July 8, 2014 TO:TO:Centralia City Council Members FROM:Scott Boettcher, Staff, CRBFA (360/480-6600, SUBJECT:Brief.

Slides:



Advertisements
Similar presentations
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Advertisements

Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Fishery Management Overview - Context Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin 7:00 p.m., March 13, 2013 Aberdeen.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin 7:00 p.m., March 6, 2013 City of Cosmopolis.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Chehalis River Basin Overview of Work Program and Issues September 25, 2013 Aberdeen Rotary Club 12:00 Noon.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
2010 Squak Valley Park Restoration Project City of Issaquah.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Chehalis River Basin Overview of Work Program and Issues July 24, 2013 WA State Department of Ecology.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Kansas City Industrial Council Hydrology and Hydraulics
Columbia River salmon : Who (or what) will save them? John Williams Klarälven meeting in Karlstad 9 May 2011.
Stock Status of Steelhead In California Katie Perry, California Department of Fish and Game.
1 Regional Report San Joaquin River Hydrologic Region.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Actions and Activities Benefiting the Basin February 2013
AFRP Area of Coverage Paynes and Antelope Creek Antelope Creek: 123 square miles Fall-run Chinook, spring-run Chinook, steelhead. 32 miles.
Thomas R. Payne & Associates Update on Flood Storage Fish Study Presented by Paul Schlenger, Bob Montgomery, Jim Shannon June 15, 2011.
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
ESA-listed Snake River Salmon: What’s the link to Snake River dams? John G. Williams NOAA Northwest Fisheries Science Center Seattle
United for the benefit of all Regional Coordination.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Setback Levees: Hydraulic, Ecologic and Economic Benefits Tony Melone, PhD, PE, CFM 2011 ASFPM National Conference.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
1 Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee Actions and Activities Benefiting the Basin 3:00 p.m., July 8, 2013.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
FLOODPLAIN MANAGEMENT AND THE U.S. ARMY CORPS OF ENGINEERS Paul Bourget Directorate of Research and Development Headquarters, U.S. Army Corps of Engineers.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin February 2013.
Population - 44,301 18% - Aged 65+ Household Median Income- $29,530 Jan.-March 2004 unemployment 14 % Demographics.
Watershed Restoration Overview for the Klamath Basin.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Aquatic Hyperspectral Data Needs and desires. Resolution Need fine scale resolution to get data from small delta channels Channels range in size, with.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
Project Subcommittee Subcommittee Purpose/Goals: – Develop a master inventory of flood-related projects in the Chehalis Basin Seven sets of discussions:
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
Note: This presentation contains only preliminary research results. If you have any questions, please contact Julie Vano at Thanks.
March Urban Flood Risk Management. March Objectives Understand the Nature of Flooding & Flood Damage Alleviation Understand the Nature of.
Oregon Chub (oregonichthys crameri) Critical Habitat Designation Chris Cusack Judith Dempsey Biao Huang Tae-Young Kim Caiwen Wu.
Janes Creek and McDaniel Slough Past, Present, and Future.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
The Oregon Watershed Council Model, USA
Silver Jackets Orientation
Thorp Mill Ditch Assessment ( )
Presented By: Fran Borcalli, P.E. Program Manager
LT Creek Floodplain Risk Management Study & Plan
Upper Colorado River Endangered
MANAGING YOUR FLOOD RISK All stakeholders contribute to risk reduction
Hydrologic Engineering
Presentation transcript:

July 8, 2014 TO:TO:Centralia City Council Members FROM:Scott Boettcher, Staff, CRBFA (360/ , SUBJECT:Brief Update of Flood Hazard Reduction Activities in the Chehalis Basin Outreach/Education Presentation: 90/outreacheducation.aspx May 2014 Public Meeting: Local Project Construction Photos: 1.Local Projects Completed (or by flood season):  Adna Levee.  Bucoda Water Supply Levee.  Montesano WWTP Levee.  Chehalis Tribe Sickman-Ford Overflow Bridge.  5 Livestock and Equipment Pads.  2 Livestock Evacuation Routes.  10 Additional Livestock/Equipment Pads.  2 Capacity Expansions For Existing Pads.  1 Evacuation Route.  Montesano Sheet Pile Wall.  Airport Levee Phase IA.  Pe Ell WWTP Protection Levee.  Map = 2.Local Projects Proposed for Further Review/Evaluation/Costing**:  Kirkland Road Flooding Study.  SR6 Bypass and Road Raise.  Dillenbaugh Creek Realignment.  Chehalis Main Street Regrade.  Salzer Creek.  Preliminary designs/costs (Summer 2014).  Map = 3.Aquatic Species Enhancement**:  Salmon populations are 15-25% of historic levels.  Evaluating habitat enhancement options, benefits, costs (barrier removal, riparian enhancement, water quantity/quality, etc.).  Preliminary plan (Summer 2014).  $63M - $134M. 4.Upper Basin Retention Structure**:  Evaluating options, benefits, costs, impacts: o Flood Retention only ($265M - $421M). o Multipurpose (fish, water, hydro) ($369M - $708M).  Preliminary design (Summer 2014). 5.I-5 Protection**:  Evaluating protecting I-5 w/ walls, levees, berms.  Dropped raising or relocating I-5.  Preliminary design (Summer 2014).  $80M - $100M. 6.Flood Proofing**:  Evaluating options, benefits, costs of flood proofing residential, commercial, agricultural structures in floodplain.  Compare costs w/ and w/out Dam (Summer 2014).  $92M ($57M, $21M, $14M). 7.Basin Relationships/Partnerships:  Very strong. 8.Looking Ahead:  Sept – Technical, policy, public workshops.  Nov – Recommendations to Gov./Leg.  $500M - $1B.

Salmon Runs Winter-run Steelhead TR Year N umb er of Ret urn s Coho ESC Coho TR Fall-run Chinook ESC Fall-run Chinook TR Spring-run Chinook ESC Spring-run Chinook TR Winter-run Steelhead ESC (Pg. 2) 11

Other Fish and Aquatic Species Olympic Mudminnow Redside Shiner Northern Pikeminnow Longnose Dace Largescale Sucker Sculpin (6 species) Oregon Spotted Frog Andrew O’Connor Western Toad 14 (Pg. 3)

Flood Retention Only Reservoir Dam Height = 227’ Spillway Crest Elev. = 628 Dam Crest Elev. = 654 Area = 860 Acres River Inundation Length = 6.8 mi MaximumStorage = 65K acre/feet 27 (Pg. 4)

Multi-purpose Reservoir Overview Dam Height = 287’ Spillway Crest Elev. = 687 Dam Crest Elev. = 714 Area = 1,307 Ac River Inundation Length = 7.5 mi Maximum Storage = 130K acre/feet 29 (Pg. 5)

Protect I-5 with walls and levees Project Cost: $ 80 – 100 Million (Pg. 6)

(Pg. 7) Floodproofing - Structures Affected 55 Summary of Structures At Risk of Flooding in Chehalis River Floodplain Number of StructuresBaselineWith Dam and Airport Levee Dec Year100-Year20-Year10-YearDec Year100-Year Flooded >1.0 feet >2.0 feet >3.0 feet >4.0 feet >5.0 feet Assessed Value of Improvements Inundated ($Million) $238$411$137$30$13$64$206$73 Cost to Floodproof all Inundated Structures ($Million) $146$273$92$20$9$46$149$50 Residential ($ Mil)$107$205$57$10$4$28$101$28 Commercial ($ Mil)$26$44$21$6$3$11$26$12 Agricultural ($ Mil)$13$24$14$4$2$7$22$10

12 1.Basin-Wide Relationships (Pg. 8)