Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.

Slides:



Advertisements
Similar presentations
FHWA Guidance & Policies on Traffic Analysis James P. McCarthy, PE, PTOE Federal Highway Administration
Advertisements

An Open-Source Data Hub for Improving the Effectiveness of Integrated Modeling Applications Brandon Nevers (KAI) Xuesong Zhou, Jeff Taylor (Univ. of Utah)
Breaking the Static Barrier: Building Regional Support for Implementation of Dynamic Traffic Assignment in Long-Range Planning Processes TRB Planning Applications.
Project Prioritization - 1 Project Prioritization Using Paramics Microsimulation: A Case Study for the Alameda County Central Freeway Project Presented.
The TRANSIMS Model: Combining Travel Demand and Microsimulation Operating Paradigms Presented to 2012 ITE District 6 Annual Meeting by John Kerenyi, P.E.,
1 Corridor System Management Plan A Case Study for the Interstate 580 in Alameda County Prepared for: 2009 Paramics Annual User Group Meeting Presented.
DynusT (Dynamic Urban Systems in Transportation)
Beyond Peak Hour Volume-to-Capacity: Developing Hours of Congestion Mike Mauch DKS Associates.
ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation GPA Conference Fall 2012 Presented By: David Pickworth,
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
15 th TRB Planning Applications Conference Atlantic City, New Jersey Joyoung Lee, New Jersey Institute of Technology Byungkyu Brian Park, University.
Planning Applications: A City- wide Microsimulation Model for Virginia Beach Craig Jordan, Old Dominion University Mecit Cetin, Old Dominion University.
Evaluation of Potential ITS Strategies under Non-recurrent Congestion Using Microscopic Simulation Lianyu Chu, University of California, Irvine Henry Liu,
An Experimental Procedure for Mid Block-Based Traffic Assignment on Sub-area with Detailed Road Network Tao Ye M.A.Sc Candidate University of Toronto MCRI.
Presented to presented by Cambridge Systematics, Inc. Transportation leadership you can trust. An Integrated Travel Demand, Mesoscopic and Microscopic.
Can Multi-Resolution Dynamic Traffic Assignment live up to the Expectation of Reliable Analysis of Incident Management Strategies Lili (Leo) Luo, P.E.,
An Empirical Comparison of Microscopic and Mesoscopic Traffic Simulation Paradigms Ramachandran Balakrishna Daniel Morgan Qi Yang Caliper Corporation 14.
A Calibration Procedure for Microscopic Traffic Simulation Lianyu Chu, University of California, Irvine Henry Liu, Utah State University Jun-Seok Oh, Western.
Transportation Operations Group Toward a Consistent and Robust Integrated Multi-Resolution Modeling Approach for Traffic Analysis May 17-21, 2009 Jeff.
Evaluating InSync Performance in Microsimulation Aleksandar Stevanovic, PhD, PE Florida Atlantic University Transpo 2012 Bonita Springs, FL October 29,
May 10, 2011 Life-cycle Benefit-Cost Analysis of Alternatives for Accommodating Heavy Truck Traffic in the Las Vegas Roadway Network Dr. Alexander Paz,
©2009 Proprietary and Confidential DTA in practice: Modeling dynamic networks in the real world Michael Mahut, Ph.D. INRO Montreal, Canada.
SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process A Web Presentation to the Technical.
Considerations when applying Paramics to Strategic Traffic Models Paramics User Group Meeting October 9 th, 2009 Presented Matthew.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
From EMME to DYNAMEQ in the city of MALMÖ. THE COMPANY Founded in early 2011 Currently located in Stockholm, Gothenburg and Malmö Small company (currently.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
April 2010 Scott Smith Volpe Center / RITA / U.S. DOT Transportation Border Working Group Meeting Boston, MA An Integrated Regional Planning / Microsimulation.
Update on Developing Evacuation Model using Dynamic Traffic Assignment ChiPing Lam, Houston-Galveston Area Council Matthew Martimo, Citilabs.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco’s Dynamic Traffic Assignment Model Background SFCTA DTA Model Peer Review Panel Meeting July.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
+ Creating an Operations-Based Travel Forecast Tool for Small Oregon Communities TRB National Transportation Planning Applications Conference May 20, 2009.
DKS Associates. 2 Corridor System Management Plan (CSMP) Travel Demand vs. Simulation Models Micro vs. Meso Simulation Models US-101 Corridor Modeling.
Integrated Macro-Micro Highway Demand/Operational Analysis Case Study: Cross Bronx Expressway Corridor, Bronx, NY Presented at the 15 th TRB Transportation.
S. Erdogan 1, K. Patnam 2, X. Zhou 3, F.D. Ducca 4, S. Mahapatra 5, Z. Deng 6, J. Liu 7 1, 4, 6 University of Maryland, National Center for Smart Growth.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
MATRIX ADJUSTMENT MACRO (DEMADJ.MAC AND DEMADJT.MAC) APPLICATIONS: SEATTLE EXPERIENCE Murli K. Adury Youssef Dehghani Sujay Davuluri Parsons Brinckerhoff.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
WORK ZONE DELAY ESTIMATION Work Zone Management, Accelerated Construction, and Smart Work Zones TEAM Monthly Meeting November 16, 2004 Luis Porrello, Ph.D.,
Calibrating Model Speeds, Capacities, and Volume Delay Functions Using Local Data SE Florida FSUTMS Users Group Meeting February 6, 2009 Dean Lawrence.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Bharath Paladugu TRPC Clyde Scott Independent Consultant
A Dynamic Traffic Simulation Model on Planning Networks Qi Yang Caliper Corporation TRB Planning Application Conference Houston, May 20, 2009.
DVRPC TMIP Peer Review Dynamic Traffic Assignment (DTA) Oct. 29 th, 2014.
Methodological Considerations for Integrating Dynamic Traffic Assignment with Activity-Based Models Ramachandran Balakrishna Daniel Morgan Srinivasan Sundaram.
Analysis of the IH 35 Corridor Through the Austin Metropolitan Area TRB Planning Applications Conference Jeff Shelton Karen Lorenzini Alex Valdez Tom Williams.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Performance Evaluation of Adaptive Ramp Metering Algorithms in PARAMICS Simulation Lianyu Chu, Henry X. Liu, Will Recker California PATH, UC Irvine H.
CE Urban Transportation Planning and Management Iowa State University Calibration and Adjustment Techniques, Part 1 Source: Calibration and Adjustment.
Advanced Simulation and Performance Measurement in the BNMC-CDB North Area.
Corridor Management Planning in California Jeff X. Ban CCIT, UC-Berkeley Rensselaer Polytechnic Institute (RPI)
September 2008What’s coming in Aimsun: New features and model developments 1 Hybrid Mesoscopic-Microscopic Traffic Simulation Framework Alex Torday, Jordi.
The New 2010 Highway Capacity Manual An Overview.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
Development of Traffic Simulation Models Course Instructors: Mark Hallenbeck, Director, UW TRAC Tony Woody, P.E., CH2M HILL Offered By: UW TRANSPEED xxxxx,
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
Evaluation of Hard Shoulder vs
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Mesoscopic Modeling Approach for Performance Based Planning
TRB Planning Applications Conference 2017
Estimating the Traffic Flow Impact of Pedestrians With Limited Data
Jim Henricksen, MnDOT Steve Ruegg, WSP
Signalized Intersections
Ventura County Traffic Model (VCTM) VCTC Update
Problem 5: Network Simulation
Presentation transcript:

Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang Nguyen, PE, Kittelson & Assoc

Subarea Project Scope Develop Design Concept 7 miles 4 TI’s Frontage roads Determine 2040 capacity requirements –4 alternatives Identify traffic control needs Evaluate implementation phasing

Analysis Approach Traditional Approach - TDM –Develop design volumes from regional TDM –Develop peak hour turning volumes (K, D, turn proportions) –Apply HCM methodologies Shortcomings –Estimating future turning volumes can be challenging –Repeat process for each alternative –Does not accurately reflect capacity constraint effects –Hard to predict traffic redistribution due to network changes

Analysis Approach Microscopic Simulation –Too much detail at preliminary engineering level –Hard to predict traffic redistribution due to network changes –Too costly

New Approach – Dynamic Traffic Assignment Model Meso-scopic traffic assignme nt –Based on TDM O-D tables –Model large area with greater detail than TDM Turn lanes/movements Traffic flow characteristics Signal and stop control –Generate more accurate routing and demand estimates

Which DTA Model? Dynasmart, DynusT, other proprietary models Preliminary, uncalibrated regional DynusT model available from PAG

Modeling Process TDM Model TDM Model RDTA Model DUE Subarea Modified Subarea Calibrated Subarea Link Analysis Calibration Future DTA Model DUE Subarea Modified Subarea Calibrated Subarea Link Analysis Modify Calibration QC Apply calibration results to the future model Validate Outputs Validate Outputs Vols Delay Travel Time Queuing Outputs Vols Delay Travel Time Queuing HCS Synchro Microsim ulation HCS Synchro Microsim ulation Modify Existing Future Model Refinement Future ODs Synchro Travel Time Runs

Subarea Model

Model Calibration Data collection –Link ADT’s –Saturation flow rates –Peak hour TMC’s –Freeway speed and density –Travel time

Model Calibration Traffic model calibration –Saturation flow rates –Speed-density curves OD table calibration –Peak period link volumes (DynusT utility) –Peak hour TMV’s (DynusT utilities, adjust centroid connectors, and manual O/D adjustments)

Calibration

Future Models 2040 am & pm –Determine freeway, frontage road, interchange, and cross road capacity and traffic control needs –4 network alternatives –Synchro and HCM freeway methodologies 2015 am & pm –Evaluate implementation phasing alternatives

Alternative Implementation Scenarios Typical Construction Phasing Baseline Phase 1Phase 2Phase 3Phase 4 Ina Road TIExisting Closed Orange Grove Road TIExisting ClosedNew Sunset Road TIExistingClosedNew Ruthrauff Road TIClosedNew Work Zone –3 mainline lanes each direction –Crossroad, frontage roads, ramps – fully closed –55 mph approaching WZ, 45 mph through WZ

Implementation Phasing MOEs MOEs: total network travel time, v/c ratios at signals, and mainline travel speed

Results DTA modeling met the project’s objectives –Improved traffic projections –Quantifiable construction phasing strategies –Specific recommendations to minimize traffic impacts during construction –Cost effective and efficient modeling approach –Model is available for work zone evaluation during construction Refinement of regional and subarea network is important DTA output can potentially replace the need for HCM analysis step

Costs I-10 Corridor Study - $150K –Extensive data collection (ADT, sat flows, travel times) –Existing, 2015, 2040 AM/PM subarea models –4 network scenarios, 4 construction phasing options I-96, Newburgh Rd to US-24, Michigan - $250K –Regional DTA model –Construction phasing options for I-96 corridor

The Future of DTA DTA modeling supports : –Activity-based modeling –MOVES – advanced air quality modeling –More systematic prioritization of TIP projects DTA can be integrated with microscopic simulation to better model complex scenarios Multi-resolution modeling) – on-going FHWA initiative MPOs are building calibrated regional DTA models

Thank You! Questions/Comments