Designing Throughput Accountability

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
COSTING USER EVENT DREW WINBORN AND KIRK SOUTHCOTT.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Supplier Development Kaizen Implementation Kit
Lean Accounting and Value Stream Costing
Just-in-Time and Lean Systems
Types of Costing Systems (Pages ) By Ted House(former parts manager)
Operations Management Just-in-Time Systems Supplement 12
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Management Control Systems and Responsibility.
© 2007 Pearson Education O perations as a C ompetitive W eapon Chapter 1 YearExpected Demand Cash Flow 080,000($150,000) 190,000$90, ,000$150,000.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Value Stream Mapping.
Cost Control Measures for Food Service Operations
Overview of Lean Six Sigma
Perspective-Another set of eyes sees different opportunities Rob Bohn President Nema Enclosures Mfg, Inc.
Operations Planning Horizons
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Manufacturing Accounting Chapter Preparing a cost of goods manufacturing schedule. Learning Objective 1.
Traditional Cost Management Traditional Cost Management C H A P T E R 6.
Business Process Reengineering A how-to for understanding and improving your county’s business process NC WSS Leadership Summit – April 22-23,
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Integrating Sales & Marketing ~ The Lean Business Model.
9 - 1 ©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 9 Management Control Systems.
Chapter JOB-ORDER COSTING Chapter 4 Accounting Principles II AC Fall Semester, 1999.
EMBA Presentation October 20, Overview  Budgets Within the Architecture of the Organization  Types of Budgets  Budget Preparation Theories 
Needles Powers Crosson Principles of Accounting 12e Costing Systems: Job Order Costing 18 C H A P T E R ©human/iStockphoto.
Costing Systems: Job Order Costing 20. Product Unit Cost Information and the Management Process OBJECTIVE 1: Explain why unit cost is important in the.
18 Costing Systems: Job Order Costing Principles of Accounting 12e
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
INTEGRATING MANUFACTURING & SPECIAL PROCESSING KAIZEN PROCESS
On Target Group Coaching
Cost of Quality - COQ MGMT-5060 Operations Management.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
© BMA Inc All rights reserved. Value stream costing Lean reporting & control.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
© BMA Inc All rights reserved. Inventory valuation Lean reporting & control.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Fixed Operations A Basic Understanding. Areas Of Emphasis  Controlling Expenses  Personnel  Policy  Advertising  Other Supplies  Sales  Labor Sales.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Three Systems Design: Job-Order Costing.
PAGE 1 Sustainable Buildings 2030 © 2008 THE WEIDT GROUP Building Energy Benchmarks THE WEIDT GROUP.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eight ACCT7110-Dr. Bailey-Spring 2008 Activity-Based Costing: A Tool to Aid.
Strategic Plan Development Using KPIs to Develop the Strategic Plan.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
© BMA Inc All rights reserved. Decision Making.
Identifying Your Leading Indicators of Profitability Jim Heilborn Jim Heilborn Associates.
Gulay Litchfield For CQI-TECH PLC
Financial and Business Fluency Presented by: Insert your name ©Mentor Plus 2014 All Rights Reserved.
Needles Powers Crosson Principles of Accounting 12e The Budgeting Process 22 C H A P T E R ©human/iStockphoto.
Implementing Lean Accounting Making it happen © BMA Inc All rights reserved.
© BMA Inc All rights reserved. Lean reporting & control Performance Measurements.
Value Stream Mapping The flow of your business from start to customer March 8, 2012.
9 - 1 Chapter 9 Management Control Systems and Responsibility Accounting.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Performance Margins for Snowmaking
Copyright © 2015 McGraw-Hill Education. All rights reserved
Chapter 17 Job Order Costing
Facility Inventory Old Facilities Modern Facilities Classroom Size
Chapter 16 Lean Accounting
Activity-Based Costing Systems
2 Costing Systems: Job Order Costing Managerial Accounting 10e
KAIZEN PROCESS INTEGRATING MANUFACTURING & SPECIAL PROCESSING.
MANAGEMENT ACCOUNTING The Activity-Based Costing System based on John G. Burch, Cost and Management Accounting Materials prepared by Ph. D. Zofia Krokosz-Krynke.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Presentation transcript:

Designing Throughput Accountability A Case Study By Jim Warren President – Sunset Manufacturing Company Chair – NWHPEC Lean Accounting SIG

Sunset Manufacturing Co. History 1944 Sunset founded in Beaverton, OR 1944 – 1978 Mfg Stainless Steel Pipe Fittings 1979 – 2001 Re-Organized to High Precision CNC Machining Facility (Sunset Manufacturing’s Lean Journey begins August 2001…) 2002 – Today Implemented Cellular Machining for Low Volume High Mix

Our Lean Journey begins Aug 2001 Sunset Business Organization – 2001 Traditional Accounting Job Costing/Tracking Management by Results Low Profitability Competitive Barriers Increasing Raw Material Costs Increasing Health Benefit Costs Increasing Tooling Costs . Increasing Labor costs

Typical Lean Successes Setup Reductions of 86% Lots of 5S events Shop Floor Shipping and Receiving Tool Room Office Value Stream Mapping

Sales Order Flow Kaizen Kaizen Event Identified Major Change Needed In Accounting/Accountability Sales Order Flow Kaizen Estimating Order Entry Purchasing Work Order Flow Data Collection (Job Costing) Shipping/Invoicing

Event Discovery Clearer understanding of the value stream flows Job Costing Data Collection Analysis clearly showed too costly, time consuming and inaccurate tool to support critical management business decision-making. Work Order - Flow Too complex, unnecessary processes Management by Results (MBR) doesn't work in a lean organization As a matter of fact, it does not work in any organization !

Event Outcome Unplug the data collection system Implement a KanBan work order system

New Thinking Implement Management By Means (MBM) Management At The Point Of Action Develop Value Streams by Part Families Parts that travel the same machining process Develop Value Stream Measures (Metrics) Easy to understand, visual, real-time Implement Lean Accounting Methodology

Implement Management By Means (MBM) Management By Results (MBR) tries to steer from the back end of the process – traditional accounting methodology Management By Means (MBM) or Management At The Point Of Action – forward flow, self-improvement and problem resolution - lean accounting methodology

Develop Value Streams by Part Families Heavy equipment can’t move easily to accommodate flow Categorize all work processes to develop families of parts with similar flow characteristics Group machines for processing the particular family of parts in a hybrid flow process, eliminating wasted movements and lag time waiting for availability of the next process Create as close to single-piece-flow as possible.

Sunset’s Hybrid Value Streams Color codes provide quick identification of activities, resources, metrics and performance measures unique to a particular value stream. Example; color-coded KanBan Cards, work force assignments, purchasing, sales, service and shipping.

Simple Logic of Lean Accounting ??? Value Stream Flow Process ??? Inflow and Outflow the two data points needed to produce income statements The Question - “How do we manage/measure what happens in the value stream flow process?”

The Logical Answer

Implement Value Stream Costing Based on Alexander Church’s theory of reducing overhead expenses to direct costs or “Production Factors” Utilize Square Footage as the basis for applying Resource Production Factoring Identify and present Factors easily understood by supervisors and shop personnel

Value Stream Profit & Loss Statement We are currently in the process of automating the estimating, sales order, purchasing and shipping transactions to reflect the appropriate value stream. This alone will reduce data entry and wasted motion another 78% and we will automatically get a real time Value Stream P & L statement.

Enterprise Value Stream P & L LeanWerks currently in development

Visual Enterprise Level Metrics Present lean accounting metrics Daily, colorful, understandable - combining all value streams for an Enterprise snap shot We developed a “Box Score Card” that quickly portrayed cost and performance metrics against target values for daily, weekly, monthly, quarterly and yearly reporting periods

Sunset’s Key Enterprise Level Metrics Material/Subcontract/Components (COGS) Value-Added Sales (VAS) Shop Supplies Number Team Members (All shop floor personnel) Input Hours (Direct from time clock) Output Hours (Calculated average shop rate) Quantity Parts to be Shipped Quantity Parts Shipped Quantity Parts Scrap Percent Scrap On-Time Delivery (OTD) LPI – Lean Performance (LPI)

New Metric “LPI” Lean Performance Indicator Lean Performance Indicator is a consistent method to measure lean implementation effectiveness. A Key Core Value Metric for Motivating Performance and Rewarding Team Performance Through the PIP Plus Incentive Program. Indicator: Real Time Performance, Continuous Improvement Implementation, Lean Sustainment, Waste Elimination and Profitability. Goal: An LPI Monthly Goal of 100 - Equates to 116.3% Value-Added Output Performance at Level C Lean Performance. Formula: Value Added Sales (Total Sales Minus Raw Materials, Sub-Contracting and Components) divided by Shop Rate Per Hour () Divided by Number of Hourly Shop Floor Personnel Divided by 2.        

Lean Performance Indicator Chart Color coded brackets for visual performance level recognition.

Lean Performance Indicator (LPI) The LPI by design represents a monthly figure or a target number of 100, signified on the visual color coded “Lean Performance Indicator” chart as Lean level C. The LPI number calculated when you first begin your lean journey represents your set-point marker for tracking historical improvement data: day to day and year to year.

LPI – Shop Floor Tool A higher LPI number simply means your company’s continuous improvements are driving a higher level of throughput (VAS) per team member. The LPI measurement is extremely useful as a management tracking tool in place of the traditional accountant’s bottom line figure.

LPI – Management Tool As lean progresses in your company resulting in a higher LPI yield keep a close eye on your bottom line. If it isn’t moving with the higher LPI yield, management problems may be identified in other areas of the P&L. Your shop rates may need adjusting if efficiency is high and profitability is too low.

Sunset’s Key Metrics Enterprise Level Box Score Card Target Daily Performance Target Weekly Performance Week to Date Current State Lean Performance Indicator Chart LPI % of Target This Week LPI – WTD Current Lean Performance “Throughput” LPI Calculation – Sales minus raw materials, outside sub-contracting and components = Value-Added Sales (VAS) Divided by Average Hourly Shop Rate Divided by Number of Shop Team Members divided by Two = LPI Output Hours Calculation – Value-Added Sales divided by Average Shop Rate (including profit) = Output Hours Throughput Calculation = Output Hours Divided by Input Hours = Throughput

Daily Throughput Chart

Target Month Box Score Chart

Yearly Box Score Chart

Financial Box Score Chart

Lean (MBM) vs. Traditional (MBR)

Throughput Compared Company A Company B Value-Added Sales Dollars 285,500.00 285,500.00 Team Members 20 28 Input Hours 3460 4844 Output Hours at shop rate 3965 3005 Shop Rate Dollars p/hr Quoted 72.00 95.00 Shop Rate Dollars p/hr Produced 82.52 58.94 Input Hours per Member 173 173 Output Hours per Member 198.25 107.32 Value-Added Sales per Member 14,275.00 10,196.42 Throughput Efficiency Percent 114.6 62.04 Lean Performance Indicator (LPI) 99.13 53.67 Lean Performance Lean Level C Poor LeanTrack confirms the absolute value of implementing lean practices throughout the organization including lean accounting methodology tools. These examples indicate lean creates throughput increases with fewer personnel at a lower per hour rate. The truth of the matter: Lean Accounting increases your ability to compete globally.

Benefit of Throughput Metric Easy to track overall performance daily Easy to identify accuracy of shop rate charged – High throughput performance with low or no profit would signal a need to raise shop rate charged for services Easy to see measurable results of continuous improvements Easy to give understandable feed back

Special Thanks To Jim Huntzinger for graciously loaning his thesis “Lean Cost Management” to my NWHPEC Lean Accounting Special Interest Group as a study project.

Thank You for Attending This Case Study can be downloaded at www.ShopWerksSoftware.com LeanTrack and other lean tools are available at www.ShopWerksSoftware.com Sunset Manufacturing website www.SunsetCorp.com Contact Phone 503.692.1900