March 20, 2008 2008 Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.

Slides:



Advertisements
Similar presentations
“Critical Chain” Project Management Presentation for KCMPUG March 19, 2003 Dave Higgins Consulting, Inc. Website:
Advertisements

6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Critical Path and Gantt
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Theory of Constraints Part II: TOC Concepts
Critical Chain Project Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
11-1 ELC 347 project management Week Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Critical Chain Project Scheduling
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
Importance of Project Schedules
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
INDUSTRIAL & SYSTEMS ENGINEERING
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
THEORY OF CONSTRAINTS ACCT 7320 October 8, 2014.
Critical Chain IOM580 Hiroshi Ochiumi 1. High Probability of Budget Overruns Time Overruns Compromising the Content 2.
Project Management what marketing suggested what management approved
Operations and Production Management
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Midterm Review SE503 Advanced Project Management.
Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Quick Recap.
File:CCPGS05 CC present Page: 1 ETXPGS
Does Goldratt Understand the “Theory” of Constraints? Evaporating the “Do not balance”cloud.
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
More on Scheduling. Recap of Last Class Activity dependencies are shown through CPM/PERT Chart. Critical path Completion date Slack time in non-critical.
1 Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
Lean Accounting & Theory of Constraints Two related concepts ACCT7320, 2/3/09 1.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
© 2000 The TOC Center of Australia Pty Ltd 1 Critical Chain Overview – AIPM 2003 MktgCCSEAV01grh The TOC Centre of Australia Pty Ltd The.
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
Scheduling Work I love deadlines. I love the sound they make as they fly by. -- Douglas Adams.
Theory of Constraints Part I: Introduction. Theory of Constraints (or TOC) Relatively recent development Looks at the practical aspect of making organizational.
Project Time Management
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE. Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
9-1 ELC 347 project management Day 22. Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation.
1 Critical Chain Project Management  A modern approach to dealing with uncertainty in project management (an alternative to PERT)  Developed by Goldratt.
Chapter 16 – Project Management
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Critical Chain Project Scheduling
Constraint Management
ELC 347 project management
Critical Chain Project Scheduling
SE503 Advanced Project Management
Goldratt Research Labs
Reducing Project Duration
Goldratt's Theory of Constraints (TOC)
Theory of Constraints An Introduction
Theory of Constraints Part II: TOC Concepts
Theory of Constraints An Introduction
Presentation transcript:

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer University / Mercer Engineering Research Center

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 2 About the Author Dr. Scott Schultz – assistant professor Mercer University, and consultant at Mercer Engineering Research Center. Industry Experience: 13 years automotive experience – Ford Motor Company. 2 years furniture experience – Furniture Manufacturing Management center. Consulting – manufacturing and military Teaching Experience: 6 years as Industrial Engineer prof. at Mercer Simulation Production, scheduling, inventory control Operations Research others…

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 3 Abstract In this short course we describe and discuss the concept of critical chain management. Critical chain management was originated by Eliyahu M. Goldratt as an outgrowth of his Theory of Constraints with respect to project management. Critical chain management explores why projects tend to be late, and develops an interesting approach to mitigating this problem. Now what does project management have to do with depot maintenance? Depot maintenance is not so much manufacturing, but is really more like project management. We then link the concepts of critical chain management to depot maintenance and how critical chain management can influence one of the depot’s primary measurables, “flow days”.…

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 4 Why This Talk? Critical Chain Management: Applies to anyone involved in project management. Applies to Depot Maintenance.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 5 Project Management - PERT/CPM Classical methods of analyzing projects – PERT/CPM CPM – Critical Path Method: addresses the tradeoff of the increased cost to reduce the time to complete a task, versus the cost reduction of completing the project as a whole. PERT – Program Evaluation and Review Technique: deals with project uncertainty by using the mean and standard deviation of individual task times to determine the probability of completing the overall project within certain time ranges.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 6 Project Management - PERT/CPM PERT/CPM – both methods require knowledge of the critical path. 2 A, B,8C,15 D,12 F,8 E,10 G,11 H,5 I,4 J,2 K,8 L,14 M,5 N,5 0 0 Critical Path – the longest path through the precedence network diagram. Precedence Diagram – graphically describes which tasks must complete before others begin, and which tasks can be performed in parallel.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 7 Critical Chain Management Developed by Eliyaha M. Goldratt – 1997 An application of his Theory of Constraints as applied to project management. First major work on project management since PERT/CPM. Goldratt References: The Goal, a process of ongoing improvement, 1984 Theory of Constraints, 1990 Critical Chain, 1997

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 8 Theory of Constraints (TOC) Overall Idea – The goal of a company is to make money. The theory of constraints is a methodology to help identify what might be hindering a company from obtaining its goal, and how to achieve the goal. The Goal is a fictional account of a manufacturing plant which significantly improves its production capacity (and other measures) through the application of TOC.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 9 Theory of Constraints (TOC) Identify the system’s constraint/bottleneck Exploit the constraint (squeeze the maximum capacity out of it without altering capacity capability) Subordinate everything else, don’t put improvement efforts into non-constraints, focus on bottleneck Elevate if still needing more throughput (add more capacity to constraint) Go back to Identify, (continuous improvement)

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 10 Back to Critical Chain Production World – production throughput is like a chain. Production flows from one operation to the next. Op 10Op 20Op 30Op 40 A chain is only as strong as its weakest link The weakest link is the bottleneck operation No value in improving other links of the chain (e.g. Subordinate everything else)

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 11 Chain Physics -If chained machines all working at full capacity, and capacity is equivalent on each machine, and if there exists any variance in production, the chain will never produce at capacity. -The greater the variance, the less the production. -The longer the chain, the less production. Op 10Op 20Op 30Op 40 -Manufacturing managers/engineers attempt to mitigate the chaining effects

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 12 Critical Chain and Project Management Current State of Project Management World – 1.Only way to protect the whole (project) is through protecting the completion date of each step. 2.Therefore, we pad each step with safety time. 3.We then suffer from three mechanisms, when combined, waste most of the safety time. a.Student syndrome (start as late as possible) b.Multi-tasking (switching between tasks without completing) c.Delays accumulate, advances do not 4.Thus, projects tend to complete late.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 13 Critical Chain and Project Management Why Current State of Project Management? Cause and Effect: Wrong measurement, each task’s (or manager’s) performance is measured to their specific task. No incentive to finish early since re-budget of time/dollars based on “last time” will result. A delay in one step is passed to the next, while an advance in one step is usually wasted before the next.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 14 Critical Chain and Project Management Project Management World – so what is the bottleneck operation in project management? Ans. – the critical path. 2 A, B,8C,15 D,12 F,8 E,10 G,11 H,5 I,4 J,2 K,8 L,14 M,5 N,5 0 0

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 15 Thus, TOC applies to project management where: The bottleneck/weakest link of the chain is the critical path. Identify the critical path Exploit Subordinate Elevate Go back to Identify, Critical Chain and Project Management

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 16 Thus, TOC applies to project management where: The bottleneck/weakest link of the chain is the critical path. Identify the critical path Exploit the constraint – ensure the critical path is never compromised Subordinate Elevate Go back to Identify, Critical Chain and Project Management

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 17 How do you Exploit the constraint? One way in manufacturing: Ensure the bottleneck operation is never idle by maintaining inventory in front of it. Critical Chain and Project Management X Bottleneck Operation Inventory

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 18 How do you Exploit the constraint? On the critical path: Original: With all safety moved to end of project: Critical Chain and Project Management Step 1Step 2Step 3Step 4 Step 1Step 2Step 3Step 4 Safety Buffer Note, only 50% chance of finishing each task on time, Management must change way of thinking, i.e. OK to be late some times.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 19 Thus, TOC applies to project management where: The bottleneck/weakest link of the chain is the critical path. Identify the critical path Exploit the constraint – ensure the critical path is never compromised Subordinate – everything else Elevate Go back to Identify, Critical Chain and Project Management

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 20 How do you Subordinate everything else? To the critical path: Restate task times for non-critical steps, removing safety time and starting them such that safety is at the end. Critical Chain and Project Management Step 1Step 2Step 3Step 4 Safety Buffer Step a1Step a2 Step b1Step b2Step b3 Feeding Buffer Feeding Buffer

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 21 Impact of new way of approaching project management - Critical Chain and Project Management Step 1Step 2Step 3Step 4 Safety Buffer Step a1Step a2 Step b1Step b2Step b3 Feeding Buffer Feeding Buffer Need new performance measures – Performance of critical path (e.g. % completion of c.p.) Measure provided by person working on current critical path task, estimating number of days until finished also monitor remaining days in feeder buffers (modify buffers as actual times realized in preceding steps) Use relative buffer consumption to synchronize priorities and make early course corrections.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 22 Thus, TOC applies to project management where: The bottleneck/weakest link of the chain is the critical path. Identify the critical path Exploit the constraint – ensure the critical path is never compromised Subordinate everything else, Elevate reduce task times, Go back to Identify, Critical Chain and Project Management

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 23 How do you reduce task times? Training Improved methods / technology Improved designs Motivate employees Provide incentives – reward early completion, penalize being late Others? Critical Chain and Project Management

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 24 Thus, TOC applies to project management where: The bottleneck/weakest link of the chain is the critical path. Identify the critical path Exploit the constraint – ensure the critical path is never compromised Subordinate everything else, Elevate reduce task times, Go back to Identify, are there other constraints? Critical Chain and Project Management

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 25 Is the critical path the only constraint? - Critical Chain and Project Management X Safety Buffer X X Feeding Buffer Feeding Buffer Resource X in this case could cause all or some feeding buffers to become exhausted, would this cause all paths to become critical? Hopefully not, must be a better way to manage. X Feeding Buffer Critical path

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 26 Call the resource constraint a critical chain? - Critical Chain and Project Management X Safety Buffer X X Feeding Buffer Feeding Buffer This critical chain could be a longer path than the original critical path. X Feeding Buffer Critical path Critical chain

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 27 Feeding buffers have moved before critical path - Critical Chain and Project Management X Safety Buffer X X Feeding Buffer Feeding Buffer Still a problem for X, top two feeding buffers have X scheduled at the same time. What to do? X Feeding Buffer Critical path Critical chain Feeding Buffer

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 28 Feeding buffers have moved before critical path - Critical Chain and Project Management X Safety Buffer X X Feeding Buffer Feeding Buffer X Feeding Buffer Critical path Critical chain Feeding Buffer

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 29 Depot Maintenance An outsiders view: Depot Maintenance – Is it manufacturing or is it project management? Each aircraft is viewed as a project. Flow days – a key depot performance measure Variability of Process Time – a goal of manufacturing is to eliminate variability the nature of depot maintenance is to manage variability Critical Chain Management – uniquely positioned to manage variability and help reduce flow days.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 30 Depot Maintenance An insiders view: There is inherent variability in repair work making it difficult to follow schedules. There is competition for mechanics, support resources, facilities, and other equipment within and across aircrafts – work waits in queue. Unpredictable / over and above work cause schedule delays Parts shortages cause delays. Some parts have long lead times. Frequent priority changes forces workarounds and constant shifting of resources (Multi-tasking) Administrative delays (inspection reports, customer approval, etc.) Carry over work from one area disrupts progress in subsequent areas. Operations checks and testing can result in rework that cause schedule disruptions late in the project.

March 20, Dixie Crow Symposium, Warner Robins, GA Slide 31 Conclusions Critical Chain Management - explores why projects tend to be late, and develops an interesting approach to mitigating this problem. Move safety to end of project and to feeding buffers Manage feeding buffers Remove multi-tasking Depot Maintenance – more like project management than traditional manufacturing. Manage variability, can’t eliminate. Critical Chain Management – uniquely positioned to manage variability and help reduce flow days.