Model 895 AP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:

Slides:



Advertisements
Similar presentations
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Servicing Welch DRYFAST ULTRA Pump Models 2032
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
Model 695AV 1. Dissasembly To replace the spring, or clean any of the internal components of the valve, proceed in the following manner: A.Cut the seal.
Model 495/496 EP Full lift safety valve with spring loading (AIT) model 495/496 - EP. 1. Disassembly and assembly. 1.1 Disassembly. To replace the spring,
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Model DISASSEMBLY AND ASSEMBLY 1- Disassembly To replace the spring (11), or clean any of the internal components of the valve, proceed in the.
Model 995 EP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Model 495/496 AP and CP Full lift safety valve with spring loading (AIT) model 495/496 - AP and CP. 1. Disassembly and assembly. 1.1 Disassembly. To replace.
CHAPTER 33 Drum Brake Systems.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
Model 296ES 1. Disassembly To replace the spring, or clean any of the internal components of the valve, proceed in the following manner: DISASSEMBLY AND.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
4S-100, 4SG-100 2½”-10”. Modification Overview  Production of the 4S-100 aka (DC4S) began in  The 4SG-100 was introduced in The “G” indicates.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
XR5919 Steering Relief Valve Adjustment. Step1 Remove center cover Steering Priority Valve Test Port.
Model 466_666 Thorough and regular cleaning, in accordance with the working conditions, is recommended. The gauges are fitted with two bleed cap that.
PVB ¾”- 2”. Modification Overview  Production for the ¾” – 1” PVB began in 1995 and is current.  The body of the ¾” – 1” PVB was modified in July of.
Additional Hand Tools Harding High School Mr. Pottkotter & Mr. Robinson.
774X DCDA 21/2”, 6”, 8” 774X DCDA 21/2”, 6”, 8”. Modification Overview  Production began in  The 2 ½” 774X DCDA was discontinued in  The.
”-10”.
½”-10”.
826YD 21/2”-10”.
PVB-4A ½”- 2”.
720A ½”-2”.
774X 21/2”, 6”, 8”.
420, 420XL ¾”-1”.
LCD Splicing Screens Wall-mounted Guide
2000SS 2½”-12”.
800 (M2,M3,M4) ½”-2”.
830, 831 4”- 6”.
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
DCV, DCVE ½”-2”.
Disassembly and Assembly of A800C-W Electronic Governor Actuator for 7100 Fuel Injection Pump
¾”-2”.
½”- 2”.
Rear Cover Assembly.
¾”-2”.
DC4A (LF) ½”-2”.
RPZ-II, RPZE-II ½” , ¾” , 1½”.
774 DCDA 21/2”-12”.
909 3/4”-2”.
4D-100, 4D-600 2½”- 10”.
719 ½”-2”.
950, 950XL, 950XLT ¾”-2”.
909 21/2”-10”.
2000SS 2½”-12”.
880V 21/2”-10”.
975 2½”-10”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
4000CIV 21/2”-10”.
919 ¾”-2”.
909 RPDA 21/2”-10”.
Threads, Fasteners & Springs
Presentation transcript:

Model 895 AP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner: A. Cut the seal thread with pliers. B. Withdraw the fastener, using a punching tool, until the lever comes free. C. Unscrew and extract the hood. D. Holding the rod, unscrew the spring press, until you note a releasing of the spring. E. Extract the spring. 2.Assembly A. Enter the spring through the upper part of the rod. B. Screw the spring press holding the rod. C. Adjust the set pressure with the spring press. D. Screw the hood. E. Place the lever and fix it with the fastener.

Model 895 AP ADJUST THE FIRING PRESSURE A. Cut the seal thread with pliers. B. Withdraw the fastener, using a punching tool, until the lever comes free. C. Unscrew and extract the hood. D. Holding the rod, unscrew the spring press, until you note a releasing of the spring. Important We advice that the adjustment or readjustment of the set pressure and the exchange of the seal should be done in our installations, with the original and warranted spare parts.