Hyacinth Bouchard, Fana Gidey, Tomlyn Graovac, Haim Solomon.

Slides:



Advertisements
Similar presentations
CONSTRAINT ANALYSIS OF HIGH DENSITY RESIDENTIAL AREA IN YORK REGION Bradley Morris, Ehsan Akbari, Johnny Nguyen, Nikou Najafi.
Advertisements

Justin Prokopick, Marijana Vidackovic, Zaid Kharouba, and Boris Gusev
Industrial Park By: Amanda Bates, Eaton Howitt, Trevor Rawson, and Nareesa Rahman.
 Much of Canada has a cold climate. Most Canadians (more than 75%) have settled where the temperatures are comfortable and natural resources are available.
GIS in Connecticut Education and Training Working Group.
Siting of Obnoxious Facilities in the City of Austin Jayanthi Rajamani Fall 2002 University of Texas at Austin.
Timber Harvest Planning Course Learning Objective: Be able to describe the harvest planning process including different levels (or types) of harvest plans,
GIS Level 2 MIT GIS Services
Lecture 3: Vector Data Analysis Jianfei Chen School of Geographical Sciences GuangZhou University GuangZhou, China
Chapter 9 The Urban World. Population and Urbanization Jobs define urban vs. rural, not populations.
GIS Decision Support Methods & Workflow Chapter.03 Dr. Ahmad Bin Touq GEO 440: GIS for Urban &
BASIC SPATIAL ANALYSIS TOOLS IN A GIS
Geographic Information System - ArcView University at Buffalo Summer Institute 2003 May 12, 2003.
©2005 Austin Troy Lecture 9: Introduction to GIS 1.Vector Geoprocessing Lecture by Austin Troy, University of Vermont.
GEOG440: GIS and Urban Planning Chapter 3. GIS Decision Support Methods and Workflow Dr. Ahmad BinTouq URL:
@ 2007 Austin Troy. Geoprocessing Introduction to GIS Geoprocessing is the processing of geographic information. – Creating new polygon features through.
@ 2007 Austin Troy. Geoprocessing Introduction to GIS Geoprocessing is the processing of geographic information. Perform spatial analysis and modeling.
Copyright © 2008 Pearson Education, Inc., publishing as Pearson Benjamin Cummings 13_00CO.JPG Ch. 13 Urbanization.
W ATER P ARKS Kevin Agyemfra Deanna Kishchuk Dan Blake Tony Lin.
Spatial Analysis (Vector I) Reading Assignment: Bolstad Chapter 9 (pp )
Pollution By: Alison Gonzalez.
GIS2: Geo-processing and Metadata Treg Christopher.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
GEO 441 MARCH 2012 KYLE J CHIU OLGA LUKASHEVA IVEON YVES NGOIE Constraint Analysis and Project Management for Golf Complexes.
Environmental Science Project. By: Ray Carlton III.
Sustainable Urban Drainage Systems by Robert Mackey Adapted from a presentation by Dr David Skidmore.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
PREPARATION OF PERSPECTIVE PLAN FOR
Environmental Issues Associated with Oil and Natural Gas Extraction, Transport and Processing in the Marcellus and Utica Shale Region of Ohio Joe Bonnell,
LAB 2: CONSTRAINT ANALYSIS & PROJECT DEVELOPMENT PROCESSES GEO441.
Point and Non-point pollution. 8.E.1 Understand the hydrosphere and the impact of humans on local systems and the effects of the hydrosphere on humans.
AS DEMONSTRATED THROUGH THE DERIVATION OF SITES APPROPRIATE FOR A WATERPARK SEAMUS MCDOUGALL IAN MCILRAVEY KEERTHIKA LOGENDRAN ANDREW THOMPSON Constraint.
FRANCISCA MUNOZ JENIKKA PREMANATHAN SIOBHAN DAWKINS Site Selection: Regional Mall.
District GIS for Tamilnadu GIS Nagapattinam GIS DIV.NIC,TNSC.
By: Josh T, Chujan P, Evelyn JJ. Constraints  -Wetlands (>120 m away)  -Forested (near, off)  -Highways (away)  -Roads (very quiet)  -Open Space.
Chair of Municipal hygiene and occupational health. Lecture on municipal hygiene for 5 courses Role and value of a street network in city planning.
URBAN DEVELOPMENT PLANNING
Problem Statement What is the habitat status of the endangered Bay Checkerspot Butterfly in the Bay Area?
01. Create Raster 02. Classify on scale of Combine Rasters 04. Compute Stats Create Map 01. Create Raster 02. Classify on scale of Combine.
Phosphorous Loading in the Blackstone Watershed Where does it come from And What can we do about it? Blackstone River User’s Conference September 18, 2012.
GIS & Health ESPM 9: W 5-8 April 7, 2010 Instructors: Maggi Kelly Kevin Koy Mark O’Connor Geospatial Innovation Facility College of Natural Resources -
1 Chapter 1: Introduction to the Environmental Science Introduction to the Environment Mr. Yim Mongtoeun Department of Environmental Science Royal University.
Pollution, Waste, Energy Efficiency. What is Pollution?? DEF: Any addition to air, water, soil or food that threatens the health, survival, or activities.
Unit 2 Study Guide Answer Key
Geoprocessing Geoprocessing is a fancy name for Spatial Operations So what is Geoprocessing? Processing or manipulating of geographic/spatial data to.
Conclusion BACKGROUND Since the basis of this analysis is not based on the skill of the offender, but rather, an inherent dependence on environmental and.
Environmental Benefits Benefit/Cost Transit Slides.
Sources and factors of man-induced environmental impacts: ► 1. Communications (railways, main motor roads oil and gas pipeline, power transmission lines,
Types of Maps. Political Map Designed to show governmental boundaries of countries, states, and countries, the location of major cities, and they usually.
MCE: Criteria Development and the Boolean Approach Exercise 2-7.
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
CENTENNIAL COLLEGE SCHOOL OF ENGINEERING & APPLIED SCIENCE VS 361 Introduction to GIS SPATIAL OPERATIONS COURSE NOTES 1.
1. Why is water important? Water shapes Earth’s surface and affects Earth’s weather and climates. Water needed for life. Living things are made up of.
Land Resources & Pollution ENVIRONMENTAL SCIENCE.
IS YOUR CAD MAP IN NEED OF A MAKEOVER? West Coast Users Group March 22, 2016, 1100 – 1145 Michael Rawls Genesis Map Works, LLC
International Airport Site Evaluation St. George, Utah TYREL EDWARDS - JOSH GATHRO - MATTHEW HALES - PLOY SAMRANJIT 25 APRIL 2016 CEE 5190 – GIS FOR CIVIL.
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air, Land and Water MAINE.
SE Point-source and non-point source water pollution
Lecture (2) :Health impact and environmental:
Vector Analysis Ming-Chun Lee.
Hydrosphere Notes Parts 4- Watersheds.
Presented by Shaynee Gulliford
Spatial Analysis and Functions
Geosphere Basics Chapters: 1.2, 14, 15.2.
What are External Influences?
Chapter 3. GIS Decision Support Methods and Workflow
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
GIS Lecture: Selection
GIS-based wind farm site selection using spatial multi-criteria analysis (SMCA): Evaluating the case for LA County The threat of global warming has caused.
Vector Geoprocessing.
Presentation transcript:

Hyacinth Bouchard, Fana Gidey, Tomlyn Graovac, Haim Solomon

-located in the cloverleaf intersection of highways 401 and 427 -exposed to all weather conditions -significant noise pollution -runoff, particulates and air pollution from surrounding roadways -unappealing visual aesthetics -not easily accessible What NOT to do…

 Wetlands, water courses and water bodies  Forested regions  Steep slopes  Major roadways  Densely urbanized area  Excessive noise  Excessive Pollution  Undesirable visual aesthetics

 Waterbodies, water courses, wet lands, and underground resevoirs buffer = 120 m  Slope extracted slope values between  Forested land non-buffered constraint

 Underground oil and natural gas pipelines buffer = 2 km  Public Health and Safety Services (EMS stations, police stations, hospitals, fire stations) buffer = 1.5 km  Airports buffer =1.5 km  Amusement parks/exhibition fair grounds buffer =1.5 km  GO railways buffer = 1.5 km o Water and solid dumpsites buffer = 1.5 km o Schools buffer = 500 m o Golf Courses buffer = 500m o Industrial land uses (transformers, auto wrecker sites (cut), lumber yard, mining areas, other industrial sites) buffer= 500 m

 Data export  Buffering  Dissolve  Union  Spatial join (one-to-many)  Erase

 In general the final decisions for choosing these three suitable cemetery locations were determined by their: 1. Parcel size: The bigger the Better 2. Proximity to the road network:They have to be accessible. 3. Proximity to various constraints and Externalities:

Physical constraints Attribute query Human constraints Municipal Boundary Water Bodies Public health and safety services Airports Amusement Parks/exhibition grounds Pipelines Forests Buffer Union Erased Spatial model Base mapGoogle maps Available sites Slope Data export Buffer Join Industrial land Golf courses Water and solid dumpsites Schools Attribute query Buffer