W A RNR WASTE AND RECYCLING NATIONAL REPORTING. Current NZ Position No national database Lack of consistency, methodology and frequency - OAG report Historically.

Slides:



Advertisements
Similar presentations
Statistics NZs experience in using Administrative Data in an Integrated Programme of Economic Vince Galvin General Manager Strategy & Communications.
Advertisements

Business Resource Efficiency and Waste (BREW) Programme Mark Atherton Head of Sustainable Development Northwest Regional Development Agency Nick Storer.
Central Bureau of Statistics Environment Protection Expenditure in Israel Dr. Moshe Yanai Yaniv Sharabi Agriculture and Environments Sector.
The White Rose Collaborative Collection Partnership Brian Clifford University of Leeds.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
Food & Beverage Sector Group Enterprising Manukau Sustainable Management Fund Food & Beverage Sector Organic Waste Project.
Key Considerations for Report Generation & Customization Richard Wzorek Director, Production IT Confidential © Almac Group 2012.
1 High Production Volume (HPV) Challenge Program – Future Directions Jim Willis Director, Chemical Control Division, Office of Pollution Prevention and.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Infrastructure Projects Facility in the Western Balkans Part of the Western Balkans Investment Framework Facility funded by the European Union TA-ALB-10.
Nu Project Management Office A web based tool to Manage Projects.
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm VP, Director Lean Enterprise Consulting February 22, 2010.
What SMS means for an Operator’s relationship with the CAA
Portfolio Manager 101. Learning Objectives In this session, you will become familiar with EPA’s ENERGY STAR ® Portfolio Manager ® tool and learn how to:
Wenxin Zhang Department of Civic Design University of Liverpool
Australian Perspective: EGSS Developments and Application Issues Peter Williams Assistant Director, Centre of Environment Statistics (P)+61 (0)
Measuring recycling in the UK Cindy Lee Waste Data Strategy Manager.
Digital Site Management for the Product Management Department (Concurrency Corporation)
UN-Water Water Country Briefs Introduction & Background Frederik Pischke Interagency Water Advisory UN-Water Frederik Pischke Interagency Water Advisory.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
4-7 June 2006NATO-CCMS Pilot Study, Athens Contaminated Land in Greece Recent Developments Nymphodora Papassiopi NATO-CCMS Pilot Study Tour de Table -
LOCAL BUFFER SUPPORT PROGRAM 1 May 2014 MAV. Liveability, growth and waste As Melbourne continues to grow, we need secure the right mix of resource recovery.
+ Facts + Figures: Your Introduction to Meetings Data Presented By: Name Title Organization.
A Commercialization Measurement System Jim Tolle Verisystem.
Partnership for Urban South Hampshire Sustainable Growth.
A Review of Waste Needs Assessment for New Waste Treatment Processes CIWM Cymru Wales & NW Centres Autumn Event 2010.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
Australian Battery Recycling Initiative Strategic Plan April 2014.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
An Online Knowledge Base for Sustainable Military Facilities & Infrastructure Dr. Annie R. Pearce, Branch Head Sustainable Facilities & Infrastructure.
TRP Chapter Chapter 5.4 Facility development.
ActivityInfo Introduction. ActivityInfo? ActivityInfo is an online tool for monitoring humanitarian projects to help humanitarian organizations to: collect.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
AGRECOVERY The Agrecovery Story so far … Graeme Norton, 3R Group Ltd.
Using Franchise Inventory Tracking System (FITS) Better Pipeline Management & Development Forecasting.
FUNCTION 5: MONITORING M5 – S1. 1.Situation Monitoring 2.Humanitarian Response Monitoring 3.Coordination Performance Monitoring Types of Monitoring.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Scottish Waste Awareness Group Waste Aware University Amanda Ingram, Senior Campaigns Officer.
Resource Efficient Construction Richard Buckingham Head of the Built Environment WRAP BASE London 11 th July, 2013.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Health Quality Ontario: Health System Performance New Zealand Master Class March 25, 2014.
Ministry of Environment Environmental Protection Branch Solid Waste Management Strategy November 2015.
Validated Self Evaluation of Alcohol and Drug Partnerships Evidencing Implementation: The Quality Principles – Care Inspectorate/The Scottish Government.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Screening Potential Sites: Electronic Decision Tree tool 1 Purpose: To screen sites for suitability for a solar PV or wind energy project.
The Canadian Geospatial Data Infrastructure Presented by Prashant Shukle Director General Canada Centre for Mapping and Earth Observation.
Key Findings from May & July 2008 WRAP Technical Workshops September 30, 2008 Steve Arnold, Colorado DPHE & Bob Kotchenruther, EPA R10 (Co-Chairs, WRAP.
Becoming more efficient & effective post amalgamation for compliance in the Stormwater Unit. Presented by: Abhilasha (Abby) Sharma Auckland Council Infrastructure.
National 4-H Common Measures Suzanne Le Menestrel, Ph.D. National Institute of Food and Agriculture, USDA Jill Walahoski, Ph.D. University of Nebraska-Lincoln.
TIER IT Inventory CITI Meeting November 6,
Purpose of the EQual benefits mapping workshop To identify the benefits that will be delivered by EQual and gain consensus on which ones are the most important.
Advanced Data Planning Tool Rajiv Ranjan Technical Programme Officer PARIS21.
Local buffer support Program
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
First Nation Waste Management Initiative
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
General presentation of SMART GROUND project
SMART data collection and inteGRation platform to enhance availability and accessibility of data and infOrmation in the EU territory on SecoNDary Raw Materials.
Georgia Update Jeff Cown Land Protection Branch
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Local buffer support Program
Sixth Power Plan Setting Conservation Targets and Implementation Strategies Jill Steiner, Snohomish Public Utility District Northwest Power and Conservation.
Circular Economy -Public Consultation – Results
Stakeholder Engagement
Presentation transcript:

W A RNR WASTE AND RECYCLING NATIONAL REPORTING

Current NZ Position No national database Lack of consistency, methodology and frequency - OAG report Historically - SWAP completed across test sites and extrapolated OWLS – online waste levy system Waste space is data rich

Internationally Strategic issue of data collection and reporting well recognised Regulatory frameworks Economic instruments Data collection models

Concerns Risk EaseCost Sweet spot

Key considerations Risk Commercial exposure and sensitivity Governance: systems and information sharing Ease (of use) Easy web-based access Consistent reporting outputs Ability to upload historic data Cost Low cost – demonstrate a cost benefit Resource commitment

What is WaRNR? Web-based tool Robust system and user governance levels Collect total waste data Links industry data to SWAP Aligns with industry practices and international reporting standards Recognises waste as ‘products’ – similar to supermarket SKUs Provides aggregated reporting Display formats: pie chart, bar chart and data tables Outputs: printed, export to excel, HTML onscreen Modular in design

Data collection Total waste - not just waste to landfill  Volume  Composition (Primary or secondary classification levels) Infrastructure database Recognises user governance framework and business rules

Evolution of the data model Waste is a series of products Data becomes richer as it moves through the model Richer data is linked to ‘Operator Type’ Operator Type or Roles provide the framework

Richer data collection

Reports Waste by Composition and Volume Potentially Divertible Materials from Landfill Recyclables by Composition and Volume Waste Data Gaps Closed loop waste reporting Performance to Targets and Benchmarks by Composition and Volume

Drilling into the detail Waste by Composition and Volume Receiver type: Landfill, Cleanfill, Market, All Regional level: National, Regional, Specific landfill Receiver: Filtered by Regional selection, single or multi-select Waste classification: SWAP P/S or SIMPLE P/S Start/end dates: User selected range of dates Report output: % Pie and table, bar chart and data table Census Data: includes the per person data from the census

Outputs

Strategic Benefits National database: volume, composition and infrastructure Evidence-based platform for improved:  Analysis  Decision making  Strategic review and deployment  OECD reporting  Industry surveys  Regulatory impact statements  Environmental report cards

Future potential MODULAR DEVELOPMENT Construction & demolition waste Liquid & Hazardous waste Contaminated sites DATABASE DEVELOPMENT Record consent conditions and status or waste disposal facilities Recording of councils progress against their waste minimisation and management plans and other waste-related activities

Current status Completed phase one Working to obtain necessary funding Then commence phase two and three concurrently

Moving forward WasteMINZ: ‘Guardian of the data’ Secure funding partner Broaden stakeholder engagement Commence system development Form technical advisory group Manage data collection Commence pilot Rollout