1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Water Use Optimization: Hydrologic Forecasting Presenter: Mark Wigmosta Organization:

Slides:



Advertisements
Similar presentations
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Advertisements

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.
Program Name or Ancillary Texteere.energy.gov Wind and Water Power Technologies Office United States Department of Energy Water Power Program: Hydropower.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
0 Future NWS Activities in Support of Renewable Energy* Dr. David Green NOAA, NWS Office of Climate, Water & Weather Services AMS Summer Community Meeting.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
Washington Water Outlook Hosted by University of Washington Climate Impacts Group March 21, 2005 Introductory Comments Dennis P. Lettenmaier Department.
Recap of Water Year 2008 Hydrologic Forecast and Forecasts for Water Year 2009 Francisco Munoz-Arriola Alan F. Hamlet Shraddhanand Shukla Dennis P. Lettenmaier.
Western Water Supply Kevin Werner, Andrew Murray, WR/SSD Jay Breidenbach, WFO Boise Cass Goodman, Steve Shumate, CBRFC Alan Takamoto, Scott Staggs, CNRFC.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN.
Application of seasonal climate forecasts to predict regional scale crop yields in South Africa Trevor Lumsden and Roland Schulze School of Bioresources.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Near Space Systems Inc. Small Hydropower Research and Development Technology.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review CH TD Task Water Use Optimization Presenter: John Gasper Organization:
CPC’s U.S. Seasonal Drought Outlook & Future Plans April 20, 2010 Brad Pugh, CPC.
Water Supply Forecast using the Ensemble Streamflow Prediction Model Kevin Berghoff, Senior Hydrologist Northwest River Forecast Center Portland, OR.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review SubTask CH TD Day-ahead Scheduling and Real-time Operations Tool Conventional.
Experimental seasonal hydrologic forecasting for the Western U.S. Dennis P. Lettenmaier Andrew W. Wood, Alan F. Hamlet Climate Impacts Group University.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
Forecasting Streamflow with the UW Hydrometeorological Forecast System Ed Maurer Department of Atmospheric Sciences, University of Washington Pacific Northwest.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Integrated Basin Scale Hydropower Opportunity Assessment Initiative Simon Geerlofs.
Where the Research Meets the Road: Climate Science, Uncertainties, and Knowledge Gaps First National Expert and Stakeholder Workshop on Water Infrastructure.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Ocean Currents along the United.
Global Flood and Drought Prediction GEWEX 2005 Meeting, June Role of Modeling in Predictability and Prediction Studies Nathalie Voisin, Dennis P.
Office of Research and Development National Exposure Research Laboratory, Atmospheric Modeling and Analysis Division S.T. Rao Director, NERL/AMAD U.S.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Understanding hydrologic changes: application of the VIC model Vimal Mishra Assistant Professor Indian Institute of Technology (IIT), Gandhinagar
The NOAA Hydrology Program and its requirements for GOES-R Pedro J. Restrepo Senior Scientist Office of Hydrologic Development NOAA’s National Weather.
1 National Flood Workshop Dr. Thomas Graziano Chief Hydrologic Services Division National Weather Service National Oceanic and Atmospheric Administration.
S. Munier, A. Polebitski, C. Brown, G. Belaud, D.P. Lettenmaier.
1 Critical Water Information for Floods to Droughts NOAA’s Hydrology Program January 4, 2006 Responsive to Natural Disasters Forecasts for Hazard Risk.
Drought Prediction (In progress) Besides real-time drought monitoring, it is essential to provide an utlook of what future might look like given the current.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Potential for medium range global flood prediction Nathalie Voisin 1, Andrew W. Wood 1, Dennis P. Lettenmaier 1 1 Department of Civil and Environmental.
RFC Climate Requirements 2 nd NOAA Climate NWS Dialogue Meeting January 4, 2006 Kevin Werner.
1 RTI-USU Discussion Virtual, June 3, 2015 Science to support water resource operations and management Andy Wood and Martyn Clark NCAR Research Applications.
Sources of Skill and Error in Long Range Columbia River Streamflow Forecasts: A Comparison of the Role of Hydrologic State Variables and Winter Climate.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reference Model Development Richard Jepsen Sandia National Labs
Alan F. Hamlet Andy Wood Dennis P. Lettenmaier JISAO Center for Science in the Earth System Climate Impacts Group and the Department.
Nathalie Voisin 1, Florian Pappenberger 2, Dennis Lettenmaier 1, Roberto Buizza 2, and John Schaake 3 1 University of Washington 2 ECMWF 3 National Weather.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
EVALUATION OF A GLOBAL PREDICTION SYSTEM: THE MISSISSIPPI RIVER BASIN AS A TEST CASE Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier Civil and.
Note: This presentation contains only preliminary research results. If you have any questions, please contact Julie Vano at Thanks.
PNWRC Snake River Basin-wide streamflow forecasting Dennis P. Lettenmaier Marketa McGuire Department of Civil and Environmental Engineering University.
J an Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec-- Applications of Medium Range.
1 NOAA’s Integrated Water Forecasting Program Gary Carter Director, NWS Office of Hydrologic Development Manager, NOAA Integrated Water Forecasting Program.
Alan F. Hamlet Dennis P. Lettenmaier Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering.
Nathalie Voisin1 , Andrew W. Wood1 , Dennis P. Lettenmaier1 and Eric F
Water Power Peer Review
Andrew Wood, Ali Akanda, Dennis Lettenmaier
UW Civil and Environmental Engineering
Applications of Medium Range To Seasonal/Interannual Climate Forecasts For Water Resources Management In the Yakima River Basin of Washington State Shraddhanand.
Proposed CSES research in hydrology and water resources
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
Andy Wood and Dennis Lettenmaier
Washington Water Outlook
N. Voisin, J.C. Schaake and D.P. Lettenmaier
Andy Wood and Dennis P. Lettenmaier
Long-Range Hydropower Forecasts for the Columbia River, Colorado River, and Sacramento/San Joaquin Systems Alan F. Hamlet, Andrew Wood, Nathalie Voisin.
Global Flood and Drought Prediction
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Water Use Optimization: Hydrologic Forecasting Presenter: Mark Wigmosta Organization: PNNL Contact Info: Date: 11/03/2011 Water Use Optimization Hydrologic Forecasting Mark Wigmosta, Nathalie Voisin, Andre Coleman, Richard Skaggs, Erik Venteris PNNL Dennis Lettenmaier, Vimal Mishra, and Shraddhanand Shukla University of Washington Hydrologic Forecasting

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Challenges: Lack of broadly available inflow forecasts to the nation’s reservoir system generally result in overly conservative operational constraints to meet multiple water use objectives and mitigate the impacts of hydrologic extremes (flood, drought). Overly conservative constraints limit the opportunity to optimize electricity generation, environmental performance, and efficient water utilization. Objectives: Integrate and enhance PNNL and University of Washington/Princeton University Ensemble Forecast Systems to provide a national multi-scale streamflow forecasting system for the optimization toolbox Meteorological and streamflow forecasts at multiple user defined temporal and spatial scales (input to project components 1, 3, and 5) Longer lead times with reduced forecast uncertainty Basis for relaxation of constraints without increasing risk Increased opportunity for plant to system optimization

3 | Wind and Water Power Programeere.energy.gov Technical Approach Build on existing PNNL/UW capabilities Physics-based, distributed hydrologic model 1/8 degree (~12 km) grid Ensemble streamflow forecasting to capture uncertainty Medium-range (1-14 day lead) to seasonal forecasts Consistent, national approach for multi-scale ensemble streamflow forecasting data sets and methodology Automated assimilation of spatial and temporal data for improved forecast accuracy streamflow snowpack snow water equivalent snowpack spatial extent

4 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule Initiation date: Nov, 2009 Planned completion date: February, 2013 Milestones for FY10 and FY11 –Design document for integrated forecast model (FY10) - completed –Evaluation of remote sensing and alternative ensemble forecasts (FY10) - completed –Install UW/PU forecast system on PNNL high performance compute cluster (FY10) - completed –Prototype integration of PNNL and UW/PU forecast systems (FY11) - completed –Prototype of advanced data assimilation in integrated model (FY11) - completed –Initiate collaboration with National Weather Service (FY11) - completed –Initial application of forecast system to one demonstration basin (FY11) – completed in two basins –Preliminary seasonal forecasts in one demonstration basin (FY11) – completed in two basins –Preliminary medium range forecasts in one demonstration basin (FY11) – completed in two basins –Retrospective analysis of forecast accuracy in one demonstration basin (FY11) – completed in two basins Milestones for FY12 and FY13 –Demonstrate operability of forecast system at multiple sites –Successful integration in optimization toolbox Budget History FY2009FY2010FY2011/12 DOECost-shareDOECost-shareDOECost-share $400K*$400K $400 (anticipated) * *

5 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Completed Forecast System Design Document (FY10) Completed evaluation of remote sensing and alternative ensemble forecast methodology (FY10) Installation of UW/PU forecast system on PNNL computer cluster (FY10) –Ongoing modernization and optimization of core software –More flexible and generic approach Prototype Enhanced Hydrologic Forecast System (EHFS) (FY11) Initial application in two demonstration basins: Feather River, CA and Gunnison River, CO (FY11) –Calibration –Seasonal forecasts –Medium-range forecasts –Retrospective evaluation

6 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Feather River Basin, CA 1998 Seasonal forecasts issued in March and April skillful for 4-5 months ahead. Medium-range forecasts improve upon persistence.

7 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Gunnison River Basin, CO Seasonal forecasts issued in early spring are skillful for the first 2-3 months. Seasonal forecasts issued in late spring are skillful for 6 months. Impact of upstream regulation requires further study.

8 | Wind and Water Power Programeere.energy.gov Challenges to Date Modernization and optimization of core software architecture in current forecast systems –Upgrade inefficient system/platform specific software –Provide capacity for distributed computing –Development of robust and autonomous system Data assimilation –Spatially distributed (vs. lumped), physics-based model –Integration of multiple data sources (satellite and ground-based) and corresponding state variables Spatially-distributed weather forecasts –Multiple temporal scales –Downscaling –Ensembles Development of nationally consistent and autonomous system –Multiple spatial scales (subbasin – basin) –Multiple temporal scales (day-ahead to seasonal) –Consistent methodology and input datasets for national application

9 | Wind and Water Power Programeere.energy.gov Next Steps Project Plans and Schedule –Refine forecast requirements from operators and study team –Integrate forecast system within Water Use Optimization Toolset –Refine forecast system for improved application in demonstration basins –Evaluate performance and benefit to water use optimization Next Steps –DOE and hydropower industry forecast requirements Traditional objectives Renewable integration Climate variability/change –Continue interaction with NOAA National Weather Service Office of Hydrologic Development Calibration of ensemble weather forecasts Automated data assimilation Future integration into NWS Community Hydrologic Prediction System DOE-NOAA MOU