UNC Urgent Modification Proposal 0275 Timeline.  Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from.

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (AQ topic)
Advertisements

Third Energy Package for Change of Supplier 2009/73/EC.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Nexus Workgroup Transition Approach Update 8 th January 2014.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
The AQ Operational Review Group ‘Mid-process’ Forum Via teleconference 4 th September 2014 “Whilst every effort is made to ensure the technical accuracy.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
1 “Data Enquiry Service” Update 5 December 2011 (by )
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Susan Harwood Training Grant Program FY 2015 Proposal Webinar:Grants.gov.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
ROM and DCA. Scene setting Our house Our aspiration for our house Our project manager Us.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Références, date, lieu Xoserve Service Model – Shipper’s View Total Gas and Power Ltd Gaz de France ESS.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
SoS Report PAC – 13th December 2016.
Transmission Workstream 6 January 2011
Consideration of issues raised by UNC Modification Proposal 0244
Capacity Conversion – 616s
Distribution Workgroup 24/11/16
Mod_06_12 Improved Efficiencies in LCF Process 31 January 2012
UNC Modification – Non Effective Days
Reduction of Exit Capacity at DM Supply Points
Project Nexus Workgroup
Consideration of issues raised by UNC Modification Proposal 0244
DSC ChMC CSS update 11th December 2018
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
Long Term Non Firm Capacity Update
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Consideration of issues raised by UNC Modification Proposal 0244
UK Link Replacement Programme additional supporting UNC modifications
SPA Processes for DM Sites
Impact of SOQ Reduction
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Lessons Learnt UKLC - November 2015
Optimisation of Entry Capacity Modification Proposal
AQ BTU Form – Process & Timeline 29th September 2009
DN Interruption Phase II
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Further Considerations
Presentation transcript:

UNC Urgent Modification Proposal 0275 Timeline

 Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from end consumer via fax or as early in the day as possible (AM, specifically prior to midday)  Loads requested should follow existing SOQ / SHQ ratio rules otherwise request will be rejected  Appeal is raised by xoserve and appeal reference number is sent back to User via Conquest  User nominates submits a Supply Point Nomination with the appeal reference number via IX  No further changes to the Supply Point should be nominated at this time  Day 2  Based on the appeal reference number a Supply Point Offer is generated by xoserve and submitted back to the User via IX  User validates the Supply Point Offer and submits a Supply Point Confirmation via IX  Day 3 to Day 10  Supply Point Confirmation is processed.  Day 11  Effective Date of Supply Point Confirmation. New SOQ, SHQ and BSSOQ values are live on Day 11.  NOTE: Submissions within the Capacity Reduction Period that do not allow sufficient time for the full process to be completed will be rejected. Modification Proposal 0275 – Load Reduction Process & Timeline All days are business days and the timeline is based on best endeavours basis

1. User raises APP Query via Conquest with requested loads (BSSOQ, SOQ, SHQ*) and provides signed letter of consent / warrant to xoserve (via fax or ) 2. xoserve receives letter of consent and APP Query – xoserve process Appeal request via Conquest * 3. xoserve send Appeal reference to User via Conquest 4. User submits Supply Point Nomination with Appeal reference via IX 5. xoserve receives Supply Point Nomination and issues Supply Point Offer via IX (time required for system processing) 6. User receives Supply Point Offer with appealed load values and submits Supply Point Confirmation via IX 7. Effective Date for new BSSOQ, SOQ and SHQ * SOQ has to be between 4 and 24 times the SHQ (TPD G5.4.1). If not – rejection will occur 6. System processes Supply Point Confirmation Day 3 to Day 10 DAY 1 DAY 2 Modification Proposal 0275 – Load Reduction Process & Timeline All days are business days and the timeline is based on best endeavours basis Day 11

 For Appeals submitted on 21 st December 2009  Time for submission should be as early in the day as possible to ensure these timescales are adhered to  New Load values live from 8 th January 2010*  For Appeals submitted on 5 th January 2010  Time for submission should be as early in the day as possible to ensure these timescales are adhered to  New Load values live from 19 th January 2010  For changes to be effective by 29 th January 2010 (last business day of Capacity Reduction Window)  Appeal should be submitted by 15 th January 2010 * NOTE – The following days are not classed as Business Days pursuant to UNC TPD G th December 2009, 28 th December 2009, 1 st January 2010 and 4 th January 2010 Modification Proposal 0275 – Load Reduction Timeline – Example Dates