Www.dmp.wa.gov.au/ResourcesSafety Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.

Slides:



Advertisements
Similar presentations
New Nuclear Build - Economic Regulation? Gregg Butler Director: Integrated Decision Management Ltd Professor of Science in Sustainable Development, University.
Advertisements

Pipeline Qra Seminar Title slide Title slide.
Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Information Risk Management Key Component for HIPAA Security Compliance Ann Geyer Tunitas Group
Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.
Please read this before using presentation This presentation is based on content presented at the Six Pillars of Dangerous.
Please read this before using presentation This presentation is based on content presented at the Six Pillars of Dangerous.
Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshows.
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
Please read this before using presentation This presentation is based on content presented at the Drillsafe Forum held in September 2009 It is made available.
PPRT PREVENTION DES RISQUES ET LUTTE CONTRE LES POLLUTIONS Safe Communities & a Sustainable Hazaedous Industry : Present and Future Discussion.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
1 Risk evaluation Risk treatment. 2 Risk Management Process Risk Management Process.
Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.
Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Please read this before using presentation This presentation is based on content presented at the industry information.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT RISK ACCEPTANCE CRITERION 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Please read this before using presentation This presentation is based on content presented at the Registration of cranes.
Opportunities & Implications for Turkish Organisations & Projects
1 Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.
Please read this before using presentation This presentation is based on content presented at the Exploration Safety.
2009 Mines Safety Roadshow Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow held.
Ship Recycling Facility Management System IMO Guideline A.962
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
Please read this before using presentation This presentation is based on content presented at the Exploration Safety.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
Department of Consumer and Employment Protection Resources Safety 1 Please read this before using presentation This presentation is based on content presented.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Corporate Governance Yoshi Kawai Secretary General, IAIS IAIS-ASSAL Regional Seminar Buenos Aires, Argentina, November 2011 PUBLIC.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Software Project Management
1 Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
RISK MANAGEMENT The process of weighing policy alternatives in the light of the results of risk assessment and, if required, selecting and implementing.
Hazards Identification and Risk Assessment
Risk Management Approaches to Hydrogen Safety. Risk Assessment, Limbo Dancing, and ALARP Les Shirvill.
HU151: Industrial Safety Prof. Abdelsamie Moet Fall 2012/13 Pharos University in Alexandria Faculty of Engineering Lecture 3: Risk Acceptance.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
1 Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Risk Estimation Two distinct categories of Risies Voluntary Risks e.g. driving or riding in an automobile, and working in an industrial facility. Involuntary.
Objectives Students will be able to:
1 Please read this before using presentation This presentation is based on content presented at the Exploration Safety.
ABGR XI International Risk management and Insurance Seminar “Introduction to Risk Management” ALARYS Latin American Risk Management Foundation (FUNDALARYS)
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
1 Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
1 Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
OHSAS Occupational health and safety management system.
Fibrous minerals and dust – managing the risks Part 2 Dust management in drilling operations.
1 Please read this before using presentation This presentation is based on content presented at the Exploration Safety.
Risk Assessment: A Practical Guide to Assessing Operational Risk Chapter 20: Global Perspectives.
Please read this before using presentation
Project Quality Management
OH&S Plant Obligations make
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
ALARP: when is enough, enough?
Training Course on Integrated Management System for Regulatory Body
Air Carrier Continuing Analysis and Surveillance System (CASS)
HSE Case: Risk Based Approach.
Internal control - the IA perspective
بسم الله الرحمن الرحیم.
Presentation transcript:

Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing Approval Times: What is “Reasonably Practicable”?, held on 14 November 2014 It is made available for non-commercial use (e.g. toolbox meetings, safety discussions) subject to the condition that the PowerPoint file is not altered without permission from Resources Safety or Graham Bower-White For information about this presentation, please contact the author Graham Bower-White, For other information, please contact: or visit 1

What is “reasonably practicable”? Graham Bower-White Executive Director Operations TSRhorizons Consulting 2

ALARP – What is reasonably practicable? Graham Bower-White

4 Overview A Reminder Core Concepts ALARP – How it works 2-Step Process

5 MONTARA failure to follow good oilfield practice failure to follow internal procedures lack of understanding of controls in place failure to realise that only one effective barrier was in place and that the integrity of that barrier was compromised A Reminder

6 MACONDO failure to recognise that primary barrier integrity was compromised failure to conduct appropriate tests on controls in place poor design of the blowout preventer failure of the blowout preventer lack of control of ignition sources A Reminder

7 Risk Management Establishing context Risk assessment Risk identification Risk analysis Risk evaluation Risk treatment Monitoring and review Communication and consultation REF: ISO 31000: Risk Management

8 ALARP Background ‘Reasonably practicable’ is a narrower term than ‘physically possible’ … a computation must be made by the owner in which the quantum of risk is placed on one scale and the sacrifice involved in the measures necessary for averting the risk (whether in money, time or trouble) is placed in the other, and that, if it be shown that there is a gross disproportion between them – the risk being insignificant in relation to the sacrifice – the defendants discharge the onus on them. UK Court of Appeal (Edwards v. National Coal Board [1949])

9 ALARP Principle If a measure is practicable and it cannot be shown that the cost of the measure (in money, time and effort) is grossly disproportionate to the benefit gained; then the measure is considered reasonably practicable and should be implemented. The criterion is reasonably practicable not reasonably affordable: justifiable cost and effort is not determined by the budget constraints/viability of a project.

10 Risk-based Decision Making REF: NOPSEMA, N GN0166, ALARP

11 Safety Case Lifecycle REF: NOPSEMA, N GN0166, ALARP

12 Quantitative Risk Analysis REF: NOPSEMA, N GN0166, ALARP

13 Qualitative Risk Assessment NOTE: Example only

14 Qualitative Risk Assessment REF: NOPSEMA, N GN0271, Control Measures and Performance Standards

15 Bow-Ties Fault Tree Event Tree NOTE: Example only

16 ALARP Demonstration So… – We’ve assessed our risk using Qualitative and/or Quantitative risk assessment. Does that mean that risks are demonstrably ALARP?

17 2-Step Process Step 1 – Demonstrate that risks are tolerable/acceptable Step 2 – Demonstrate that all practicable risk reduction measures have been implemented – Justifying what HASN’T been implemented is as important

18 How to get over that 2 nd Step! Identify all further risk reduction measures Assess the potential risk benefit Assess the potential cost ($, risk, schedule) Is cost grossly disproportionate to benefit? – If yes, REJECT measure and document – If no, measure should be implemented

19 Gross Disproportionality ICAF (Implied Cost of Averting a Fatality) *PLL = Probability of Loss of life REF: Safe Work Australia, Guide for Major Hazard Facilities: Safety Case: Demonstrating The Adequacy of Safety Management and Control Measures

20 Case Study: Qualitative Small pipelay barge ~75m in length SOLAS / IMO / Class Compliant Life-rafts only – NO LIFEBOATS Case 1: Littoral waters, no live HC present Is Evacuation risk ALARP? Case 2: Pipelay in vicinity of HC-producing asset Is Evacuation risk still ALARP?

21 Case Study: Quantitative QRA sensitivity analysis shows risk reduction measure would achieve reduction in PLL Therefore: Justifiable Spend= Reduction in PLL x ICAF = 5.0E-03 x 100,000,000 = $500,000 So: if the measure costs less $500,000 or less it should be implemented