Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.

Slides:



Advertisements
Similar presentations
CapX 2020 Transmission Expansion Plan Realizing the CAPX2020 Vision South Dakota Energy Infrastructure Authority June 9, 2006 Terry Wolf, Missouri River.
Advertisements

AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
South Dakota Energy Infrastructure Authority (SDEIA) Inaugural Meeting of State Infrastructure Authorities Rapid City, SD June 13, 2007.
14 th Annual International Legislators Forum EPA Carbon Regulation June 26, 2014 Eric J. Olsen Vice President and General Counsel Great River Energy.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
EirGrid Customer Conference 2009 October 13, 2009 Dublin, Ireland Session 2: Key Industry Challenges “If you love wind, you have to at least like transmission”
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
South Dakota Energy Infrastructure Authority (SDEIA) Legislative Energy Briefing Pierre, SD January 11, 2007.
Dale Osborn ISU Tour MISO July 18, Oversee the flow of power over the high voltage wholesale transmission system in all or part of 13.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Highway-Byway Cost Allocation: What it Offers MISO January 2010 Presented to the Organization of MISO States CARP and the Midwest ISO RECB Task Force Meeting.
Infrastructure, Regulators and Utilities in the World of RTOs and Electricity Markets Steve Gaw, Commissioner, Missouri Public Service Commission President.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
State of the Wind Industry Denise Bode CEO American Wind Energy Association.
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
The Transmission Imperative November 3, 2011 Jay Caspary.
EnergyForward Fleet Transition 2014 AAPT Summer Meeting July 28, 2014 Minnesota Power David J. McMillan, Executive Vice President.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Howard Learner Executive Director, Environmental Law & Policy Center ABA Webinar on Renewable Energy: Legal Challenges & Solutions for the Green Economy.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
CapX 2020 Transmission Initiative Progress Through An Alliance Approach American Public Power Association E & O Technical Conference Atlanta, Georgia April.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Updated 1/28/2011.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
What do we mean by “Energy?
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
50 + Years of Manufacturing Excellence!Since Years of Manufacturing Excellence!Since 1959 Energy Efficiency & Conservation Presentation during.
Grid Modernization in Minnesota Presentation for More Than Smart Webinar Chris Villarreal Minnesota Public Utilities Commission August 4,
IWWG Annual Conference Wind Management at MISO July 22, 2011.
1 Our Blueprint for the Future Gary Stockbridge President, Delmarva Power Region.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
National Energy Technology Laboratory Driving Innovation ♦ Delivering Results Steve Bossart, Moderator October, 2015 USAEE Pittsburgh North American Conference.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
1.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Energy and Environmental Policy Renewable Energy: Wind Presented by: Adam Smith Damien Hammond Veera Kondapi Jeff Gruppo.
TransmissionHub Quarterly Market Update June 8, 2015 Kent Knutson, Director Hub Services, PennWell Corporation Sponsored by.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Beth Soholt Director Wisconsin Public Utility Institute Wind Energy – Prospects for Growth in Wisconsin Madison, WI February 27, 2008 Wind Power Expansion:
Kansas Renewable Energy & Energy Efficiency ’05 Conference
Beth Soholt Director Wind on the Wires
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober 21, 2010 Removing Policy Barriers to Transmission for Renewable Energy Beth Soholt Wind on the Wires

Background on Wind on the Wires Non-profit Advocacy Organization launched in 2001 to overcome the barriers to bringing wind energy to market in the Midwest. Members include non-profit environmental organizations, tribal representatives, farm groups, wind developers and manufacturers, American Wind Energy Association, businesses that provide goods and services to the wind industry. Work in 3 areas: – Technical – work with electric utilities and Midwest Independent System Operator (MISO – regional “grid” operator) on transmission planning for wind, market and operational rules that treat wind fairly – Regulatory – actively participate in cases where states are approving new transmission lines that will deliver wind energy – Policy education/outreach/advocacy – work with governors, state regulators, legislators, local elected officials, regional groups, colleague organizations, general public on wind and transmission issues Support – Foundation grants and member contributions

Wind on the Wires Footprint

Regional Transmission Organizations 4 Source: FERC

MISO State RES Requirements ( May 2009) 5 MISO existing wind: ~8,000 MW MISO State RESs: ~25,000 MW MISO-wide 20% wind: ~50,000 MW MGA 30% by 2030: ,000 MW

On-Going Challenges for Wind Power and Transmission Transmission planning process needs to properly accommodate public policy goals and move timely through the regulatory process Cost allocation – how to pay for new transmission. Cost for large, regionally beneficial transmission facilities needs to be broadly allocated Fair Market and operational “rules of the road” – must realize and recognize unique characteristics of variable resources like wind power Wind Integration issues – these issues show up in transmission planning, the energy market and operations Siting/routing new transmission lines

Transmission to Support a Clean Energy Future Transmission Expansion CapX 2020 Initiative MISO Regional Generation Outlet Study (RGOS) MISO Candidate Multi-Value Projects (MVP)

CapX 2020 Initiative CapX 2020 Initiative undertaken by Minnesota utilities Transmission planning done for a number of “future” scenarios out to 2020 – Minnesota generation build out – Generation from west (North and South Dakota) – Generation from east markets Lines moved forward that were common to all futures kV lines – Fargo-St. Cloud, Brookings to Twin Cities, SE MN line Regulatory proceedings: – Certificate of Need, including Environmental Report – Siting/Routing All lines have received CON; 2 lines have received Site/Route permit; currently in Siting/Routing for SE MN line Segments will be placed into service between

Regional Generation Outlet Study (RGOS) Developed transmission portfolios needed to implement Renewable Portfolio Standards or goals at the least cost for consumers while continuing to reliably serve load. RGOS summary: –Renewable energy: ~ 40 GW of total wind (~28.5 GW new & ~11 GW ‘existing’) –Iterative development of transmission plans; options include 345 kV, 765 kV, and HVDC; analysis included power flow, production cost models (PROMOD), and business case / value metrics –The three transmission overlay plans represent potential investment of $16B to $22B (2010 dollars) over the next 20 years and consist of new transmission mileage of 6,400 miles to 8,000 miles –RGOS identified a set of Starter Projects considered viable for near term development; The estimated cost for this starter set is approximately $5.8 Billion (2010 dollars), $4.4 billion of which is within the Midwest ISO borders

11 RGOS Identified Starter Projects Source: Midwest ISO 8/20/10 Draft MTEP $5.8 B ($4.4 B in MISO)

RGOS Identified Starter Projects 1.Big Stone to Brookings 345 kV line (2010 estimated installed cost: $150M). 2.Brookings to Twin Cities 345 kV line (2010 estimated installed cost: $700M). 3.Lakefield Junction to Mitchell County 345 kV line constructed at 765 kV specifications (2010 estimated installed cost: $600M). 4.North LaCrosse to North Madison to Cardinal, Dubuque to Spring Green to Cardinal 345 kV lines (2010 estimated installed cost: $811M). 5.Sheldon to Webster to Hazleton 345 kV line (2010 estimated installed cost: $458M). 6.Ottumwa to Adair to Thomas Hill, Adair to Palmyra 345 kV lines (2010 estimated installed cost: $295M). 7.Palmyra to Meredosia to Pawnee, Ipava to Meredosia 345 kV lines (2010 estimated installed cost: $345M). 8.Sullivan to Meadow Lake to Greentown to Blue Creek 765 kV line (2010 estimated installed cost: $908M). 9.Collins to Kewanee to Pontiac to Meadow Lake 765 kV line (2010 estimated installed cost: $964M). 10.Michigan Thumb 345 kV transmission loop (2010 estimated installed cost: $510M). 11.Davis Besse to Beaver 345 kV line (2010 estimated installed cost: $71M).