Cathedral Area Historic District Project Breaking A 50-Year Impasse:

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

An Overview of the Complete Streets Concept and a Review of NCDOT’s Proposed Complete Streets Guidelines PHC COMPLETE STREETS.
Downtown Access Improvements Plan Town of Hillsborough 2014.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Highway 76 Complete Streets Project Study Session February 7, 2013.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
Michener’s Chesapeake Scenic Byway Corridor Management Plan.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
TH 100 Visual Quality Advisory Process VQAC Meeting One 6 December 2012.
Planning & Community Development Department Update on Mansionization and Neighborhood Compatibility Study City Council January 26, 2015.
Residential Streets Overall Residential Street Image Residential Streets - Planting Strips Residential Streets - Sidewalk Width Next, participants assessed.
Juneau Downtown Tourism Transportation Study May 27, 2003.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
CREATING THE ENTERPRISE SOCIAL MEDIA GAME PLAN September 2013.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
When Seconds Count… Physician Anesthesiologists Save Lives.™ Storytelling and Colleague Engagement Presented by Joseph LaMountain Date: 6/26/2014.
Site Map Learning Kit Around the roundabout Videos Activities Bend Projects Empire Cooley/18th Reed/15th Planned Projects Completed Projects How to Make.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
City of Auburn Streetscape: A Complete Street Presented by: Ed Armstrong, RLA.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Project Overview O CTOBER 27 TH, 2009 Presented to:
South Lake Union Urban Design Framework Report to the Seattle Design Commission September 17, 2009.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
City of Suwanee 2030 comprehensive plan. TODAY’S AGENDA Process Update Community Agenda Framework “Compass” Review  Images and Questions  Comp Plan.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Context Sensitive Solutions Focus Group Session Lynn Purnell Parsons Brinckerhoff Prosperity Church Road Corridor December 8, 2005.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
Arsenal Terminal Development Follow-Up Meeting February 25, :30 pm – 8:00 pm NREC.
Central Park MASTER PLAN UPDATE CITY COUNCIL / PARK & RECREATION COMMISSION MEETING JUNE 16, 2014.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Highlights  Describe Our Missoula Growth Policy Project  Relationship to Rattlesnake Neighborhood Plan  Next Steps.
Green2015 An Action Plan for 500 New Acres. access to parks (source: WRT)
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Complete Streets in Chapel Hill Public Input Work Session November 17,
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
SMART URBAN FUTURES PRESENTATION
Project Management Team Meeting #3
Saskatoon South Perimeter Freeway Information Session
Public Workshop #1 August 18, 2010.
SMART URBAN FUTURES PRESENTATION
Developing a Pedestrian -Bicycle Safety Action Plan
Sarno Road Corridor Study
A/Professor Michael Greco
Help Shape the Future of Downtown Sumner
Arsenal Terminal Development Follow-Up Meeting
Presentation transcript:

Cathedral Area Historic District Project Breaking A 50-Year Impasse:

Cathedral Area Historic District Project Project Background / History Longest North-South Arterial Street in Bismarck, ND 5-Lane Roadway on North & South Ends Narrows to a 30’ 2-Lane Through Historic District Crumbling Infrastructure LOS F Neighborhood Stopped City Widening Plan in 1950’s Repeated Projects Failed

Cathedral Area Historic District Project A New Approach Emerges City Approaches the Neighborhood Forms A Washington Street Working Group Discussed How To Approach Starting A Potential Project Result: Neighborhood Wanted A Process To Provide Input On EVERYTHING!

Cathedral Area Historic District Project Seek To Understand, Then Be Understood Created A Stakeholder Advisory Committee (SAC) 5 Public Input Meetings Interactive Website with On-Line Public Opinion Survey Direct Mail Brought in News Media as Partners

Cathedral Area Historic District Project Schedule Public Input Meeting #1 Feb. 9, 2006 Public Input Meeting #2 Feb. 21 Design Charrette Feb Public Open HouseFeb. 22 Public Input Meeting #3 Feb. 23 Public Input Meeting #4Mar. 30 Public Input Meeting #590% Plans, Fall 2006 Construction2007

Cathedral Area Historic District Project SAC Open To Anyone – No Limit Must Agree To Rules: –Must Commit To Attending All Meetings –Keep An Open Mind, No Criticism –Must Participate In Ideas and Discussions –Must Discuss Project With Others and Report Back With Input Open Roster Helped Establish Credibility!

Cathedral Area Historic District Project SAC Listening Sessions Story Telling – What Makes A Sense of Place Personal & Historic Photos News Clippings/Articles Presentation of Historic District Key Features & History by SAC Volunteer Walking Tour of District & Buildings

Cathedral Area Historic District Project Public Streetscape Survey 456 Surveys Distributed –Available on Website 120 Survey Responses Received –20 Surveys Incomplete Response Rate = 26% Prioritization of Project Goals –Tree Preservation (17%); Left turn lane (16%); Streetscape Maintenance (15%); Seek public input/keep the public informed (15%) Preference of the Level of Detail of Streetscape Elements –High and Moderate

Cathedral Area Historic District Project Public Comments Received Avoid Impacting the Trees. Pedestrian Safety and Controlled Traffic Speeds Should Remain Top Priorities. Like to See the District Enhanced but not ‘Themed’.

Cathedral Area Historic District Project Public Comments Received This Section of Town Holds Bismarck’s History – Once Gone – it Will be Very Difficult to Restore. The Public has Set a High Priority that the Widened Street not Bisect Neighbors in the East from Those in the West…We are Concerned about PEOPLE Being Separated from PEOPLE. Widen the Street as much as Possible.

Cathedral Area Historic District Project Challenge: “Preserve the Memorable Streetscape Experience” Condensed Project Goals: –Infrastructure Improvements –Neighborhood Character

Cathedral Area Historic District Project Infrastructure Improvements Utilities Improvements –Opportunity to Upgrade Roadway Related Recommendations –Accommodate 20 year design life –Address Traffic Speed and Flow –Slow In-Bound Traffic –Focus on Pedestrian Conflict Zone –Emergency Vehicle Needs –Visibility and Lighting

Cathedral Area Historic District Project What Is Primary Need Of Corridor? To Move High Volumes Of Traffic As Quickly As Possible? To Provide A Safe Corridor For Motorists & Pedestrians, While Providing An Acceptable Level Of Service To Corridor Traffic?

Cathedral Area Historic District Project How We Got There Establish and Maintain Sincerity & Credibility Open Participatory Process Design Charrette Visualization Graphics Commitment

Cathedral Area Historic District Project Design Charrette

Cathedral Area Historic District Project Neighborhood Character

Cathedral Area Historic District Project Neighborhood Character

Cathedral Area Historic District Project Neighborhood Character

Cathedral Area Historic District Project Neighborhood Character

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Visualization

Cathedral Area Historic District Project Lessons Learned: Begin Early Open Dialogue: –To Determine Support To Consider Developing a Plan Open Invitation For SAC: –Everyone is a Stakeholder, Build Credibility Through Open Participation

Cathedral Area Historic District Project Lessons Learned: Establish Rules For SAC: –Requires a Commitment From Squeaky Wheels, Doesn’t Just Provide Another Platform For Them. Seek To Understand, Then Be Understood: –Improves Communication and Builds Empathy Both Ways

Cathedral Area Historic District Project Lessons Learned: The Open House Design Charrette: –Capitalize on an Interactive, Collaborative Design Concept Process The Power of Visualization: –A Picture Is Worth A Thousand Words –Used in the Planning, Design, and in the Final Project Features as Seen By The Users

Cathedral Area Historic District Project Lessons Learned: Bring the News Media as a Partner: –Tell Them How You Would Like Them to Participate, Provide Them Graphics, Etc. Commitment: –You Say You Are Going To Preserve Trees? Prove it!

Cathedral Area Historic District Project Lessons Learned: Keep The Momentum Going! –Frequent Meetings Build Enthusiasm & Synergy

Cathedral Area Historic District Project