district development Tanzania – Lake Victoria Greenstone Belt.

Slides:



Advertisements
Similar presentations
DOROTHEA PROJECT NORTHWEST ONTARIO A LARGE TONNAGE, LOW GRADE, PORPHYRY GOLD-COPPER-MOLY- SILVER SYSTEM.
Advertisements

Sekenke Property –Tanzania - Highlights
Olukunle Amoo BestKamco Resources, Toronto, Canada
Tanzania Royalty Exploration Corporation
NGURUPAI PROJECT.
Murray River Project Update Coal Forum October 2013.
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
1st Quarter 2012 Results May 10, 2012 Tom Mair President and CEO.
Targeting First Gold Dore Q1 2014
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
TRANS-SIBERIAN GOLD PLC 30 June 2014 Annual General Meeting TRANS-SIBERIAN GOLD.
World’s largest undeveloped tin deposit in Kazakhstan.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
CHAMPION BEAR RESOURCES EXPLORING ADVANCED STAGE PRECIOUS METAL PROJECTS IN ONTARIO Exploration Update January 2010.
June 29, 2007 Research Capital Presentation Alex Pannu Iain Brown Jim Simpson John Braden DISCOVERY-CORP ENTERPRISES INC.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Geological Issues at the OK Tedi Mine Keith McGregor Sophie Price.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
Perlat Project Volcanogenic Massive Sulphide Copper, Gold, Silver, Zinc Mr. Zahir (Zip) Dhanani Chairman, CEO and Director Mr. Robert Naso General Manager.
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
1 Annual General Meeting November What we’ve done Where we are Barra Resources Ltd The Year in Summary  High Grade Wahloo Shoot discovered at.
NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine.
SEPTEMBER 2009 EXPLORING IN THE SHADOW OF TANZANIA’S WORLD-CLASS GOLD MINES.
ZIMASSET AWARENESS SEMINAR FOR MEMBERS OF THE PARLIAMENT OF ZIMBABWE MARCH 2014.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
September 2014| CORPORATE PRESENTATION. This presentation contains forward-looking statements concerning future operations of Falcon Gold Corp. (“the.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
November Certain information contained or incorporated by reference herein, including any operating performance of Lion One Resources Inc. (“Lion.
TSX-V: OCO Frankfurt: OR6
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Directors Directors / Management Bongani Mbindwane (Chairman & CEO), BA (Law), Dip. Environment Management Joshua Hattingh (Executive Director - Tech),
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
November 11, 2004 Biogeohydrological Environment and Physical Aspects of the Henderson Mine Site Climax Molybdenum Company Henderson Operations.
Ramping-up to Full Capacity Investor Presentation February 2009.
1 Peru Minerals Sector Update Trade and Investment Group London 30 January
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
SYDNEY MINING CLUB CLUB 5 DECEMBER Outline of Presentation  the answer  the question  the explanation:  How we got here  Coal cash flow leverage.
February Project Location The Company ●Platinum exploration in the PGM rich, Bushveld Complex ●Bushveld Complex houses 75% of the world Platinum.
Izok Corridor Project: Kitikmeot Community Visit
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
MINERALS CORPORATION The Beginning of Chapter 2… June 2009.
Company Overview Over 100 years of exploring, developing and mining precious and nonferrous metals Operate mines and process metals in the U.S., Mexico.
World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE Anglo Platinum 28 November 2002.
RED LAKE ONTARIO 10 M oz Gold Production km N McCUAIG JV PROJECT Golden Tag Resources Ltd.
Sian Gold Project – Ghana BRIEF SUMMARY June 2009.
Frederic Guerin General Manager, Mine Projects AREVA Resources Canada Inc. Iqaluit April 19, 2012 The Kiggavik Project: Challenges in designing uranium.
Eeding in Afr Simon Village, Chairman Mine Africa – 8 th Annual Mining Seminar Toronto March 9, 2010 The African Resource Development Cycle.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Nicholas-Denys Project Ann’s Creek property New Brunswick, Canada Nicholas-Denys Project Ann’s Creek property New Brunswick, Canada
M E R I D I A N G O L D I N C. 1 Amancaya – Central Vein Long Section.
…investing for pure gold profits BMO Capital Markets Feb 2008.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
Exploiting market opportunity or building profitable businesses?
TRANS-SIBERIAN GOLD PLC Annual General Meeting
COMPANY SNAPSHOT Listed Dec 2003 ASX: MML, MMLO Strategy
Investor Presentation – SEPTEMBER NGM:TSX-V
Figure 1 General Project Location
Developing a Canadian Gold Deposit
EV Battery Metals Nickel Copper Cobalt Lithium
BOARD Chris Creagh Mr Creagh is a geologist with more than 30 years of experience in the Australian and international mining industry. Chris brings significant.
Principal Projects - Mexico
SAN LUCAS PROJECT Technical Data 1/18/2019 TSX-V MNN.
Company Overview (GUY)
Capella Resources Ltd TSX.V: KPS December 15, 2009.
Presentation transcript:

district development Tanzania – Lake Victoria Greenstone Belt

Bulyanhulu Barrick Properties Barrick Properties district development Tanzania – Lake Victoria Greenstone Belt

Pangea properties Pangea properties Bulyanhulu Barrick properties Barrick properties Pangea properties district development Tanzania – Lake Victoria Greenstone Belt

regional geology Tanzania – Lake Victoria Greenstone Belt GEITA BULYANHULU 10.5 Moz reserve Barrick Gold Corporation GOLDEN PRIDE

district development Tanzania – Lake Victoria Greenstone Belt Geita Bulyanhulu Tulawaka Golden Pride Sekenke Musoma

Bulyanhulu district development Bulyanhulu Golden Ridge 21 licenses 2,000 sq. km.

Sekenke district development 26 licenses 2,400 sq. km. Sekenke

Geita district development 18 licenses 1,200 sq. km. Geita Mine Bulyanhulu

Tulawaka district development Bulyanhulu Tulawaka 14 licences 1,000 sq. km.

Geita Bulyanhulu Tulawaka Golden Pride Sekenke Musoma district development Tanzania – Lake Victoria Greenstone Belt

Tulawaka district development Bulyanhulu Tulawaka 200 km. to Bulyanhulu 1 million oz. resource grade of 19 g/t

Tulawaka longitudinal section – east zone TDD 15 TDD 17 TRC 499 TRC 514 TRC 511 TRC 510 TDD 38 TDD 12 TDD 39 TDD 50 TRC 503 TDD 28 TRC 466 TRC 504 TRC 467 TRC 486 TRC 484 TRC 485 TDD 20 TRC 488 TRC 489 TDD 27 TRC 490 TRC 498 TRC 508 TRC 509 TRC 491 TRC 487 TDD 36 TDD 37 TDD 33 TRC 500 TRC 502 TRC 501 TDD 41 TDD 35 TDD 31 TDD 42 TDD 34 TDD 26 TRC 469 TRC 505 TRC 471 TRC 470 TRC 507 TRC 506 TDD 24 TDD 32 TRC 441 TDD 21 TDD 19 TDD 25 TDD 29 TRC 512 TRC 513 TDD 49 TDD 16 TDD 13 TDD 14 TDD 40 TDD 47B TDD 52W1 TDD 30 TDD 51 L 4+00 WL 3+00 WL 2+00 W L 1+00 W L 0+00 L 1+00 E L 2+00 EL 3+00 E L 4+00 E L 5+00 W L 6+00 W Surface Mineralized Zone 100 m New Vein Area Mineralized Zone 1200m El. 1150m El. 1100m El. 1050m El. 1000m El. 950m El. 900m El. www www www www www www ww previous borehole intercept recent borehole intercept proposed borehole intercept

Tulawaka longitudinal section – east zone TDD 15 TDD 17 TRC 499 TRC 514 TRC 511 TRC 510 TDD 38 TDD 12 TDD 39 TDD 50 TRC 503 TDD 28 TRC 466 TRC 504 TRC 467 TRC 486 TRC 484 TRC 485 TDD 20 TRC 488 TRC 489 TDD 27 TRC 490 TRC 498 TRC 508 TRC 509 TRC 491 TRC 487 TDD 36 TDD 37 TDD 33 TRC 500 TRC 502 TRC 501 TDD 41 TDD 35 TDD 31 TDD 42 TDD 34 TDD 26 TRC 469 TRC 505 TRC 471 TRC 470 TRC 507 TRC 506 TDD 24 TDD 32 TRC 441 TDD 21 TDD 19 TDD 25 TDD 29 TRC 512 TRC 513 TDD 49 TDD 16 TDD 13 TDD 14 TDD 40 TDD 47B TDD 52W1 TDD 30 TDD 51 L 4+00 WL 3+00 WL 2+00 W L 1+00 W L 0+00 L 1+00 E L 2+00 EL 3+00 E L 4+00 E L 5+00 W L 6+00 W Surface Mineralized Zone 100 m New Vein Area Mineralized Zone 1200m El. 1150m El. 1100m El. 1050m El. 1000m El. 950m El. 900m El. www www www www www www ww previous borehole intercept recent borehole intercept proposed borehole intercept

Tulawaka section – W bore hole intersection assay = g/t Au / m bore hole intersection assay = g/t Au / m gold zone 50 N 150 N250 N 1050m 1100m 1150m upper saprolite bedrock lower saprolite surface laterite 25 m Talus zone TRC 253 TRC 251 TRC 252 TRC 250 TRC 108 TRC 341 TRC 344 TDD /5m 4.90/8m 1.57/1m 25.84/14m 11.10/1m 8.36/4.22m /2.69m VEIN B VEIN A

Bulyanhulu district development 21 licenses 2,000 sq. km. Bulyanhulu Buly South Itetemia

surface geology RAB results drilled with core significant RAB results significant RAB results over reef 1

development december 31, 1998 reserves: 3.7 million oz. 1 km.

development december 31, 1999 reserves: 7.5 million oz. reserves & resources: >10.4 million oz. reserves: 7.5 million oz. reserves & resources: >10.4 million oz. 2 km. 1.2 km.

development august 31, 2000 reserves: 10.5 million oz. reserves & resources: >12.0 million oz. reserves: 10.5 million oz. reserves & resources: >12.0 million oz. 2 km. 4 km.

september, drills working – 18 definition, 2 exploration 2 km. KMC-615B 2.63 m 16.25g/t KMC m 25.85g/t KMC-727A results pending KMC–590D in progress KMC–640D 2.56 m 25.11g/t KMC m 5.18g/t KMC–699 results pending KMC–693A 3.78 m 6.34g/tKMC-700E 2.48 m 19.42g/t

september, drills working – 18 definition, 2 exploration 2 km. KMC-615B 2.63 m 16.25g/t KMC m 25.85g/t KMC-727A results pending KMC–590D in progress KMC–640D 2.56 m 25.11g/t KMC m 5.18g/t KMC–699 results pending KMC–693A 3.78 m 6.34g/t 7 km.KMC-700E 2.48 m 19.42g/t

phase I development update general overview april 2001 startup on budget

phase I development update infrastructure 138 km powerline completed water pipeline commissioned

phase I development update process facilities construction of plant and infrastructure 67% complete all major equipment is on site mill startup 2001

phase I development update potential for expansion 4,000 tonnes per day 6,000 tonnes per day

phase I development update shaft sinking production shaft at 320 meters first station excavated shaft in production in 2Q, 2001 three ventilation shafts completed

phase I development update underground development 9,300 meters completed – 25% over feasibility 3 Tanzanian development crews

phase I development update underground development grades consistent – thickness 10% greater 121,000 16g/tonne stockpiled

phase I development update training / staffing 50 Tanzanian development operators trained 60 Tanzanians in training for process and maintenance expatriate recruitment nearly complete

phase I development update community and environment employee housing World Bank environmental standards

2 km. 4 km. MAIN phase I EAST phase II

phase II east zone 12/13 grams per tonne tpd mining rate adds 100,000 oz. to production decline to begin early months to access ore

phase II east zone 2002 program delineate current reserve carry out further exploration begin development 2003 production $40 million capital expenditure

2 km. 4 km. WEST phase III MAIN phase I phase IV EAST phase II

phase III west zone surface drilling to date greater widths / higher grades requires main shaft to access zone by drift phase IV deep main zone great holes at depth develop later in decade

property summary present total cash costs: $130 per /oz total production costs: under $200 per /oz potential increase reserves reduce costs