Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Geoff Pile LCLS Fixed support IDR 12 th January 2006 LCLS Fixed Support IDR Introduction and History Are special fixed supports needed?
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC: SUT Status & Plans 20 th / 21 st April 06 Single Undulator Test Status/Plans April 06 Geoff Pile.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Stephen Milton 12 Jan IDR of Undulator System Fixed Supports 12 Jan
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Magnetic Measurements At SLAC
Magnetic Measurements For The LCLS Undulator System
Communication and Documentation Needs exemplified on WP 71
Undulator System Installation
LTU/Undulator Installation Status
Undulator Scope, Management, and Organization
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Production Management
E-Beams Systems Manager
LTU/Undulator Installation Status
Undulator Long-Lead Procurement Preparation
Undulator System Overview
Undulator Integration Test Status
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Undulator Alignment Plan
Alignment Diagnostic System Status
e-Beams Systems Update
Undulator Systems Integration
LCLS Undulator Scope, Management, Organization
LCLS Undulator Magnetic Measurements
Presentation transcript:

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC

Undulator System October 12-13, 2006 FAC Meeting 2 UNDULATOR CELL ASSEMBLY NEXT CELL UNDULATOR SHOWN FOR CLARITY By Scott Doran, ANL

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 3 UNDULATOR CELL ASSEMBLY NEXT CELL UNDULATOR SHOWN FOR CLARITY By Scott Doran, ANL

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 4 Schedule

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 5 Collaboration Roles and Responsibilities (abridged) ANL – Stephen Milton Design the System and Sub-assemblies minus WPM/HLS Supply Designed Sub-assemblies Provide Expertise SLAC Metrology – Robert Ruland Design and Supply WPM/HLS System Undulator Tuning & Quadrupole Measurement Develop and Test Fiducialization Procedures Provide Expertise SLAC Assembly & Installation – Ben Poling Girder Assembly System Installation Material Handling and Storage Provide Expertise

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 6 Undulator Assembly & Installation Supervisor Ben Poling Responsibilities include: Material handling and assembly planning and execution Assembly and QA documentation Space and personnel resource planning

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 7 Assembly, Install, & Storage Space B750 – Storage/Assembly B081 – MMF Tuning/Fiducialization Undulator Tunnel

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 8 Undulator System Girder Assembly Field Installation Precise/Vacuum Assembly performed in a control environment

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 9 Girder Assembly Flow

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 10 SLAC Magnetic Measurement Facility Wolf, Zachary, LCLS Management Presentation, April 11, 2006, Slide 3 Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Assembly Area Storage and Queuing LCLS-TN-04-1

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 11 Undulator Magnet Handling Cart - For Use In MMF - Out For Quotation

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 12 Installation Cart Concept -For Undulator Hall Use - Concept Under Review

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 13 Traversing the BTH East Entrance Maze UNDULATOR HALL Entrance BTH

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 14 Material Handling Crate Concept -For Use In B750 Pit -Concept Under Review

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 15 Process Travelers Traveler Drafts Out For Review Undulator Tuning & Fiducialization Girder Assembly BFW Fiducialization Quadrupole Measurement & Fiducialization Pedestal Assembly CAM Assembly Inventory Database Physical location tracking Quality Assurance data collection Installation location mapping

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 16 Next Six Months Production Control Communication Geoff Pile is developing a tool. Release document transfer process is in place. Exact Statement of Work content will solidify scope of SLAC work. WPM mockup operational in B750. Material handling equipment in place. 50% of Undulators RFI. Component deliveries beginning.

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 17 Next Six Months (2) HLS/WPM Final Design Review – 1/07 HLS/WPM Procurements Placed Girder Assembly and Component Fiducialization Plan complete Tooling designed and ordered Production Drawings and SOW’s archived at SLAC Cable Plant Preliminary Design Review Complete – Long Lead Procurement Placed Pedestal installation Statement of Work out for bid

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 18 End of Presentation

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 19 SHORT BREAK By Scott Doran, ANL

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 20 SHORT BREAK CROSS SECTIONS By Scott Doran, ANL

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 21 LONG BREAK By Scott Doran, ANL

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 22 LONG BREAK CROSS SECTIONS By Scott Doran, ANL

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 23 Girder Assembly Prerequisite All necessary components fiducialized Stands aligned in all staging areas Outside MMF (possibly in Building 750) following the SPEAR3 Approach as suggested by Richard M. Boyce Step 1 Prepare Girder: Mount CAM wedges under girder Step 2 Component Installation, part 1 roll-away slides, component supports HLS & WPM components undulator vacuum chamber Step 3 Component Installation, part 2 quadrupole, BFW and BPM Step 4 Wiring / Plumbing In the Controlled Environment of the MMF Step 1 Optical Alignment Step 2 CMM Storage LeCocq, Catherine, October 27-28, 2005, FAC Meeting, Slide 13

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 24 Component Delivery Schedule