Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012.

Slides:



Advertisements
Similar presentations
PDA Sectoral / Agriculture Closing plenary 20 TH UN/CEFACT F ORUM S EPTEMBER 2012 V IENNA 20 TH UN/CEFACT F ORUM S EPTEMBER 2012 V IENNA.
Advertisements

1 Integration Made Easy Agile Integration: Connecting Salesforce With Your Enterprise.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Standards, models and conceptual approach Per Øyvind Berg-Knutsen
Syntax, Communication and Message Standard Nordic Ediel Group NBS info day, April 29 th 2014 Nordic Balancing System Syntax, Communication.
Introduction to Management Information Systems Chapter 8 E-Commerce and Supply Chain Management HTM 304 Fall 07.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Designing Electronic Messages UNESCAP / ECO TF Workshop SIPS : Supplychain Information Platform Study group General Secretariat : Hisanao Sugsamata
NordREG Hearing Gardemoen, April 8 th, 2015 Fortum Markets’ view on the “market design” for energy services, as a supplier/service provider - Louisa Ramert,
UN/CEFACT recent activity Briefing about progress in 22nd Forum Mitsuru Ishigaki UN/CEFACT Rapporteur for Asia and the Pacific ( AFACT Plenary 2013 )
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT The UN/CEFACT Vision.
Supplier Switching in Electricity and Gas Markets Patricia de Suzzoni Chair of ERGEG Customer Focus Group.
PDA Sectoral / Agriculture VC Bruno PREPIN DC Frans VAN DIEPEN 19 TH UN/CEFACT F ORUM A PRIL 2012 P ALAIS DES N ATIONS, G ENEVA 19 TH UN/CEFACT F.
Introduction to ebXML Mike Rawlins ebXML Requirements Team Project Leader.
Proposal for a Revised Technical Framework for UN/CEFACT 1.
TMG Report to the Plenary UN/CEFACT TMG Report Chair: Gunther Stuhec Vice Chair: Christian Huemer.
1 CIM User Group Conference Call december 8th 2005 Using UN/CEFACT Core Component methodology for EIC/TC 57 works and CIM Jean-Luc SANSON Electrical Network.
EbXML Overview Dick Raman CEO - TIE Holding NV Chairman CEN/ISSS eBES Vice Chair EEMA and HoD in UN/CEFACT Former ebXML Steering Group.
1 Vattenfall Sveanät AB Deregulation for domestic customers in Sweden “Organizational consequences for network companies in Sweden and the consequences.
14 May th UN/CEFACT Plenary1 Applied Technologies Group Chair Mark Crawford Vice Chairs Gait Boxman Jostein Frømyr
1 SBDH 3.0 Project Session SBDH 3.0 Project leader Shingo Sakaguchi Oslo, Norway June 2010.
Copyright © Open Applications Group, Inc. All rights reserved 1 Copyright 1995 – 2008 Open Applications Group, Inc. All rights reserved Copyright.
Kuala Lumpur February 2006 UNECE/CEFACT Capacity Building Workshop International Standards to Stimulate Paperless Trade UNeDocs – Interoperability, Reusability.
UN Economic Commission for Europe Embracing new technologies (or not)? Geneva, Switzerland – 17 February st UN/CEFACT Plenary.
Developing a common set of federal NDR’s Mark Crawford Draft April 28, 2005.
Proposal for a Revised Technical Framework for UN/CEFACT eProcurement impact 1.
February 2006UNeDocs Overview Michael Dill / GEFEG mbHSlide 1 What is this specific TBG2 project about? What is CEFACT TBG2 ‚ Digital Paper? What is the.
Name Title January, 2008 Overview of ebIX work Goals and results to date European forum for energy Business Information eXchange.
UN/CEFACT Common Methodologies Mark Crawford, SAP Mike Rowell, Oracle Philipp Liegl, TUWIEN.
Discussion of UPCC comments UN/CEFACT Forum Meeting Geneva, –
Unit Gas and Electricity European Commission - DG Energy and Transport Customer Focus Group Helsinki, CUSTOMER ISSUES Patrick ROUSSEAUX.
Metamodel Layer Model Layer Instance Layer CCTSXML Schema CCTS Model XML Schema Instance XML Instance XML Instance Metamodel Mapping Model Mapping Instance.
MODULE ? CUSTOMER CHOICE PROGRAM. The opportunity for a retail electric or natural gas customer to choose who supplies their electric or natural gas.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
ERGEG Customer Focus Group Karima Björk, Svensk Energi.
Oracle, OAGIS and Open Standards October 21-22, Walldorf, Germany Garret Minakawa, Director.
UN/CEFACT Technical Update AFACT TMC 16Jun2015 Tehran, Iran.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
UN Economic Commission for Europe 18 th UN/CEFACT PLENARY Methodology & Technology Programme Development Area Report Peter Amstutz & Tim McGrath UN/CEFACT.
UN/CEFACT TMG Closing Plenary  Dublin, IrelandSlide 1 UN/CEFACT TMG Closing Plenary Chair: Gunther Stuhec Vice Chair: Christian Huemer Secretary:
Business Informatics Group Institute of Software Technology and Interactive Systems Vienna University of Technology Favoritenstraße 9-11/188-3, 1040 Vienna,
Technical Track Update Mavis Cournane, Chair Hong Kong Plenary 14 May 2004.
11 April, 2008 Bernard Longhi / TBG6 / TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi.
TC 57 TC 57 UML/XML Workshop Report for CIM user Group Jun 2007 Netherlands (ARNHEM) EDF R&D.
Dictionary based interchanges for iSURF -An Interoperability Service Utility for Collaborative Supply Chain Planning across Multiple Domains David Webber.
UBL: Library Content subcommittee Tim McGrath, Chair San Francisco, USA 3 November 2003.
TC 57 CIM user Group Meeting June 2010 Milano 1 Technical Committee 57 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE.
An Overview of the Smart Metering Programme in GB.
TC 57 CIM user Group Meeting October 2010 San Francisco 1 Technical Committee 57 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
UN/CEFACT recent activity Briefing about progress in 22nd Forum Mitsuru Ishigaki UN/CEFACT Rapporteur for Asia and the Pacific ( AFACT Plenary 2013 )
UN Economic Commission for Europe Sectoral PDA Utilities Domain Domain Coordinator: Kees Sparreboom and Domain Coordinator: Kees Sparreboom and Shingo.
1 ERGEG Customer Focus Group Workshop October 11, 2005, Helsinki CEDEC Gert De Block Secretary General.
For Semantic Interoperability EDICOM 2012 AFACT TMC: Technology and Methodology Committee Hisanao Sugamata.
1 CCL Utilization in Asia AFACT TMC 14 December 2015 Tehran, Iran.
UN/CEFACT Mission Role of Architecture and Deliverables.
The Distributor Viewpoint to Supplier Switching Geode ERGEG Customer Focus Group Workshop October 11, 2005, Helsinki Pekka Salomaa.
Frankfurt (Germany), 6-9 June 2011 PAATERO – SE – S6 – Paper 0485 Adopting a general regulatory approach on the European electricity market Noona Paatero.
Synnogy fuel cells UK The UK Industry View FINANCING THE HYDROGEN REVOLUTION SYNNOGY LTD 1 Aldwincle Road, Thorpe Waterville, Northants, NN14 3ED T: 0044.
TBG1 - UBL Convergence Project Core Group Progress Report New Delhi - October 2006.
British Gas Customer Service For more info visit : Call today British gas customer services number Please contact.
1 CCL Utilization in Asia AFACT TMC 24 May 2016 Hamamatsu, Japan.
Elhub - Electricity data hub
Anticipating and Following Technological Trends
Group 2.3: e-Services Administration to Enterprise
IGG Agenda 29th June 2011 Minutes from Previous IGG Meeting
Regulation for Smart Grids
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
2.8 – Payroll applications
Presentation transcript:

Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX ® ebIX ® : European Forum for energy business Information eXchange European Energy Market: Electricity and Gas Focus on downstream part of the market: Customer Distribution System Operator (lower voltage grids) Supplier, Metering companies Master data and measured data Start: mid nineties in Nordic countries as Ediel organization, since 2002 as ebIX ® for Europe

ebIX ® work 1990’s: Start with Edifact Message Implementtaion Guides (MSCONS, DELFOR, PRODAT, …) : Development of UTILMD and UTILTS UNSM’s 2001: start modeling using UML Around 2005: first draft CC’s 2008-now: next step in modeling

ebIX ® modeling since 2008 UML-2 UMM-2 CCTS UPCC 3.0 NDR 3.0 OCL 2.0 Model Driven Architecture paradigm: model in UML + use of OCL and derive technology dependent elements from UML model Supported technologies: XML (schema’s based on NDR 3.0) Edifact (UTILMD and UTILTS, yet to be completed) Web services (yet to be developed)

ebIX ® model organization Organized along lines of responsibility: separate modules for different responsibilities moduleorganizationcontent UMM-2/UPCCUN/CEFACTMeta model information CefactUN/CEFACTCC’s and code & qualifier lists ebIX ® CC’s, code lists and additional meta model information Role modelebIX ®, EFET and ENTSO-E Responsibilities, domains and installations Business domainsVarious work groups and organizations High level >

Business Requirements Previous model version used as start for new Business Requirements Specification (BRS) Business work groups for re-defining BRS “Modeled” in UML Using UMM-2 recommendations for Business Requirements View Payload for information exchange specified for synchronous web services Optional additional information for a- synchronous and “optional” additions

ebIX ® BIE’s and BDT’s Previously: Information clusters acting as draft CC’s in previous model version as developed from 2005 onwards, have been used as initial guide for clustering new BIE’s Now: Real clustering based on defining objects and on normalization; where possible starting from available CC’s

Messages: header and context In previous model version use of SBDH version 1 In present UMM-2 model version still intention to use the finalised SBDH version 3.0, but ….. For the time being using own header specification We have defined an > for Context to be added to the > next to the SBDH in case of a-synchronous message exchange

Collected Data built from CC

Present ebIX ® header info Temporary ebIX ® header Context specification as expected to be required next to ebIX ® web service specification

ebIX ® business processes modeled yet Introduction to ebIX ® models Measure Collect Measure for Imbalance Settlement Measure for Labeling Measure for Reconciliation (only BRS, no BIM yet) Structure Change of Supplier

ebIX ® business processes still to do this year Measure for Reconciliation (complete BIM) Measure for Billing Measure Determine Switch Read Settle for Reconciliation Structure End of Supply Structure Notify MP master data Structure Change of Metered Data Responsible Structure Change of Balance Responsible Structure End of Metered Data Responsible Structure End of Balance Responsible Structure Change of Customer Structure Change of Meter Structure Notify Meter master data

contact