M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan
M2: Team Paradigm Team Paradigm
M2: Team Paradigm Project Status , Integrated Circuits Design Project Design Proposal (Done) Architecture Proposal (Done) Gate level Design(Done) Component Layout (DRC & LVS): DONE basic components: 100% functional blocks: 100% Component Simulation: DONE basic components: 100% functional blocks: 100% To be done: Chip Layout Spice Simulation of Entire Chip
M2: Team Paradigm Overall Floorplan
M2: Team Paradigm Floor plan Proposal rom shift reg reg 4bit 16x1 mux Add rom shift reg Add 4bit 16x1 mux 16bit 4x1 mux reg Add reg Add 16bit 4x1 mux ctrl 500u 200u
M2: Team Paradigm
Critical Path 8 Clock Cycles original 4 clock cycles now for Registers Flow through large mux
M2: Team Paradigm LVS'ed Components & Spice Simulations Register
M2: Team Paradigm
LVS'ed Components & Spice Simulations Adder
M2: Team Paradigm
LVS'ed Components & Spice Simulations Subtractor
M2: Team Paradigm
LVS'ed Components & Spice Simulations ROM
M2: Team Paradigm Old Rom Layout
M2: Team Paradigm Old Hspice Results
M2: Team Paradigm New Layout of Rom
M2: Team Paradigm New Hspice Results
M2: Team Paradigm LVS'ed Components & Spice Simulations SRAM
M2: Team Paradigm SRAM LAYOUT
M2: Team Paradigm
::conclusion & questions