1 4/9/2009 PHENIX WEEKLY PLANNING 4/9/2009 Don Lynch.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1 05/14/2009 PHENIX WEEKLY PLANNING 5/14/2009 Don Lynch.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1 4/30/2009 PHENIX WEEKLY PLANNING 4/30/2009 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 3/19/2009 PHENIX WEEKLY PLANNING 3/19/2009 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
1 3/12/2009 PHENIX WEEKLY PLANNING 3/12/2009 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
1 4/16/2009 PHENIX WEEKLY PLANNING 4/16/2009 Don Lynch.
1 11/12/2009 PHENIX WEEKLY PLANNING 11/12/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 05/07/2009 PHENIX WEEKLY PLANNING 5/07/2009 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
1 10/15/2009 PHENIX WEEKLY PLANNING 10/15/2009 Don Lynch.
1 05/21/2009 PHENIX WEEKLY PLANNING 5/21/2009 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
1 6/4/2009 PHENIX WEEKLY PLANNING 6/4/2009 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 8/20/2009 PHENIX WEEKLY PLANNING 8/20/2009 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 4/9/2009 PHENIX WEEKLY PLANNING 4/9/2009 Don Lynch

2 4/9/2009 Next Maintenance Access Day – April 15 (A Very Taxing Day) - RPC noise problems improved significantly with LV filter last week, Do we need to do more? - More measurements for RPC Installation? - AC Work? - Other tasks ?

3 4/9/2009 Run Support & Other Ongoing Work Run Technical Support (mech, elec., gas) As needed  always takes priority RPC Factory Support (continuing) (see slides later) Prep for 2009 Shutdown Design PC1 East maintenance support fixtures design 3/31, fabrication 5/31 MMS Scaffolding Design design Done, ordering/fabrication 5/1 RPC3 North installation Prep Installation plan (including inst’n site prep plan) 3/31 Installation fixture design 4/30 Installation fixture fabrication 6/26 Upgrades Support New Beampipe supports (back logged) NCC prototype design support (on-going) VTX fabrication tooling design (on-going) VTX installation design (on-going) FVTX design/eng’g support (no support req’d yet) Maintenance & Overhead Tasks Procedure Review/Updates (ongoing) Rack Room, AH, Trailer, Mixing House, etc. (ongoing) ’09 Technical Support

4 4/9/2009 PC1 East Repair Fixturing Design Repairs to be performed during ’09 Shutdown New Column Supports Under railway extensions New Railway extensions will allow DC to be pulled out ~ 3 feet more Access to PC1 is adequate to remove and replace module Drawings at CS for quote

5 4/9/2009 MMS scaffolding Designed for MuTr installation. Approved in 2000 for use. Stress analysis done for worst case. Current design has minor modifications. Concept approved at C-A Design Review Bargaining Unit negotiations are next

6 4/9/2009 RPC Factory Support Tasks: Design and order environmental control system for Burn-In Test Stand (in progress) Assemble gap & module storage with humidity control, 1 st humidity control unit received. (assembly in-progress) Assemble tilting transport table (in progress) Assemble burn-in test stand (bike rack) (after TTT complete) Extend gas, electric and safety systems to Burn-In Test Stand (in progress)

7 4/9/2009 RPC Factory

8 4/9/2009 RPC Factory Concept approved at C-A Design Review, with minor corrections Fabrication in progress Tilting Transport Table

9 4/9/2009 RPC Factory Burn In Test Station For Octant and Half Octant Burn-in Tests Mechanical Requirements: Slots for 20 detector units, max. 10 under test and 10 storage Each detector weighs ~ 750 lb Each slot to have 2 rollers Separation between rollers spaced to allow half octant to rest in slot with unit center of gravity mid way between rollers Rollers must be sufficiently close to catch unit before center of gravity passes first roller Concept approved at C-A Design Review waiting in the task queue

10 4/9/2009 RPC 3 North Installation Tooling Concept

11 4/9/2009

12 4/9/2009

13 4/9/2009

14 4/9/2009

15 4/9/2009

16 4/9/2009

17 4/9/2009

18 4/9/2009 New Beampipe PHENIX SCD Brush- Wellman CAP CAP Approval sent to B/W. Quotes rec’d from CS for spools & Transitions

19 4/9/2009 New Argon Dewar Pros and Cons 1.Safety – The existing 160 liter dewars we are using weigh 750 pounds each. They have to be taken off a rack truck by hand, then they are wheeled by hand cart about 25 feet to the manifold to be hooked up. This is not the easiest or safest operation we could be employing, especially in the inclement weather (ice, snow, rain, wind, etc.). The tank is filled about once a month by their driver. 2.Cost – approximate savings to PHENIX = $ / year. 3.Quality of delivered product – Much better for PHENIX detectors. There would be no disconnecting of gas lines as is now, introducing air contamination every time we change dewars (2-3 times a week). 4.Automatic delivery – the proposed system has a solar powered telemetry that “phones home” when the tank gets down to 1/3 full, triggering a delivery order. 5.No demurrage problems – this one is close to all of our hearts. (Priceless)

20 4/9/ ’20’ New storage pad for empty gas cylinders, 20’x 20’, 9” min thick. reinforced concrete New Argon Dewar Pad, 16’ x 20’, 12” minimum thickness, reinforced concrete. New Argon Dewar

21 4/9/2009 A New Argon Dewar

22 4/9/2009 New Argon Dewar

23 4/9/2009 Mixing House thermometers not working properly Roof leaks in utility bathroom at northwest corner behind tech offices and over door between rack room and assembly hall. Trailer bathroom slop sink (for Custodians). Heat wrap tape for trailer bathroom toilet drains to preven freeze/clogging in winter. Improved Rack Room AC performance (This item has been addressed time and again but unsatisfactorily. Currently the AC fails periodically and is repaired only to fail again. On-condition maintenance is not adequate…an engineered solution is needed.) Back bathroom plumbing noise AH slop sink leak Icy conditions at mixing house north stairs 2009 Building Maintenance Issues These items passed on to Fred K.

24 4/9/2009 Shutdown ’09 Major tasks (expect 5 month shutdown): 2009 shutdown Begins June 28 End run, remove wall, MuID collars down, EC to AH (3 weeks) Install Station 1 South scaffolding (1 week) Install Station 2/3 scaffolding (2 weeks) PC1 East repair (4 weeks) Install stations 1, 2 and 3 south MuTrigger FEE’s (12 weeks) MuTr decapacitations: station 3 south (3 weeks) RPC Station 3 North (see next slide) Mechanical/Electrical Plumbing installation of (4) new DCM racks Add Ar Dewar and expand gas pad to add storage (12 weeks) Prep for future upgrades/existing equipment maintenance & Repair (as necessary) Shutdown ’09

25 4/9/2009 RPC3 North Installation Schedule Installation Concept FinalizedMar. 31 Half-Octant Brackets, Connecting Blocks, under detector translating support designMar. 31 Installation Fixturing and Tooling DesignApr. 30 Redesign crystal palace/IR Gas BarrierMay 29 End of Run 9 June 28 Fixturing/Tooling, Brackets/Block/support FabricationJune 30 Move Shielding/Remove Crystal PalaceJune 29-July31 Move cable trays and piping in gap 5June 29-July 31 Simulated (practice) installation with new fixturing/ toolingJuly 13-July 31 Install, level & survey support structure Aug. 3 - Aug 14 Half Octant Testing and Assembly Complete Aug. 17- Sep. 18 (1 st half Octant ready by Aug.17, 16 th by Sep.18) Mechanical Install Align & survey RPC3 N Aug 17 – Sep. 30 Install 3 elect. Racks, all cables & gas systemOct. 1 – Oct. 30 Commissioning Nov. 1 – Nov. 30 Install new crystal palace/IR Gas Barrier & ShieldingNov. 1 – Nov. 30 Start Run 10Dec. 1

26 4/9/2009 Safety, Security, etc. 1. CPR Training for Electrical Safety 1 – To Be set up next week. Let me know if you need/want to take the course and I’ll add your name to the list when I set it up. 2. It should be noted that only BNL/CAD approved PPE is acceptable for use at work. Contact P. Cirnigliaro for appropriate PPE specifications and requirements before purchasing. 3. Reminder to PHENIX collaborators- Any tours must be cleared through Carter Biggs, Ed O’Brien and me. We are fabricating tools and equipment for the shutdown in the AH and electrical assembly room. Care should be taken to stay away from assembly and fabricating areas. (Potential sharp edges, tripping hazards, aerborne metal chips etc.)

27 4/9/2009 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: Happy Passover