Ventilation. Dust hazards created by abrasive blasting v How respirable dust is formed v Composition and toxicity v Review exposure limits in 29 CFR 1910.1000.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
Energy Efficient Heating Ventilating and Air Conditioning.
Before starting actual arc welding the student should be fully aware of the dangers involved. The high temperature arc and hot metal can cause severe.
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Chemical Fume hood or Biosafety Cabinet
Fired And Unfired Pressure Vessels
NFPA 96 and Building Code Requirements for Commercial Kitchen Hood Systems Presentation for the Sevier County Fire Code and Building Code Officials Presented.
Machine Shop Hazards, Machine Tool Safety
Unit: Oxy-Acetylene; Welding, Brazing, Cutting & Heating
Mechanical Plan Review. Review Plan Package Use Group/Occupancy Correct Code Reference/Conformance Revisions Mechanical Plans/Spec Books Structural Plans.
General and Local Exhaust Ventilation
Engineering Controls and Laboratory Design Session 4 Laboratory Safety Training.
Laboratory Ventilation. 2 Types of Laboratory Hoods  Constant Volume  Conventional  By-Pass  Auxiliary-Air  Reduced Air Volume  Variable Volume.
Ventilation Systems As Control Measures. Introduction A good and effective ventilation system is necessary in a workplace which have processes that emit.
SAFETY TALK - SLIDE 1 OF 14 Elkhart Products Corporation 08/00 WELCOME ELKHART PRODUCTS CORPORATION “TOOLBOX SAFETY TALK” Welding, Cutting, & Burning.
Welding, Cutting, & Burning. GENERAL HAZARDS General hazards of welding include: –Impact –Penetration –Harmful dust –Smoke –Fumes –Heat –Light radiation.
Local Exhaust Hoods. 2 Introduction:  Designed to capture and remove harmful emissions from various processes prior to their escape into the workplace.
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE
Zettl Group Safety Talk ~Fume Hoods~ 09/28/06 Takashi Ikuno.
LOCAL EXHAUST VENTILATION …study of the principles associated with proper application of local exhaust ventilation (LEV) for control of airborne contaminants.
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
Standard 29 CFR Part Welding, Cutting and Brazing Training.
Chemical Fume Hood  A type of local ventilation device that is designed to limit the user's exposure to hazardous or noxious fumes, vapors or dusts.
The gasses, fumes and dust produced by welding and cutting processes can be hazardous. There are 3 basic methods to protect personnel against hazardous.
Buildings and Structures 2 Natural and Mechanical Ventilation.
Spray Finishing Operations/Spray Booth March 9, 2009.
Control of Work Environment Hazards
7.12 VENTILATION PROCEDURES ENABLING OBJECTIVES DESCRIBE the objectives for ventilating a compartment for a GFE evolution DEFINE the terms.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Ventilation for Confined Spaces requires ventilation as follows: An employee may not enter the space until the forced air ventilation has eliminated.
Local Exhaust Ventilation
TRI MARTIANA.  A good and effective ventilation system is necessary in a workplace which have processes that emit air contaminants such as dust, fumes,
Machine Guarding.
Patrick Thornton, SNS/FPE June 9, 2008
Personal Protective Equipment
Unit 6.4. Filtration TB Infection Control Training for Managers at National and Subnational Level.
Eliminating and Controlling Dust & Noise Hazards July 2002.
Illumination for Industrial Painting Projects Presented by: William Hansel, Caltrans.
VENTILASI TRI MARTIANA. Introduction A good and effective ventilation system is necessary in a workplace which have processes that emit air contaminants.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Safety Training Presentation
Hazardous Materials Subpart H. Subpart H Standards Compressed Gases Acetylene Hydrogen Oxygen Nitrous Oxide Flammable.
Electrical Safety in Construction. Objectives In this course, we will discuss the following: Common electrical hazards Standards relating to those hazards.
RESPIRATOR REFERENCES
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
ENGINEERING BY CALEB REILLY- HALL. HAZARDS Mechanical equipment (such as metal guillotines, power presses, angle grinders) Forklifts Welding Noise Electricity.
Hot Work Procedures Fire Control. Cutting and Welding Where practicable all combustibles shall be relocated at least 35 feet from the work site Where.
Finishing Safety. When using stains, paints and other finishes Wear eye protection. Wear old clothing or cover your clothes Wear a respirator when spraying.
Unit 4: General Safety Practices
OSHA’s Most Frequently Cited Violations Hazard Communication 29 CFR (f)(5)(ii) states that all chemical containers must be labeled.
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
Lab design Assignment 3 Unit 2.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
29 CFR Subpart G Related Terminal Operations and Equipment.
Hierarchy of Hazard Control
Flammable Liquids Directorate of Training and Education
Excavation & Trenching Awareness Plus
PRESENTATION ON ARC WELDING SAFETY. Before starting actual arc welding the operator should be fully aware of the dangers involved. The high temperature.
Industrial Ventilation
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE
ROCKET TESTING TYPES OF TESTS
Controlling Chemical Hazards
Most Frequently Cited Serious Violations
CONFINE SPACE.
Welding Fumes and Gasses
Laboratory Ventilation
Spray Booths Follow safe operating instructions
Presentation transcript:

Ventilation

Dust hazards created by abrasive blasting v How respirable dust is formed v Composition and toxicity v Review exposure limits in 29 CFR a

Dust hazards created by abrasive blasting v Organic abrasives v Flammable or explosive dust 1b

Blast-cleaning enclosures v Exhaust ventilation v Baffling air inlets and access openings v Rate of exhaust 2a

Blast-cleaning enclosures v Before opening: blast must be turned offblast must be turned off exhaust system must be runexhaust system must be run v Protection for observation windows v Slit abrasive-resistant baffles 2b

Blast-cleaning enclosures v Doors must be flanged and tight when closedmust be flanged and tight when closed must be operable from both inside and outsidemust be operable from both inside and outside 2c

Inspection & maintenance of exhaust systems v Z , and ANSI Z v Dust leaks must be repaired ASAP v Static pressure drop at the exhaust ducts 3a

Inspection & maintenance of exhaust systems v Installations where the abrasive is recirculated v Dust collectors 3b

Personal Protective Equipment v Abrasive-blasting respirators must be worn: inside blast cleaning roomsinside blast cleaning rooms when using silica sandwhen using silica sand when toxic dust exceeds exposure limitswhen toxic dust exceeds exposure limits v Dust filter respirators 4a

Personal Protective Equipment v Heavy canvas or leather gloves and aprons v Safety shoes v Eye and face protection 4b

Air quality for abrasive- blasting respirators v Free of harmful quantities of dusts, mists, or noxious gases v Meets requirements in 29 CFR (i) 5a

Operating procedures and general safety v v Dust must not accumulate on the floor or ledges outside of an abrasive-blasting enclosure v v Dust spills must be cleaned up promptly v v Keep aisles and walkways clear 6a

Grinding, polishing, and buffing operations v Local exhaust ventilation systems Remove dust, dirt, fumes, and gasesRemove dust, dirt, fumes, and gases Required when employee exposure exceeds permissible exposure limitsRequired when employee exposure exceeds permissible exposure limits 7a

Grinding, polishing, and buffing operations v Hood and branch pipe requirements Design and placement so particles fall or are projected into the hoodsDesign and placement so particles fall or are projected into the hoods Operation must not cause particles to be thrown into the operators breathing zoneOperation must not cause particles to be thrown into the operators breathing zone Follow specified exhaust volumesFollow specified exhaust volumes 8a

Grinding, polishing, and buffing operations v Exhaust system requirements Designed and tested in accordance with American Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems, Z Designed and tested in accordance with American Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems, Z All exhaust systems must be provided with suitable dust collectorsAll exhaust systems must be provided with suitable dust collectors 9a

Hood and enclosure design v Functions to: Protect the operator from the hazards of bursting wheels, andProtect the operator from the hazards of bursting wheels, and Provide a means for the removal of dust and dirt generatedProvide a means for the removal of dust and dirt generated v Structural strength 10a

Hood and enclosure design v Adaptable to particular machine v Exhaust hoods for floor stands, pedestals, and bench grinders must be designed in accordance with figure G-2 of (b) 10b

Hood and enclosure design v Swing-frame grinders must be provided with exhaust booths as indicated in figure G-3 of (b) 10c

Hood and enclosure design v Portable grinding operations, whenever the nature of the work permits, must be conducted within a partial enclosure 10d

Hood and enclosure design v Hoods for polishing and buffing and scratch-brush wheels must be constructed to conform as closely to figure G-4 of (b) as the nature of the work will permit 10e

Hood and enclosure design v Cradle grinding and polishing operations must be performed within a partial enclosure similar to figure G-5 of (b) 10f

Hood and enclosure design v Hoods for horizontal single- spindle disc grinders must be constructed to conform as closely as possible to the hood shown in figure G-6 of (b) 10g

Hood and enclosure design v Horizontal double-spindle disc grinders must have a hood encircling the wheels and grinding chamber similar to that illustrated in figure G-7 of (b) 10h

Hood and enclosure design v Vertical-spindle disc grinders must be encircled with a hood so constructed that the heavy dust is drawn off a surface of the disc the heavy dust is drawn off a surface of the disc the lighter dust exhausted through a continuous slot at the top of the hood as shown in figure G-1 of (b)the lighter dust exhausted through a continuous slot at the top of the hood as shown in figure G-1 of (b) 10i

Hood and enclosure design v Grinding and polishing belt hoods must be constructed as close to the operation as possiblemust be constructed as close to the operation as possible the hood should extend almost to the beltthe hood should extend almost to the belt one-inch wide openings are provided on either sideone-inch wide openings are provided on either side 10j

Operations considered to be spray finishing v Methods wherein organic or inorganic materials are utilized in dispersed form for deposit on surfaces to be coated, treated, or cleaned v May involve either automatic, manual, or electrostatic deposition 11a

Operations considered to be spray finishing v Does not include: metal spraying or metallizingmetal spraying or metallizing dippingdipping flow coatingflow coating roller coatingroller coating tumblingtumbling centrifugingcentrifuging spray washing and degreasing systemsspray washing and degreasing systems 11b

Location and use of spray booths v Enclose or confine all operations 12a

v Must be located as provided in sections 201 through 206 of the Standard for Spray Finishing Using Flammable and Combustible Materials, NFPA No Location and use of spray booths 12b

Location and use of spray booths v Used to enclose or confine all spray finishing operations covered by 29 CFR v Terms Spray boothSpray booth Spray roomSpray room 12c

Design and construction of spray booths v 29 CFR (b)(1)-(4) and (6)-(10) v ANSI Z a

Design and construction of spray booths v Lights, motors, electrical equipment, and other sources of ignition must conform to the requirements of 29 CFR (b)(10) and (c) v In no case must combustible material be used in the construction 13b

Design and construction of spray booths v Walkways v Baffles, distribution plates and dry-type overspray collectors v Wet or water wash spray booths 13c

Design and construction of spray booths v Collecting tanks v Pump manifolds, risers, and headers 13d

Design and construction of spray rooms v Must be constructed of masonry, concrete, or other noncombustible material v Must have noncombustible fire doors and shutters 13e

Design and construction of spray rooms v Adequate ventilation the atmosphere in the breathing zone of the operator must be maintained in accordance with the requirements of 29 CFR (c)(6)(ii)the atmosphere in the breathing zone of the operator must be maintained in accordance with the requirements of 29 CFR (c)(6)(ii) 13f

Design and construction of spray rooms v Spray rooms used for production spray-finishing operations must conform to the requirements for spray booths 13g

Ventilation during spray finishing operations v Ventilation must be provided in accordance with provisions of 29 CFR (d) 14a

Ventilation during spray finishing operations v Where a fan plenum is used it must be of sufficient strength or rigidity to withstand the differential air pressure or other superficially imposed loads for which the equipment is designed and also to facilitate cleaning - 29 CFR (c)(5)(iii) 14b

Ventilation during spray finishing operations v Inlet ductwork v Exhaust ductwork 14c

Velocity and air flow requirements v Except where a spray booth has an adequate air replacement system, the velocity of air into all openings of a spray booth must be not less than that specified in Table G-10 of 29 CFR (c) for the operating conditions specified 15a

Velocity and air flow requirements v Adequate air replacement system v Total air volume 15b

Velocity and air flow requirements v Respirator is required when the operator is downstream from the object being sprayed v Downdraft booth doors must be closed when spray painting 15c

Make-up air in spray finishing operations v Clean fresh air must be supplied to a spray booth or room in quantities equal to the volume of air exhausted through the spray booth 16a

Make-up air in spray finishing operations v Self-closing doors, dampers, or louvers v Filtered air supply v Heating make-up air 16b