Value Engineering workshop for Senior Citizen Bathroom

Slides:



Advertisements
Similar presentations
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
RESIDENTIAL PROJECT JOY ADINATH - 1. Presenting J OY A DINATH - 1 Bhandup.
Elevation Skilled & quality craftsmanship of Merlin tradition to make the complex a symbol of class. Foundation Reinforced cement.
October 11, Trace Little, Director of Purchasing Introduction and Agenda Reasons for a new procedure Who was involved in the process Judy Smith,
Steps Toward Decent, Affordable Housing Habitat for Humanity in Amecameca, Mexico ©, 2006 © Scott Moore, 2006.
Weifa Companies Co.,Ltd. Introduction Company Company Products Products Application Application Quality System Quality System Products Development Products.
Chapter 16 Floor Plan Symbols.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
Civil Engineering & Architecture 2.3 Residential Design.
King Fahd university of Petroleum and Minerals Construction Engineering and Management Department CEM 512 Unused Space in Mosque To: Prof. Sadi Assaf Prepared.
1 Institutional Support Services Capital Project Process.
V.E. of Selecting Flooring Materials KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College of Environmental Design Construction Engineering & Management.
Kaj Jørgensen, Aalborg University, Department of Production and Jørn Skauge, School of Architecture Aarhus, Department of Architectural Design Building.
Presentation Template
House Plans and Home Design. House Plan Symbols Wall: Window: Door: Shower: Tub: Toilet:
BETHEL HEIGHTS. INTRODUCTION  Bethel Heights is located at Kammanahalli.  Approved by BBMP  Project occupied area is 11,000 Sft  24 units + Pent house.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Computing Laboratory Building & Facilities Overview Role of Building & Facilities Manager Helping you Cleaning Reporting problems Interface with the Estates.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
How to build a two storey house
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Office Layout Techniques and Space Requirements
Modifying Buildings to Meet the Needs of Seniors Housing Seniors in Rural America Resources, Advocacy and Practice Burlington, VT  June 6, 2012.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Finishing the Building
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Chapter 26 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
Objective 1.03: Explain ways to adapt housing to meet special needs.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Green Homes Nancy Sierra Nicholas Acuavera 1A
Technical department - boclair academy Layers used in a cad system INTRODUCTION A CAD drawing can be built up in several layers (like clear film overlays)
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
By Angela Forte, Michelle Gagnon, Kerri Morse, & Sam Oosterman.
Objective 1.03: Explain ways to adapt housing to meet special needs.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
Orthographic Drawings
RENO IDEAS.
RENO IDEAS. LIVING ROOM LIVING ROOM EG. 1 Features: Track lights Featured wall (brick style) Wood flooring ceiling fan.
North Hills Junior High School Schematic Lighting Design
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
KRISHNA APRA GROUP Presents ROYAL COURT Noida Extension(West G. Noida)
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Dream Flower Akademia – Flats in Cochin. Floor Plans.
4 Trendy Walk-In Shower Styles
Upon completion of this module, you will be able to:
Safety and Prevention of Typical Fire Plan
Fall 2017 Update: Physical properties and sinking fund
Assembly And Installation Of Ikea Kitchen Cabinets
Table (3.1)- the averages of the 10 models costs
RIBA Plan of Work 2013.
Planning and Scheduling a SIMPLIFIED Construction Project
Pre-Contract Cost Control
Peninsula Adress One Peninsula Adress One is coming up with 1 BHK, 2 BHK and 3 BHK super deluxe apartments of size range sq. ft. of area.
Computer-Aided Design (CAD) Competition
FINISHES (FLOOR, WALL & CEILING)
Introduction into CAD.
Introduction into CAD.
::Address Location:: 1450, Madurdaha, Hussainpur,
Ashfield District Council Disabled Facilities Adaptations
Building standards Mr. Da Silva.
Floor Plans and Symbols
RiverView Condominiums II Chicago, IL
RIBA Plan of Work 2013.
Presentation transcript:

Value Engineering workshop for Senior Citizen Bathroom Introduction Value Engineering workshop for Senior Citizen Bathroom

AGENDA Introduction & Objective Team FAST Diagram Concept Evaluations Proposed Concept Sharpened ideas Implementation Plan Savings Summary Executive Summary Q & A

Current Situation Introduction Residential complex designed for the middle-means elderly of HK To encourage and enable healthy living and ageing in place

Team Objectives To assess alternative design of bathrooms To improve the proposed design in terms of construction cost/period and required functions

VM-7 Sandy Tang Cost Estimator H.K. Poly U Thomas Wong VM - 7 (HK) VM-7 NAME JOB FUNCTION COMPANY & LOCATION Sandy Tang Cost Estimator H.K. Poly U Thomas Wong Quantity Surveyor Beria Consultants Ltd. Ken Leung Centre Operator Shimizu Corporation C. F. LAI P&D Engineer Water Supply Department Henry Luk Architect Housing Department Simon Chow Construction Engineer  Dragages HK Zhang Hong Senior Citizen CityU

C.F, Zhang Hong, Sandy, Henry, Thomas Team members C.F, Zhang Hong, Sandy, Henry, Thomas Ken, Simon

Function Identification FAST Diagram Function Identification FAST Diagram

FUNCTION - Active Verb / Measurable Noun Analysis – Cost Function Matrix   DIRECT FUNCTION - Active Verb / Measurable Noun PART or OPERATION QTY. COST Ensure Heat Improve Install $HK Privacy Water Appearance Finishings Structural Frame 480,000 80% Internal Finishing 1,600,000 30% 40% Doors 80,000 70% Windows Fittings Plumbing & sanitary fittings 216,000 Gas Heater 270,000 100% Electrical 120,000 MVAC 60,000 TOTALS $2,986,000 $440,000 $270,000 $504,000 $640,000 FUNCTION - PERCENTAGE: 100.00% 14.74% 9.04% 16.88% 21.43% Details

Criteria of Consideration Suitability of the elderly Proposed Concept Criteria of Consideration Suitability of the elderly Construction effectiveness Enhancement of facilities Cost effectiveness Appearance Ease of maintenance Minimization of wastage

Walls Improve Layout Design Fittings Door/partition Ceiling Floor Sharpened Ideas Walls Improve Layout Design Fittings Ceramic tile in wet & wall paper in dry area See picture Install an additional grab bar to shower area Glue wall tile directly to concrete Shorter ceilings (2.7m to 2.5m) Emergency call button Delete window sill Door/partition Shower head with massage function Ceiling Screen instead of door Foldable chair in shower Scrap finish Change (1) partition wall to integrate furniture Install UV light False ceiling to decrease wall finish Change door/wall to moveable transparent partition Install moveable clothes drying racks Perforated false ceiling Enlarge door area Emergency lighting Floor P & D Shelf by basin Imitative granite tile Transparent pipes; use shared pipes Change fittings, WC, basin and mixer to better quality and reasonable cost to total less than $3000 per unit Delete skirting/cove tile Use plastic pipe (PVC) (Class B) Install basin cabinet Hygienic P&D design

Ceramic tile in wet and wall paper in dry area $150,000.00 2 Saving summary Item PROPOSAL TITLE   Savings Investment 1 Ceramic tile in wet and wall paper in dry area $150,000.00 2 Blue wall tiles directly to concrete 3 Shorten ceiling (2.7m to 2.5m) $700,000.00 4 Share facilities to reduce P&D $270,000.00 5 Imitative granite floor tile $20,000.00 6 Delete skirting coved tile $100,000.00 7 Delete ceiling c/s rending $30,000.00 8 Facilities improvement fittings $810,000.00 9 P&D improvement (against SARS) 10 Possible Saving in Foundation 11 Replace door by screen $210,000.00 TOTALS - $1,580,000.00 $830,000.00 Net saving $750,000.00

Figure 1 Proposed layout Implementation Plan Figure 1 Proposed layout

Finishes schedule Finishes schedule

Enhance bathroom facilities and safety for the senior citizens Executive summary Total saving: $750,000.00 Enhance bathroom facilities and safety for the senior citizens Increase usable floor area by 100 sq. ft. Improve appearance Improve environment and safety during construction stage Reduce storey height

Q&A ? What is waste · Read the statement and develop

The End