ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Engineering III Building 40,000 gsf Completed 2002 Designed and constructed in two.

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
BUILDING AIR CONDITIONING
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Heat Recovery for Commercial Buildings
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Digital Celeris Integrated System Patient Room Isolation Room Programmable Controllers Local Display & Command Unit.
Presenters: Bob Kilgore Matthew McReynolds Brenna Goode CHEMISTRY BUILDING RCX.
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
Siemens Building Technologies, Inc. ED&G 100 Design Project Fume Hood Face Velocity Control Spring 2004.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
DATA-BASED COMMISSIONING BUILDING-WIDE FUME HOOD FACE VELOCITY REDUCTION MIT Laboratory Energy Efficiency Case Studies.
NARAGHI HALL 3 rd FLOOR VENTILATION MANAGEMENT IMPROVEMENT BEST PRACTICE AWARD HVAC DESIGN/RETROFIT 2014 CALIFORNIA HIGHER EDUCATION SUSTAINABILITY CONFERENCE.
Chemistry Teaching Laboratory Fume Cupboard Refurbishment – University of Leeds Bob DouglassEnergy Officer.
Chemical Fume Hood  A type of local ventilation device that is designed to limit the user's exposure to hazardous or noxious fumes, vapors or dusts.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Objectives Finish with Multizone Systems
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Deep retrofits: You get what you pay for Leslie Kramer, Stanford University and Jonathan Schoenfeld, kW Engineering June 17, 2014.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
Important variables Water: Air: Conversion:
Green Building Demonstration Project Adam Saling City of San Diego.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Ductless Heat Pumps Ventilation Gary Nordeen Bill Kingrey, P.E. 11/5/08 AFE Webinar.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Name of Building(s) or Project Speaker(s) Organization(s)
International Newspaper Group 2008 Gannett’s Green Campaign.
Phoenix Convention Center Phoenix, Arizona District or Distributed Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc.
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
MECHANICAL ENGINEERING FOR SYSTEM BALANCE ASHRAE MEETING 2/15/2007 NORTHERN NEVADA CHAPTER 126 MATT BRENNAN, TBE.
Cleveland Clinic Abu Dhabi Sustainability Case Study Presented by Ted Jacob.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Energy Plus & Open Studio Class
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Sean Weber Energy Engineer
Sustainability Best Practices
Objectives Finish analysis of most common HVAC Systems
Objectives Talk about the final projects Discuss HW2 and HW3 problems
Session 10 –roundtable – Labs and Controls Systems
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Types of HVAC Technology Used in Business Establishments
HCB 3-Chap 19A: All-Air Systems_Single Zone
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY
ESCO Project 5 – Lab Building Upgrades
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Engineering III Building 40,000 gsf Completed 2002 Designed and constructed in two phases due to budget limitations Phase I Engineer: Affiliated Engineers Walnut Creek Phase II Engineer: Brummell Myrick San Luis Obispo

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Project Phasing Phase I: Building shell Building shell Major equipment Major equipment Main supply/return/exhaust ductwork Main supply/return/exhaust ductwork Phase II: Interior finishes Interior finishes Terminal units & zone ductwork Terminal units & zone ductwork Controls Controls

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Differences in Design Approach Building systems: VAV reheat system VAV reheat system 2 AHU’s 2 AHU’s Offices and labs – heating, cooling, and economizer Offices and labs – heating, cooling, and economizer Shop spaces – heating only, 100% outside air Shop spaces – heating only, 100% outside air Constant volume fume hoods, variable volume exhaust Constant volume fume hoods, variable volume exhaust Phase I designer approach: Common exhaust system serving all lab fume hoods Common exhaust system serving all lab fume hoods Makeup air damper on exhaust fan to ensure minimum stack velocity Makeup air damper on exhaust fan to ensure minimum stack velocity Phase II designer approach: Concerned about fume hood chemical compatibility Concerned about fume hood chemical compatibility Separate dedicated exhaust fans for each fume hood Separate dedicated exhaust fans for each fume hood Results in main exhaust fan being oversized Results in main exhaust fan being oversized

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Phase I Design - System Schematic

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Phase II Design - System Schematic

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Project Goals Convert constant volume fume hoods to VAV Convert constant volume fume hoods to VAV Develop project proposal, scope of work, plans, and new sequences of operation Develop project proposal, scope of work, plans, and new sequences of operation Calculate project cost, energy savings, and payback Calculate project cost, energy savings, and payback Obtain utility rebates from PG&E and So Cal Gas Obtain utility rebates from PG&E and So Cal Gas Propose to campus, and get approval for necessary funding Propose to campus, and get approval for necessary funding Install and commission Install and commission

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Design Issues to be Evaluated Leave hoods on dedicated fans or reconnect to main exhaust system? Leave hoods on dedicated fans or reconnect to main exhaust system? Are all materials used in hoods chemically compatible and safe to mix? Are all materials used in hoods chemically compatible and safe to mix? What is the best control approach? Aircuity vs. Siemens? Pheonix valves vs. butterfly valves? What is the best control approach? Aircuity vs. Siemens? Pheonix valves vs. butterfly valves? Are there any other operational or commissioning issues that need to be resolved? Are there any other operational or commissioning issues that need to be resolved? Evaluate capital cost, payback, and life cycle cost of each option. Evaluate capital cost, payback, and life cycle cost of each option.

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Next Steps Building tour next week – Thursday Jan 14 at 11:00 – meet in Eng III courtyard Building tour next week – Thursday Jan 14 at 11:00 – meet in Eng III courtyard Study building plans and sequences of operation Study building plans and sequences of operation Talk to building technician, lab users, and EH&S about hood user needs and chemicals used Talk to building technician, lab users, and EH&S about hood user needs and chemicals used Talk to building engineers about building operational issues regarding temperature control, building pressurization, maintenance issues Talk to building engineers about building operational issues regarding temperature control, building pressurization, maintenance issues Determine analysis and design tasks that are necessary Determine analysis and design tasks that are necessary Survey system, record equipment data, take measurements Survey system, record equipment data, take measurements Organize teams and delegate tasks Organize teams and delegate tasks

ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Resources Building plans: Building plans: HVAC zoning and locations of equipment: HVAC zoning and locations of equipment: Facility Services Facility Services Brummel Myrick Engineers Brummel Myrick Engineers Rumsey Engineers Rumsey Engineers George Yardley Company (Aircuity and Phoenix) George Yardley Company (Aircuity and Phoenix) Siemens Siemens