Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal.

Slides:



Advertisements
Similar presentations
Concrete Fooring & Roofing System
Advertisements

Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Campus Sustainability Green Cleaning Green Cleaning University of California, Santa Barbara October 25, 2005 Byron Sandoval Byron Sandoval Superintendent,
Plantronics Secret Green buildings for developing, manufacturing and marketing green products A complete Green Life Cycle.
May 25, 2015Board of Trustees Meeting Vision: The Neurosciences Research Building is a continuation of the School of Medicine and Indiana University's.
Environmental life cycle assessment. Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of.
1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
CIVE 6900 Sustainability Science and Engineering Fall 2008
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Building With Superior Walls Introducing The Superior Advantage.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Dan Packer Construction Management Senior Thesis April 16, 2002
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
1 Oregon’s Tax Credit for Sustainable Development January 2003 Glenn Hansen, P.E.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
May PUTTING THE NIZ IN PERSPECTIVE : 2012 PUTTING THE NIZ IN PERSPECTIVE.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Presented By: Derek Snover Construction Management.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Cobb County Department of Transportation
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Caretakers House Demolition Decking to STEM and ARTS.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
Climate and Health Summit, Paris, France December 5, 2015.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT PROJECT 10/DS 413/MAY 9, 2012.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Br Anwar Hossain. BUILDING AREAS SQ. FT. PHASES1ST FLOOR2ND FLOORTOTAL 118,85017,55036, ,55317,99551, ,658 29, ,370 36, ,833 23,666.
Commercial Floor Systems
Pearl Condominiums Philadelphia, PA
Residential Wall Systems
Commercial Office Building
David Anderson Mechanical Option
Canton Crossing Tower Baltimore, Maryland
Residential Wall Systems
Council Rock High School South
Outline Introduction Structural Redesign Gravity System
Offsite Applications for Rail Overbuild Part 1
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Thesis Presentation Devin Learn Construction Management Dr. Messner
MATERIALS AND CONSTRUCTION I
Commercial Floor Systems
Residential Wall Systems
Residential Wall Systems
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Lehigh Valley Heritage Center
Wellington Condominiums Project
Commercial Floor Systems
Children’s Hospital Update
Masonry Bearing Walls.
Multi-Family Fourplex Apartment
Presentation transcript:

Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune December , 000 sq ft ExpansionTotal Cost = $181 million

Site Layout Arial photos taken by: Frank Wiese of The Morning Call, July

Technical Analysis 1 Gain higher LEED rating –Currently Silver –Obtain a Gold rating Analysis of rooftop rain water collection system for grey water use Waterless urinals Courtesy of:

Technical Analysis 2 Control air quality to reduce risk of illness to workers and patients in existing building Alternate phasing of construction to allow cleaner facilities Analysis of products and techniques to prevent contaminants entering the building

Technical Analysis 3 Propose using a pre- cast hollow core floor system Reduce amount of labor Reduce schedule time Develop system cost comparison Current System: Poured Slab on Metal Deck Alternate System: Pre-cast Hollow Core Concrete Floor

Questions