperbolic approach. However a failure of the chemical insertion burn would result in a failure of the mission, as the inadvertent flyby would send the spacecraft away from Mercury. Tab 2 : Summary of the hyperbolic approach * including navigation, margin, corrections for non-nominal arrival conditions At arrival to Mercury, a chemical insertion manoeuvre will be performed to insert the two elements into the MMO target orbit (400x12000 km), from where MPO will eventually be inserted into its target orbit (400x1500 km) f MERCURY at arrival 60°<f ME <120°, 240°<f ME <300° i MMO / MPO 90 ° MMO / MPO 0°0°0°0° h periherm MMO / MPO 400 km h apoherm MMO km h apoherm MPO 1500 km MMO 178 ° MPO 196 ° Tab 1 : Target orbits for MMO and MPO Fig 3 : Hyperbolic approach and target orbits Fig 2 : Definition of the angle Giuseppe “Bepi” Colombo Fig 4 : Incoming and recovery trajectories for case A in a Mercury equatorial reference frame (upper left and lower right) and in a rotating reference frame (lower left) CASE A (left) Nominal Arrival Date: 5 Jan 2017 MJD Arrival osculating orbit: 400x km CASE B (right) Nominal Arrival Date: 5 Jan 2017 MJD Arrival osculating orbit: 400x km Fig 5 : Incoming and recovery trajectories for case B in a Mercury equatorial reference frame (upper right and lower left) and in a rotating reference frame (lower right) To the Sun 1 st V Rec (~1 m/s) 2 nd V Rec (~40 m/s) To the Sun 1 st V Rec (~1 m/s) 2 nd V Rec (~3 m/s) 3 rd V Rec (~5 m/s) Fig 1 : BepiColombo Interplanetary trajectory with the swingby dates (1) Moon 23 Jul 2012 (2) Earth 1 Nov 2013 (3) Venus1 27 Mar 2014 (4) Venus2 7 Nov 2014 (5) Mercury1 28 Jun 2016 (6) Mercury2 7 Aug 2016 Arrival 26 Nov 2016