Mark Strong, P.E. CH2M HILL Christopher Bozzini, P.E. CH2M HILL

Slides:



Advertisements
Similar presentations
Case Study of Subsurface Vapor Intrusion at a Dry Cleaner Site Amy Goldberg Day AEHS Annual East Coast Conference on Soils, Sediments.
Advertisements

Bliss Area Sewage System Groundwater Monitoring Pete Ganzel Washington County Department of Public Health & Environment.
© 2011 COLUMBIA Technologies. Use of MiHpt Systems to Improve Project Outcomes Rapid, Real-Time High Resolution Site Characterization © 2013 COLUMBIA Technologies.
Overview: I.Introduction/Background A.Kevin Allen B.Noel Shenoi II.Core Basics III.Solutions IV.Additional Literature.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
1.  Consider objectives Control migration of gas Control emission Control odors Maximize gas collection fir energy recovery Comply with regulations 
Technical options for placement of CO 2 in the maritime area  by Paul Freund
Biodegradation and Natural Attenuation
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
Air Sparging at Fort Greely, Alaska Presented by Aung Syn & James Powell.
1 In Situ Oxidation of PAH Contaminants Associated With Former Manufactured Gas Plants Ron Jensen Southern California Edison 1.
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
Forms of Hydraulic Fractures at Shallow Depths in Piedmont Soils.
1 Thermal Remediation Services, Inc. Electrical Resistance Heating for In-Situ Remediation of Soil & Groundwater December 10, 2002 Greg Beyke (770)
DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing
LANDFILL PROFILING FOR GAS, LIQUIDS AND VACUUM & ENHANCED STEAM BIOREACTORS STI Engineering By Reg Renaud.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
1 Kent S. Sorenson, Jr. Ryan A. Wymore Enhanced Bioremediation for Treatment of Chlorinated Solvent Residual Source Areas – Case Study and Implications.
Coal By Cole Hudson. Opening Coal is an important resource that greatly improved industrial America from 1869 to During this time period, coal was.
Rhode Island Department of Environmental Management
Remedy Analysis for Sierra Army Depot, Building 210 Area
“Advanced sorbent solutions for the environment.” © 2003, all rights reserved Demonstration of Amended Silicates™ for Mercury Control at Miami Fort Unit.
Converting a supply well into an ASR well: Case Histories Roger Dittus PG – United Water Idaho Inc.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
1 Case Summary: Electrical Resistance Heating ICN Pharmaceuticals, Inc. Portland, Oregon Jennifer Sutter, Project Manager Oregon DEQ EPA Technology Innovation.
DO NOW 1.Take out your 5 facts so I can check them and then share them with your table. 2.Binder clean out. What to keep: Last night’s HW Any assignments.
Earth System Sciences, LLC Suggested Analyses of WRAP Drilling Rig Databases Doug Blewitt, CCM 1.
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
1 Section 5: Limitations. 2 ISCO Limitations  Saturated Zone vs Unsaturated Zone  Chemistry  CoSolvents  Geology /Geochemistry/Hydrogeology  NAPL.
Water Well Design August 6, 2015 AL/MS AWWA Ralph Hayes, P.E., BCEE Engineering Director MSDH, Bureau of Public Water Supply.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Numerical simulation of the Alum lakes geothermal outflow J. Newson and M. J. O’Sullivan.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Presented by Michael Taraszki, PG, CHG Engineering and Consulting, Inc. Perchlorate Monitoring in the Llagas Groundwater Subbasin South Santa Clara County,
Cosolvent Flushing and Enhanced Bioremediation at a Dry Cleaner Site By Michael D. Annable Department of Environmental Engineering Sciences 1.
GROUND WATER MONITORING TO EVALUATE EFFECTS OF LAND USE ON WATER QUALITY Mike Trojan Erin Eid Jennifer Maloney Jim Stockinger Minnesota Pollution Control.
1 Effective Characterization Technologies Deana M. Crumbling, M.S. Technology Innovation Office U.S. Environmental Protection Agency Washington, D.C. (703)
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Old Oilfield vs. New Homes Case Study - Site history Patricia Billingsley, Brownfields Manager, Oklahoma Corporation Commission.
Induction Conductivity and Natural Gamma Logs at the Osage Skiatook Research Sites “A” and “B”, Northeastern, Oklahoma By Marvin M. Abbott, Bruce D. Smith,
Planning & Community Development Department City Council Meeting November 18, 2013 Greenhouse Gas Emissions Inventory.
1 Section 6- ISCO DESIGN  Initial Site Evaluation  ISCO Compatibility  ISCO Modeling and Dosage Considerations  Bench Testing  Pilot Testing/Delivery.
1 LOCKFORMER ELECTRIC RESISTIVE HEATING CASE STUDY U.S. EPA Emergency Response Branch Steve Faryan, On-Scene Coordinator ,
Objective Data  The outlined square marks the area of the study arranged in most cases in a coarse 24X24 grid.  Data from the NASA Langley Research Center.
The effect of pyro-convective fires on the global troposphere: comparison of TOMCAT modelled fields with observations from ICARTT Sarah Monks Outline:
Two Union Square Union Street, Suite 601 Seattle, WA (206) Field testing and modeling of in situ groundwater.
TCE and 1,2-DCE Biotransformation Inside a Biologically Active Zone Anthony W. Holder, Philip B. Bedient, and Joseph B. Hughes Environmental Science and.
Tom Beebe Project Manager
1, 12/2/ Key factors for a successful ISCO application with Permanganate Prepared by: Richard W Lewis CPG Program Manager ERM.
1 Practical Considerations for Source Area Treatment: Interim Measures Dean Williamson, P.E. CH2M HILL Constructors, Inc. December 11, 2002.
Ozone Transport that Impacts on Tribal Land: Case Study Stan Belone Salt River Pima-Maricopa Indian Community.
A Tree-Based Remediation System for Treatment and Hydraulic Control of a Hydrocarbon Plume in a 20 Foot Deep Aquifer at a Former Refinery in Central Oklahoma.
FULL - SCALE IMPLEMENTATION OF A PULSED AIR SPARGE AND SVE SYSTEM FOR TREATMENT OF VOCS, SVOCS, AND ARSENIC Authors: Kale Novalis, Nadira Najib, Omer Uppal,
High Resolution Site Characterization of 1,4 Dioxane Sites using a New On-site, Real-time Analysis William M. Davis, Christopher P. Antworth and Christopher.
Mike Perlmutter 5th Annual Joint Services Pollution Prevention and
Some Observations from Using a Colloidal Borescope in Basalt Aquifers Gerry Winter.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Robert Rice.
1 Salt Water Disposal Pilot Project October 14, 2008.
BUILDING STRONG ® TNT Source Area Ground Water Remediation Former Nansemond Ordnance Depot Formerly Used Defense Site June 2, 2016.
Proposed Plan for No Further Action
Rapid Closure of Lingering Off-Site Plume Remediation Program in Residential Neighborhood using Horizontal Air Sparge and Soil Vapor Extraction Wells Narayanan.
ENHANCED BIOREMEDIATION PILOT USING iSOC® TECHNOLOGY AT A FORMER MANUFACTURED GAS PLANT CASE STUDY PREPARED BY: MR. DAVID WORK, PE RETEC GROUP.
Impact of GOES Enhanced WRF Fields on Air Quality Model Performance
Emission and Air Quality Trends Review
Emission and Air Quality Trends Review
Olusola Ayilara, P.E., P.G. PST-DCRP Section, Remediation Division
Ambient Monitoring Initial Report
Presentation transcript:

Air and Ozone Sparging of TCE Using a Directionally Drilled Horizontal Well Site 86, Camp Lejeune Mark Strong, P.E. CH2M HILL Christopher Bozzini, P.E. CH2M HILL Daniel Hood, NAVFAC Mid-Atlantic Bob Lowder, MCB Camp Lejeune EMD

Camp Lejeune Background Second largest U.S. Marine Corps Base in the Country Camp Lejeune was established near the city of Jacksonville, N.C, in 1942. Base covers 236 square miles CERCLA site since 1989 22 Operable Units (OUs), 97 Sites.

Site Location and History Site 86 is associated with three former waste oil ASTs, used during the 70s and 80s Over the course of several investigations since 1992, the solvent plume migrated away from the source area and now extends several hundred feet off-site Bld. 25

Prevent further migration of the TCE plume off-site Pilot Test Objectives Prevent further migration of the TCE plume off-site Evaluate air (and ozone) distribution using a horizontal well Determine if ozone and/or air sparging can reduce TCE impacts to below regulatory standards within one year

TCE in Plume in 2002 (30-35’ bgs)

TCE in Plume in 2002 (40-45’ bgs)

TCE in Plume in 2002 (50-55’ bgs)

Site 86 Cross Section

Directional Drill Rig On-Site

Air Sparge ‘Screen” 0.020 Inch Wide Slots 0.5% Open Area 4” SDR 11 HDPE Pipe 0.020 Inch Wide Slots 0.5% Open Area

Directional Sparge Well Layout Total Length of Drill = 950’ Total Slotted Length - 350’

Compressor and Ozone Generator Temporary Buildings (Connex Boxes)

Ozone Generator Chiller

Air Compressor, Receiver, Gas Cooler

Ozonia Generator (CFV-03, 60 ppd, air feed) Photo courtesy Ozonia North America

Baseline TCE Concentrations, Feb ‘05 30-35 ft bgs

Baseline TCE Concentrations, Feb ‘05 40-45 ft bgs

Baseline TCE Concentrations, Feb ‘05 50-55 ft bgs

Three Months of Air Sparging (120-140 cfm) Schedule Three Months of Air Sparging (120-140 cfm) One Month of “Rebound” Monitoring Six Months of Ozone Enhanced Air Sparging (~ 7000 ppmv) Three Months of “Rebound” Monitoring (Recently Completed)

Ozone Injection Performance Ozone production began in late July, 2005 Intermittent operation from July to December Mechanical issues: desiccant dryer and chiller Total aggregate run time ~ 2-1/2 months (50% up time) Total mass of ozone delivered ~ 3900 pounds

Average TCE Concentrations Zone “A” Monitoring Wells (30-35’ Screen Depth)

Average TCE Concentrations Zone “B” Monitoring Wells (40 - 45’ Screen Depth)

Average TCE Concentrations Zone “C” Monitoring Wells (50 - 55’ Screen Depth)

Discussion SVE was not conducted because of low permeability overburden; trace levels of TCE measured in shallow vapor during operation (ppbv) Air was diverted horizontally by overburden; air bubbling was observed 300 feet from the well Lateral propagation of air “fingering” was estimated to be 50 feet on either side of the well, as indicated by dissolved oxygen concentrations Negligible increases in dissolved chloride from baseline levels

Conceptual Model

Example Dissolved Oxygen and ORP Trend

Summary of Analytical Data

Conclusions 90% average reduction of TCE within three months in wells with baseline TCE > 50 μg/L 99% average reduction within one year in wells with baseline TCE > 50 μg/L No significant rebound after three months (greater than 25 µg/L) Distance of influence ~ 50 ft on both sides of the well (as indicated by DO measurements) Possible contribution of ozone to TCE mass reduction inconclusive - low TCE concentrations and limited period of operation

Horizontal Well, Compressed Air System, Container, Electrical ~ $250K Summary of Costs $750K Total Budget Horizontal Well, Compressed Air System, Container, Electrical ~ $250K Ozone System and Container ~ $300K Monitoring ~ $100K O&M ~ $100K